DIAGNOSIS AND TESTING - PCV SYSTEM
WARNING: APPLY PARKING BRAKE AND/OR
BLOCK WHEELS BEFORE PERFORMING ANY TEST
OR ADJUSTMENT WITH THE ENGINE OPERATING.
(1) With engine idling, remove the hose from the
PCV valve. If the valve is not plugged, a hissing
noise will be heard as air passes through the valve. A
strong vacuum should also be felt when a finger is
placed over the valve inlet.
(2) Install hose on PCV valve. Remove the
make-up air hose from the air plenum at the rear of
the engine. Hold a piece of stiff paper (parts tag)
loosely over the end of the make-up air hose.
(3) After allowing approximately one minute for
crankcase pressure to reduce, the paper should draw
up against the hose with noticeable force. If the
engine does not draw the paper against the grommet
after installing a new valve, replace the PCV valve
hose.
(4) Turn the engine off. Remove the PCV valve
from intake manifold. The valve should rattle when
shaken.
(5) Replace the PCV valve and retest the system if
it does not operate as described in the preceding
tests.Do not attempt to clean the old PCV valve.
If the valve rattles, apply a light coating of Loctitet
Pipe Sealant With Teflon to the threads. Thread the
PCV valve into the manifold plenum and tighten to 7
N´m (60 in. lbs.) torque.
Fig. 10 PCV VALVE 2.4L
1 - PCV Valve
Fig. 11 PCV VALVE 3.3/3.8L
Fig. 12 Engine Off or Engine Backfire No Vapor
Flow
Fig. 13 High Intake Manifold Vacuum Minimal Vapor
Flow
Fig. 14 Moderate Intake Manifold Vacuum Maximum
Vapor Flow
RSEVAPORATIVE EMISSIONS25-17
PCV VALVE (Continued)
ProCarManuals.com
ABS FASTENER TORQUE,
SPECIFICATIONS......................5-79
ABSORBER - DESCRIPTION, SHOCK.......2-36
ABSORBER - INSTALLATION, SHOCK......2-38
ABSORBER - OPERATION, SHOCK........2-36
ABSORBER - REMOVAL, SHOCK..........2-36
ABSORBER (UPPER BUSHING) -
ASSEMBLY, SHOCK....................2-37
ABSORBER (UPPER BUSHING) -
DISASSEMBLY, SHOCK.................2-36
A/C COMPRESSOR - DESCRIPTION......24-63
A/C COMPRESSOR - OPERATION........24-63
A/C COOL DOWN TEST - DIAGNOSIS
AND TESTING........................24-4
A/C DISTRIBUTION DUCT -
INSTALLATION.......................24-53
A/C DISTRIBUTION DUCT - REMOVAL....24-53
A/C HEATER CONTROL - INSTALLATION....24-9
A/C HEATER CONTROL - REMOVAL.......24-9
A/C PERFORMANCE TEST - DIAGNOSIS
AND TESTING........................24-5
A/C PLUMBING - CAUTION.............24-61
A/C PLUMBING - WARNING............24-61
A/C PRESSURE TRANSDUCER -
DESCRIPTION.......................24-10
A/C PRESSURE TRANSDUCER -
DIAGNOSIS AND TESTING.............24-10
A/C PRESSURE TRANSDUCER -
INSTALLATION.......................24-11
A/C PRESSURE TRANSDUCER -
OPERATION.........................24-10
A/C PRESSURE TRANSDUCER -
REMOVAL..........................24-10
ACCELERATOR PEDAL - INSTALLATION . . . 14-24
ACCELERATOR PEDAL - REMOVAL.......14-23
ACCESSORY DRIVE BELT - DIAGNOSIS
AND TESTING.........................7-7
ACCESSORY DRIVE BELT TENSION,
SPECIFICATIONS.......................7-5
ACCESSORY RELAY - DESCRIPTION . . . 8W-97-2
