2003 CHRYSLER VOYAGER C3 voltage

[x] Cancel search: C3 voltage

Page 1395 of 2177

CHRYSLER VOYAGER 2003  Service Manual (4) At the dash panel, install the cable retainer
clip between the end of the throttle cable fitting and
grommet
(5) From the engine compartment, rotate the
throttle lever wide open and install the th

Page 1636 of 2177

CHRYSLER VOYAGER 2003  Service Manual OPERATION
The function of an accumulator is to cushion the
application of a frictional clutch element. When pres-
surized fluid is applied to a clutch circuit, the appli-
cation force is dampened by f

Page 1680 of 2177

CHRYSLER VOYAGER 2003  Service Manual INSTALLATION
(1) Using Tool C-4193, install oil pump seal (Fig.
290).
(2) Install transaxle to vehicle (Refer to 21 -
TRANSMISSION/TRANSAXLE/AUTOMATIC - 41TE
- INSTALLATION).
SHIFT INTERLOCK SOLENOID

Page 1687 of 2177

CHRYSLER VOYAGER 2003  Service Manual OPERATION
The Input Speed Sensor provides information on
how fast the input shaft is rotating. As the teeth of
the input clutch hub pass by the sensor coil (Fig.
310), an AC voltage is generated and s

Page 1688 of 2177

CHRYSLER VOYAGER 2003  Service Manual SPEED SENSOR - OUTPUT
DESCRIPTION
The Output Speed Sensor is a two-wire magnetic
pickup device that generates an AC signal as rotation
occurs. It is threaded into the transaxle case (Fig.
313), sealed

Page 1695 of 2177

CHRYSLER VOYAGER 2003  Service Manual OPERATION
The relay is supplied fused B+ voltage, energized
by the PCM/TCM, and is used to supply power to the
solenoid pack when the transmission is in normal
operating mode. When the relay is ªoff

Page 1735 of 2177

CHRYSLER VOYAGER 2003  Service Manual DIAGNOSIS AND TESTING
DIAGNOSIS AND TESTING - WATER LEAKS
Water leaks can be caused by poor sealing,
improper body component alignment, body seam
porosity, missing plugs, or blocked drain holes. Cen-

Page 1846 of 2177

CHRYSLER VOYAGER 2003  Service Manual SUNROOF
TABLE OF CONTENTS
page page
SUNROOF
DESCRIPTION........................113
DIAGNOSIS AND TESTING - SUNROOF.....113
DRAIN TUBE
REMOVAL............................116
INSTALLATION...............