2003 JEEP GRAND CHEROKEE Panel

[x] Cancel search: Panel

Page 1241 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual FuseandBatteryin the index in this service man-
ual for the location of additional service information
covering the ignition-off draw fuse and the battery.
FUSE COVER
REMOVAL
(1) Disconnect and isolat

Page 1242 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual the vehicle. The power outlet base and mount are
secured by a snap fit within the quarter trim panel.
A plastic protective cap snaps into the power outlet
base when the power outlet is not being used,

Page 1243 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (3) Look inside the rear power outlet receptacle
base and note the position of the rectangular retain-
ing bosses of the mount that secures the receptacle
base to the right quarter trim panel (Fig. 21

Page 1254 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual CAUTION: DO NOT use engine or transmission oil,
mineral spirits, or kerosene.
(3) Honing should be done by moving the hone up
and down fast enough to get a crosshatch pattern.
The hone marks should IN

Page 1299 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (9) Lower the engine until it is properly located on
the engine mounts.
(10) Install the through bolts and tighten the nuts.
(11) Lower the jack stand and remove the piece of
wood.
(12) Install the en

Page 1376 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual NOTE: When installing oil pan gasket/windage tray,
start four pan bolts at each corner before tightening
oil pickup tube. This will keep pan gasket in align-
ment.
(3) Install oil pump pick-up tube us

Page 1398 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual EXHAUST SYSTEM
TABLE OF CONTENTS
page page
EXHAUST SYSTEM
DESCRIPTION - EXHAUST SYSTEM.........1
DIAGNOSIS AND TESTING - EXHAUST
SYSTEM.............................3
SPECIFICATIONS
TORQUE.............

Page 1402 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (1) Raise and support the vehicle.
(2) Saturate the bolts and nuts with heat valve
lubricant. Allow 5 minutes for penetration.
(3) Remove nuts from the catalytic converter and
exhaust pipe flange conn