ACCESSORY RELAY - DIAGNOSIS &
TESTING.........................8W-97-2
ACCESSORY RELAY - OPERATION.....8W-97-2
ACCUMULATOR - DESCRIPTION........21-188
ACCUMULATOR - OPERATION..........21-189
A/C-HEATER CONTROL - INSTALLATION . . . 24-29
A/C-HEATER CONTROL - REMOVAL......24-29
ACTUATOR - DESCRIPTION, BLEND
DOOR........................24-11,24-30
ACTUATOR - DESCRIPTION, ENGAGE.....8N-10
ACTUATOR - DESCRIPTION, LATCH......8N-14
ACTUATOR - DESCRIPTION, MODE
DOOR.............................24-24
ACTUATOR - DESCRIPTION,
RECIRCULATION DOOR................24-27
ACTUATOR - INSTALLATION, BLEND
DOOR........................24-12,24-31
ACTUATOR - INSTALLATION, ENGAGE....8N-11
ACTUATOR - INSTALLATION, LATCH.....8N-14
ACTUATOR - INSTALLATION, MODE
DOOR........................24-25,24-36
ACTUATOR - INSTALLATION,
RECIRCULATION DOOR................24-28
ACTUATOR - OPERATION, BLEND DOOR . . 24-11,
24-30
ACTUATOR - OPERATION, ENGAGE......8N-11
ACTUATOR - OPERATION, LATCH........8N-14
ACTUATOR - OPERATION, MODE DOOR . . . 24-24
ACTUATOR - OPERATION,
RECIRCULATION DOOR................24-27
ACTUATOR - REMOVAL, BLEND DOOR . . . 24-12,
24-31
ACTUATOR - REMOVAL, ENGAGE........8N-11
ACTUATOR - REMOVAL, LATCH.........8N-14
ACTUATOR - REMOVAL, MODE DOOR....24-25,
24-36
ACTUATOR - REMOVAL, RECIRCULATION
DOOR.............................24-27
ADAPTER - INSTALLATION, FRONT DISC
BRAKE CALIPER......................5-31
ADAPTER - INSTALLATION, OIL FILTER
. . . 9-139
ADAPTER - REMOVAL, FRONT DISC
BRAKE CALIPER
......................5-31
ADAPTER - REMOVAL, OIL FILTER
.......9-139
ADAPTIVE MEMORIES, OPERATION -
FUEL CORRECTION OR
................14-20
ADDING ADDITIONAL COOLANT -
STANDARD PROCEDURE
.................7-5ADDITIONAL COOLANT - STANDARD
PROCEDURE, ADDING...................7-5
ADHESIVE ATTACHED - INSTALLATION,
EXTERIOR NAME PLATES..............23-50
ADHESIVE ATTACHED - REMOVAL,
EXTERIOR NAME PLATES..............23-50
ADHESIVE LOCATIONS -
SPECIFICATIONS, STRUCTURAL........23-153
ADJUSTER-BORC-PILLAR -
INSTALLATION, SEAT BELT HEIGHT......8O-12
ADJUSTER-BORC-PILLAR -
REMOVAL, SEAT BELT HEIGHT..........8O-12
ADJUSTER - DIAGNOSIS AND TESTING,
DRUM BRAKE AUTOMATIC..............5-13
ADJUSTER - INSTALLATION, FRONT
SEAT TRACK MANUAL................23-94
ADJUSTER - INSTALLATION, FRONT
SEAT TRACK POWER.................23-94
ADJUSTER - REMOVAL, FRONT SEAT
TRACK MANUAL.....................23-94
ADJUSTER - REMOVAL, FRONT SEAT
TRACK POWER......................23-94
ADJUSTER KNOB - INSTALLATION, SEAT
BELT HEIGHT.......................8O-13
ADJUSTER KNOB - REMOVAL, SEAT
BELT HEIGHT.......................8O-13
ADJUSTER NOISE DIAGNOSIS -
DIAGNOSIS AND TESTING, HYDRAULIC
LASH...............................9-34
ADJUSTER TENSION RELEASE -
STANDARD PROCEDURE, PARKING
BRAKE AUTOMATIC....................5-58
ADJUSTER TENSION RESET -
STANDARD PROCEDURE, PARKING
BRAKE AUTOMATIC.....................5-59
ADJUSTERS - INSTALLATION,
HYDRAULIC LASH.....................9-34
ADJUSTERS - REMOVAL, HYDRAULIC
LASH...............................9-34
