2003 JEEP GRAND CHEROKEE Power System

[x] Cancel search: Power System

Page 1376 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual NOTE: When installing oil pan gasket/windage tray,
start four pan bolts at each corner before tightening
oil pickup tube. This will keep pan gasket in align-
ment.
(3) Install oil pump pick-up tube us

Page 1390 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual TIMING BELT/CHAIN AND
SPROCKETS
REMOVAL
(1) Disconnect negative cable from battery.
(2) Drain cooling system (Refer to 7 - COOLING -
STANDARD PROCEDURE).
(3) Remove right and left cylinder head covers

Page 1396 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (22) Install timing chain cover (Refer to 9 -
ENGINE/VALVE TIMING/TIMING BELT / CHAIN
COVER(S) - INSTALLATION) and crankshaft
damper (Refer to 9 - ENGINE/ENGINE BLOCK/VI-
BRATION DAMPER - INSTALLATION

Page 1423 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual STANDARD PROCEDURE - FUEL SYSTEM
PRESSURE RELEASE
Use following procedure if the fuel injector
rail is, or is not equipped with a fuel pressure
test port.
(1) Remove fuel fill cap.
(2) Remove fuel pum

Page 1424 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual SPECIAL TOOLS
FUEL SYSTEM
FUEL FILTER/PRESSURE
REGULATOR
DESCRIPTION
The combination fuel filter/pressure regulator is
located in front of the fuel tank and above the rear
axle (Fig. 3). It is transve

Page 1426 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (3) Apply a small amount of clean engine oil to
o-rings.
(4) Position filter/regulator to body and install 2
bolts. Tighten bolts to 3 N´m (30 in. lbs.) torque.
(5) Connect 3 fittings. Refer to Quick

Page 1427 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (1) Remove fuel tank. Refer to Fuel Tank Removal/
Installation.(2) Remove fuel pump module. Refer to Fuel Pump
Module Removal/Installation.
(3) Remove electrical wire connector at sending
unit termina

Page 1429 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (5) Connect (-) and (+) test cable leads into LCS
adapter receptacles. Use10 amp (10A +)receptacle
and common (-) receptacles.
(6) Gain access to MAIN MENU on DRB screen.
(7) Press DVOM button on DRB.