2003 JEEP GRAND CHEROKEE Power distribution center

[x] Cancel search: Power distribution center

Page 352 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (5) Install and tighten the nut that secures the
battery positive cable eyelet terminal to the B(+) ter-
minal stud on the starter solenoid. Tighten the nut to
11.3 N´m (100 in. lbs.).
(6) Install an

Page 353 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual OPERATION
The battery tray provides a secure mounting loca-
tion and supports the battery. On some vehicles, the
battery tray also provides the anchor point/s for the
battery holddown hardware. The ba

Page 354 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual INSTALLATION
(1) Clean and inspect the battery tray and support
unit. Refer to the procedures in this section of the
service manual.
(2) Install the battery temperature sensor onto the
battery tray. R

Page 356 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual ²a faulty or improperly adjusted switch that
allows a lamp to stay on. Refer to Ignition-Off Draw
Test in 8, Battery for more information.
INSPECTION
The Powertrain Control Module (PCM) monitors
crit

Page 363 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual INSPECTION
For complete circuit diagrams, refer toStarting
Systemin the Contents of Group 8W - Wiring Dia-
grams. Before removing any unit from the starting
system for repair or diagnosis, perform the

Page 364 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (b) If the voltage reads above 9.6 volts and the
current (amperage) draw reads below specifica-
tions, refer toFeed Circuit Testin this section.
(c) If the voltage reads 12.5 volts or greater and
the

Page 369 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (8) Remove the starter motor from the engine com-
partment.
INSTALLATION
(1) Position the starter motor in the engine com-
partment.
(2) Reconnect the solenoid terminal wire harness
connector to the c

Page 370 of 2199

JEEP GRAND CHEROKEE 2003 WJ / 2.G Workshop Manual (1) Remove the starter relay from the PDC. Refer
toStarter Relayin the Removal and Installation
section of this group for the procedures.
(2) A relay in the de-energized position should
have continuit
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 ... 96 next >