AERATION - DIAGNOSIS AND TESTING,
COOLING SYSTEM.....................7-3
AFTER AN AIRBAG DEPLOYMENT -
STANDARD PROCEDURE, SERVICE.......8O-3
AIR CLEANER ELEMENT - INSTALLATION . . 9-24,
9-98
AIR CLEANER ELEMENT - REMOVAL . . 9-24,9-98
AIR CLEANER HOUSING - INSTALLATION . . 9-24,
9-99
AIR CLEANER HOUSING - REMOVAL . . 9-24,9-99
AIR CONDITIONING LINES -
INSTALLATION, REAR................24-105
AIR CONDITIONING LINES - REMOVAL,
REAR.............................24-104
AIR CONTROL MOTOR - DESCRIPTION,
IDLE...............................14-28
AIR CONTROL MOTOR - INSTALLATION,
IDLE...............................14-29
AIR CONTROL MOTOR - OPERATION,
IDLE...............................14-28
AIR CONTROL MOTOR - REMOVAL, IDLE . . 14-29
AIR EXHAUSTER - DESCRIPTION, REAR
QUARTER PANEL/FENDER..............23-56
AIR EXHAUSTER - INSTALLATION, REAR
QUARTER PANEL/FENDER..............23-57
AIR EXHAUSTER - REMOVAL, REAR
QUARTER PANEL/FENDER..............23-56
AIR FILTER - DESCRIPTION............24-39
AIR FILTER - INSTALLATION............24-40
AIR FILTER - REMOVAL...............24-39
AIR GAP - STANDARD PROCEDURE,
COMPRESSOR CLUTCH...............24-17
AIR GAP, SPECIFICATIONS - WHEEL
SPEED SENSOR.......................5-79
AIR INTAKE PIPE - INSTALLATION......24-113
AIR INTAKE PIPE - REMOVAL..........24-112
AIR OUTLETS - DESCRIPTION.....24-40,24-52
AIR OUTLETS - INSTALLATION..........24-52
AIR OUTLETS - REMOVAL.............24-52
AIR PRESSURE TESTS - DIAGNOSIS
AND TESTING, CLUTCH...............21-122
AIR TEMPERATURE SENSOR -
DESCRIPTION, INLET.................14-29
AIR TEMPERATURE SENSOR -
OPERATION, INLET
...................14-29
AIRBAG - DESCRIPTION, DRIVER
........8O-5
AIRBAG - DESCRIPTION, PASSENGER
.....8O-7
AIRBAG - DESCRIPTION, SEAT
..........8O-10
AIRBAG - INSTALLATION, DRIVER
........8O-6AIRBAG - INSTALLATION, PASSENGER....8O-9
AIRBAG - OPERATION, DRIVER..........8O-5
AIRBAG - OPERATION, PASSENGER.......8O-8
AIRBAG - OPERATION, SEAT...........8O-11
AIRBAG - REMOVAL, DRIVER............8O-5
AIRBAG - REMOVAL, PASSENGER........8O-8
AIRBAG CONTROL MODULE -
DESCRIPTION, SIDE IMPACT...........8O-17
AIRBAG CONTROL MODULE -
INSTALLATION, SIDE IMPACT...........8O-17
AIRBAG CONTROL MODULE -
OPERATION, SIDE IMPACT.............8O-17
AIRBAG CONTROL MODULE - REMOVAL,
SIDE IMPACT.......................8O-17
AIRBAG DEPLOYMENT - STANDARD
PROCEDURE, SERVICE AFTER AN........8O-3
AIRBAG SYSTEM - DIAGNOSIS AND
TESTING............................8O-2
AIRBAG TRIM COVER - INSTALLATION,
DRIVER.............................8O-7
AIRBAG TRIM COVER - REMOVAL,
DRIVER.............................8O-6
AIRBAGS - STANDARD PROCEDURE,
HANDLING..........................8O-3
AJAR SWITCH - EXPORT -
INSTALLATION, HOOD.................8Q-3
AJAR SWITCH - EXPORT - REMOVAL,
HOOD..............................8Q-3
ALIGNMENT - DESCRIPTION, WHEEL......2-46
ALIGNMENT - EXPORT - STANDARD
PROCEDURE, FRONT FOG LAMP UNIT.....8L-9
ALIGNMENT - EXPORT - STANDARD
PROCEDURE, HEADLAMP UNIT.........8L-17
ALIGNMENT - STANDARD PROCEDURE,
FRONT FOG LAMP UNIT................8L-9
ALIGNMENT - STANDARD PROCEDURE,
FRONT WIPER ARM...................8R-8
ALIGNMENT - STANDARD PROCEDURE,
HEADLAMP UNIT.....................8L-17
ALIGNMENT - STANDARD PROCEDURE,
WHEEL.............................2-51
ALIGNMENT, SPECIFICATIONS - WHEEL....2-55
ALUMINUM WHEEL CARE - CLEANING . . . 22-18
AMBIENT TEMP SENSOR - DESCRIPTION . 8M-11
AMBIENT TEMP SENSOR - OPERATION . . 8M-11
AMBIENT TEMPERATURE SENSOR -
DIAGNOSIS AND TESTING.............8M-12
AMBIENT TEMPERATURE SENSOR
CIRCUIT - DIAGNOSIS AND TESTING....8M-12
AN AIRBAG DEPLOYMENT - STANDARD
PROCEDURE, SERVICE AFTER...........8O-3
ANTENNA - EXPORT - DESCRIPTION,
QUARTER GLASS INTEGRAL............8A-9
ANTENNA - EXPORT - DIAGNOSIS AND
TESTING, QUARTER GLASS INTEGRAL....8A-9
ANTENNA - EXPORT - OPERATION,
QUARTER GLASS INTEGRAL............8A-9
ANTENNA BODY AND CABLE -
DESCRIPTION........................8A-4
ANTENNA BODY AND CABLE -
DIAGNOSIS AND TESTING..............8A-4
ANTENNA BODY AND CABLE -
INSTALLATION.......................8A-6
ANTENNA BODY AND CABLE -
OPERATION..........................8A-4
ANTENNA BODY AND CABLE - REMOVAL . . 8A-5
ANTENNA CABLE - INSTALLATION,
INSTRUMENT PANEL..................8A-9
ANTENNA CABLE - REMOVAL,
INSTRUMENT PANEL..................8A-8
ANTENNA MODULE - EXPORT -
DESCRIPTION........................8A-6
ANTENNA MODULE - EXPORT -
DIAGNOSIS AND TESTING..............8A-7
ANTENNA MODULE - EXPORT -
INSTALLATION.......................8A-7
ANTENNA MODULE - EXPORT -
OPERATION..........................8A-6
ANTENNA MODULE - EXPORT -
REMOVAL
...........................8A-7
ANTILOCK BRAKE - DESCRIPTION,
CONTROLLER
........................8E-5
ANTILOCK BRAKE - INSTALLATION,
CONTROLLER
........................8E-6
ANTILOCK BRAKE - OPERATION,
CONTROLLER
........................8E-5
ANTILOCK BRAKE - REMOVAL,
CONTROLLER
........................8E-6
RSINDEX1
Description Group-Page Description Group-Page Description Group-Page
ProCarManuals.com
ANTILOCK BRAKE SYSTEM -
DESCRIPTION........................5-75
ANTILOCK BRAKE SYSTEM - OPERATION . . 5-76
ANTILOCK BRAKE SYSTEM BLEEDING -
STANDARD PROCEDURE................5-78
ANTILOCK BRAKE SYSTEM (EXPORT) -
DESCRIPTION........................5-75
A-PILLAR LOWER EXTENSION TRIM -
INSTALLATION.......................23-73
A-PILLAR LOWER EXTENSION TRIM -
REMOVAL..........................23-73
A-PILLAR TRIM - INSTALLATION........23-73
A-PILLAR TRIM - REMOVAL............23-73
A-PILLAR-HEADER, OR B-PILLAR -
INSTALLATION.......................23-17
A-PILLAR-HEADER, OR B-PILLAR -
REMOVAL..........................23-17
APPLIQUE - INSTALLATION.............23-14
APPLIQUE - REMOVAL................23-14
ARM - DESCRIPTION, LOWER CONTROL . . . 2-12
ARM - INSPECTION, LOWER CONTROL....2-14
ARM - INSTALLATION, LOWER CONTROL . . 2-15
ARM - INSTALLATION, REAR WIPER.....8R-14
ARM - INSTALLATION, TORQUE..........3-44
ARM - OPERATION, LOWER CONTROL.....2-12
ARM - REMOVAL, LOWER CONTROL......2-12
ARM - REMOVAL, REAR WIPER.........8R-14
ARM - REMOVAL, TORQUE..............3-44
ARM ALIGNMENT - STANDARD
PROCEDURE, FRONT WIPER............8R-8
ARM (REAR BUSHING - HYDRO) -
ASSEMBLY, LOWER CONTROL...........2-14
ARM (REAR BUSHING - HYDRO) -
DISASSEMBLY, LOWER CONTROL........2-14
ARM (REAR BUSHING - STANDARD) -
ASSEMBLY, LOWER CONTROL...........2-14
ARM (REAR BUSHING - STANDARD) -
DISASSEMBLY, LOWER CONTROL........2-13
ARMREST - INSTALLATION.............23-90
ARMREST - REMOVAL................23-90
ARMS - DESCRIPTION, ROCKER........9-109
ARMS - INSPECTION, ROCKER...........9-35
ARMS - INSTALLATION, FRONT WIPER....8R-9
ARMS - INSTALLATION, ROCKER.........9-35
ARMS - OPERATION, ROCKER..........9-109
ARMS - REMOVAL, FRONT WIPER........8R-9
ARMS - REMOVAL, ROCKER.............9-34
ARMS AND SHAFT - ASSEMBLY,
ROCKER............................9-109
ARMS AND SHAFT - DISASSEMBLY,
ROCKER............................9-109
ARMS AND SHAFT - INSTALLATION,
ROCKER............................9-110
ARMS AND SHAFT - REMOVAL, ROCKER . . 9-109
ASSIST HANDLE - INSTALLATION........23-73
ASSIST HANDLE - REMOVAL...........23-73
ASSIST STRAP - INSTALLATION, FRONT
SEATBACK..........................23-91
ASSIST STRAP - REMOVAL, FRONT
SEATBACK..........................23-91
ATC - OPERATION, THREE ZONE.........24-3
ATC - OPERATION, TWO ZONE.........24-106
ATTACHED - INSTALLATION, EXTERIOR
NAME PLATES - ADHESIVE.............23-50
ATTACHED - INSTALLATION, EXTERIOR
NAME PLATES - TAPE.................23-50
ATTACHED - REMOVAL, EXTERIOR NAME
PLATES - ADHESIVE..................23-50
ATTACHED - REMOVAL, EXTERIOR NAME
PLATES - TAPE ......................23-50
AUDIO - DIAGNOSIS AND TESTING.......8A-2
AUDIO/VIDEO - DESCRIPTION...........8A-1
AUDIO/VIDEO - OPERATION.............8A-2
AUTO SHUT DOWN RELAY -
DESCRIPTION.........................8I-3
AUTO SHUT DOWN RELAY - OPERATION . . . 8I-3
AUTOMATIC ADJUSTER - DIAGNOSIS
AND TESTING, DRUM BRAKE
............5-13
AUTOMATIC ADJUSTER TENSION
RELEASE - STANDARD PROCEDURE,
PARKING BRAKE
......................5-58
AUTOMATIC ADJUSTER TENSION RESET
- STANDARD PROCEDURE, PARKING
BRAKE
..............................5-59
AUTOMATIC DAY / NIGHT MIRROR -
DESCRIPTION
.......................8N-47
AUTOMATIC DAY / NIGHT MIRROR -
DIAGNOSIS AND TESTING
.............8N-47AUTOMATIC DAY / NIGHT MIRROR -
OPERATION.........................8N-47
AUTOMATIC TEMPERATURE CONTROL -
DESCRIPTION........................24-2
AUTOMATIC TRANSAXLE -
DESCRIPTION, 41TE.................21-117
AUTOMATIC TRANSAXLE - OPERATION,
41TE.............................21-119
AUTOMATIC TRANSAXLE, SPECIAL
TOOLS - 41TE......................21-183
AUTOSTICK SWITCH - DESCRIPTION....21-189
AUTOSTICK SWITCH - OPERATION......21-189
AWD - INSTALLATION..............2-39,2-44
AWD - INSTALLATION, REAR WHEEL
SPEED SENSOR.......................5-80
AWD - REMOVAL.................2-38,2-44
AWD - REMOVAL, REAR WHEEL SPEED
SENSOR............................5-80
AWD AND HEAVY DUTY - INSTALLATION . . . 2-35
AWD AND HEAVY DUTY - REMOVAL......2-35
AXLE SEALS - INSTALLATION...........21-61
AXLE SEALS - REMOVAL..............21-61
B OR C-PILLAR - INSTALLATION, SEAT
BELT HEIGHT ADJUSTER..............8O-12
B OR C-PILLAR - REMOVAL, SEAT BELT
HEIGHT ADJUSTER...................8O-12
BACK - INSTALLATION, BENCH SEAT....23-101
BACK - QUAD BUCKET - INSTALLATION,
BUCKET SEAT.......................23-97
BACK - QUAD BUCKET - REMOVAL,
BUCKET SEAT.........................23-97
BACK - REMOVAL, BENCH SEAT........23-101
BACK COVER - INSTALLATION, BENCH
SEAT .............................23-102
BACK COVER - REMOVAL, BENCH SEAT . . 23-102
BACK HINGE - REMOVAL, BENCH SEAT . . 23-100
BACK HINGE COVERS - QUAD BUCKET,
50/50 SPLIT, BENCH - INSTALLATION,
SEAT .............................23-100
BACK HINGE COVERS - QUAD BUCKET,
50/50 SPLIT, BENCH - REMOVAL, SEAT . . 23-100
BACKING PLATE - INSTALLATION,
STEERING COLUMN COVER............23-69
BACKING PLATE - REMOVAL, STEERING
COLUMN COVER.....................23-69
BACK-UP LAMP SWITCH -
INSTALLATION.......................21-62
BACK-UP LAMP SWITCH - REMOVAL.....21-62
BAG RETAINER - INSTALLATION,
PLASTIC GROCERY..................23-103
BAG RETAINER - REMOVAL, PLASTIC
GROCERY.........................23-103
BALANCE - STANDARD PROCEDURE,
TIRE AND WHEEL.....................22-5
BALANCE SHAFTS AND CARRIER
ASSEMBLY - DESCRIPTION.............9-69
BALANCE SHAFTS AND CARRIER
ASSEMBLY - INSTALLATION.............9-72
BALANCE SHAFTS AND CARRIER
ASSEMBLY - OPERATION...............9-69
BALANCE SHAFTS AND CARRIER
ASSEMBLY - REMOVAL.................9-69
BALL BEARING - INSTALLATION, END
COVER.............................21-10
BALL BEARING - REMOVAL, END COVER . . . 21-9
BALL JOINT - DESCRIPTION, LOWER......2-10
BALL JOINT - DIAGNOSIS AND TESTING,
LOWER.............................2-10
BALL JOINT - OPERATION, LOWER.......2-10
BALL JOINT SEAL BOOT - INSTALLATION . . 2-11
BALL JOINT SEAL BOOT - REMOVAL......2-11
BAR - DESCRIPTION, STABILIZER....2-16,2-43
BAR - DESCRIPTION, TRACK............2-44
BAR - INSPECTION, STABILIZER..........2-17
BAR - INSTALLATION, STABILIZER........2-17
BAR - INSTALLATION, TRACK............2-45
BAR - OPERATION, STABILIZER......2-16,2-44
BAR - OPERATION, TRACK..............2-44
BAR - REMOVAL, STABILIZER...........2-17
BAR - REMOVAL, TRACK...............2-44
BAR CUSHION - INSTALLATION,
STABILIZER
...........................2-4
BAR CUSHION - REMOVAL, STABILIZER
....2-4
BASE BRAKE BLEEDING - STANDARD
PROCEDURE
..........................5-7
BASE BRAKE SYSTEM - DIAGNOSIS AND
TESTING
.............................5-4
BASE BRAKE SYSTEM, SPECIAL TOOLS
....5-10BASE BRAKES - DESCRIPTION............5-3
BASE BRAKES - OPERATION..............5-3
BASE BRAKES (EXPORT) - DESCRIPTION . . . 5-3
BASE COAT/CLEARCOAT FINISH -
DESCRIPTION.......................23-84
BATTERY - DESCRIPTION...............8F-7
BATTERY - DIAGNOSIS AND TESTING.....8F-9
BATTERY - OPERATION.................8F-9
BATTERY - REMOVAL.................8F-15
BATTERY CABLE - DIAGNOSIS AND
TESTING...........................8F-16
BATTERY CABLES - DESCRIPTION.......8F-16
BATTERY CABLES - INSTALLATION.......8F-18
BATTERY CABLES - OPERATION.........8F-16
BATTERY CABLES - REMOVAL..........8F-18
BATTERY CHARGING - STANDARD
PROCEDURE, CONVENTIONAL..........8F-11
BATTERY CHARGING - STANDARD
PROCEDURE, SPIRAL PLATE............8F-10
BATTERY ELECTROLYTE LEVEL -
STANDARD PROCEDURE, CHECKING.....8F-14
BATTERY HOLDDOWN - DESCRIPTION....8F-15
BATTERY HOLDDOWN - INSTALLATION . . . 8F-16
BATTERY HOLDDOWN - OPERATION.....8F-15
BATTERY HOLDDOWN - REMOVAL.......8F-16
BATTERY REPLACEMENT - STANDARD
PROCEDURE........................8N-42
BATTERY, SPECIFICATIONS.............8N-43
BATTERY SYSTEM - CLEANING...........8F-5
BATTERY SYSTEM - DESCRIPTION........8F-1
BATTERY SYSTEM - DIAGNOSIS AND
TESTING............................8F-2
BATTERY SYSTEM - INSPECTION.........8F-5
BATTERY SYSTEM - OPERATION.........8F-2
BATTERY SYSTEM - SPECIFICATIONS......8F-6
BATTERY SYSTEM SPECIAL TOOLS,
SPECIAL TOOLS......................8F-7
BATTERY TEMPERATURE SENSOR -
DESCRIPTION.......................8F-23
BATTERY TEMPERATURE SENSOR -
OPERATION.........................8F-23
BATTERY TEMPERATURE SENSOR -
REMOVAL..........................8F-23
BATTERY TEMPERATURE SENSOR -
SPECIFICATIONS.....................8F-22
BATTERY TRAY - DESCRIPTION.........8F-18
BATTERY TRAY - INSTALLATION.........8F-19
BATTERY TRAY - OPERATION...........8F-19
BATTERY TRAY - REMOVAL............8F-19
BEARING - DESCRIPTION, HUB.......2-30,2-5
BEARING - DIAGNOSIS AND TESTING,
HUB.............................2-30,2-5
BEARING - INSTALLATION, CLUTCH
RELEASE LEVER.......................6-7
BEARING - INSTALLATION, END COVER
BALL..............................21-10
BEARING - INSTALLATION, HUB.......2-32,2-5
BEARING - OPERATION, HUB.........2-30,2-5
BEARING - REMOVAL, CLUTCH RELEASE
LEVER...............................6-6
BEARING - REMOVAL, END COVER BALL . . . 21-9
BEARING - REMOVAL, HUB..........2-31,2-5
BEARING CLEARANCE - STANDARD
PROCEDURE, MEASURING
CONNECTING ROD...................9-120
BEARING CLEARANCE USING
PLASTIGAGE - STANDARD
PROCEDURE, MEASURING..........9-12,9-84
BEARING FITTING - STANDARD
PROCEDURE, MAIN...................9-123
BEARING PRELOAD - ADJUSTMENT,
DIFFERENTIAL......................21-199
BEARINGS - INSTALLATION,
CRANKSHAFT MAIN..................9-124
BEARINGS - REMOVAL, CRANKSHAFT
MAIN..............................9-124
BEARINGS (IN BLOCK) - DESCRIPTION,
CAMSHAFT.........................9-115
BEARINGS (IN BLOCK) - INSPECTION,
CAMSHAFT.........................9-115
BEARINGS (IN BLOCK) - INSTALLATION,
CAMSHAFT
.........................9-115
BEARINGS (IN BLOCK) - OPERATION,
CAMSHAFT
.........................9-115
BEARINGS (IN BLOCK) - REMOVAL,
CAMSHAFT
.........................9-115
BELLCRANK - INSTALLATION
...........23-34
BELLCRANK - REMOVAL
...............23-34
2 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
ProCarManuals.com
BODY CONTROL MODULE -
INSTALLATION........................8E-5
BODY CONTROL MODULE - OPERATION . . . 8E-3
BODY CONTROL MODULE - REMOVAL.....8E-4
BODY LUBRICATION, SPECIFICATIONS....23-12
BODY OPENING DIMENSIONS -
SPECIFICATIONS....................23-124
BODY PANEL REPAIR - STANDARD
PROCEDURE, PLASTIC.................23-3
BODY SEALING LOCATIONS -
SPECIFICATIONS....................23-127
BODY SIDE MOLDINGS - INSTALLATION . . 23-45
BODY SIDE MOLDINGS - REMOVAL......23-44
BODY, SPECIAL TOOLS................23-13
BOLSTER - INSTALLATION, QUARTER
TRIM..............................23-77
BOLSTER - REMOVAL, QUARTER TRIM . . . 23-77
BOOSTER - DESCRIPTION, POWER
BRAKE..............................5-40
BOOSTER - DIAGNOSIS AND TESTING,
POWER BRAKE.......................5-41
BOOSTER - OPERATION, POWER BRAKE . . . 5-41
BOOT - INNER - INSTALLATION, CV........3-6
BOOT - INNER - REMOVAL, CV...........3-6
BOOT - INNER/OUTER - INSTALLATION,
CV .................................3-17
BOOT - INNER/OUTER - REMOVAL, CV....3-15
BOOT - INSTALLATION, BALL JOINT
SEAL...............................2-11
BOOT - INSTALLATION, GEARSHIFT........21-73
BOOT - OUTER - INSTALLATION, CV......3-10
BOOT - OUTER - REMOVAL, CV..........3-10
BOOT - REMOVAL, BALL JOINT SEAL.....2-11
BOOT - REMOVAL, GEARSHIFT..........21-72
BORE FITTING - STANDARD
PROCEDURE, PISTON TO CYLINDER......9-42
BORE HONING - STANDARD
PROCEDURE, CYLINDER...........9-112,9-35
BOX - INSTALLATION, GLOVE...........23-63
BOX - REMOVAL, GLOVE..............23-63
BOX LAMP SWITCH - INSTALLATION,
GLOVE.............................8L-26
BOX LAMP SWITCH - REMOVAL, GLOVE . . 8L-26
BOX LATCH - INSTALLATION, GLOVE.....23-63
BOX LATCH - REMOVAL, GLOVE.........23-63
BOX LATCH STRIKER - INSTALLATION,
GLOVE.............................23-64
BOX LATCH STRIKER - REMOVAL,
GLOVE.............................23-64
B-PILLAR - INSTALLATION, A-PILLAR-
HEADER, OR........................23-17
B-PILLAR - REMOVAL, A-PILLAR-
HEADER, OR........................23-17
B-PILLAR LOWER TRIM - INSTALLATION . . 23-74
B-PILLAR LOWER TRIM - REMOVAL.....23-73
B-PILLAR SWITCH - DESCRIPTION, LEFT . 8N-32
B-PILLAR SWITCH - DESCRIPTION,
RIGHT.............................8N-32
B-PILLAR SWITCH - INSTALLATION,
LEFT..............................8N-32
B-PILLAR SWITCH - INSTALLATION,
RIGHT.............................8N-32
B-PILLAR SWITCH - OPERATION, LEFT . . . 8N-32
B-PILLAR SWITCH - OPERATION, RIGHT . . 8N-32
B-PILLAR SWITCH - REMOVAL, LEFT....8N-32
B-PILLAR SWITCH - REMOVAL, RIGHT . . . 8N-32
B-PILLAR UPPER TRIM - INSTALLATION
. . 23-74
B-PILLAR UPPER TRIM - REMOVAL
......23-74
BRACKET - 2.4L ENGINE -
INSTALLATION, COMPRESSOR
MOUNTING
.........................24-66
BRACKET - 2.4L ENGINE - REMOVAL,
COMPRESSOR MOUNTING
.............24-65
BRACKET - DESCRIPTION, TRANSVERSE
. . 8N-18
BRACKET - INSTALLATION, TRANSVERSE
. 8N-18
BRACKET - OPERATION, TRANSVERSE
. . . 8N-18
BRACKET - REMOVAL, TRANSVERSE
.....8N-18
BRACKET ASSEMBLY - INSTALLATION,
FLOOR CONSOLE TRAY
................23-82
BRACKET ASSEMBLY - REMOVAL,
FLOOR CONSOLE TRAY
................23-82
BRAKE - DESCRIPTION, CONTROLLER
ANTILOCK
...........................8E-5
BRAKE - INSTALLATION, CONTROLLER
ANTILOCK
...........................8E-6
BRAKE - INSTALLATION, LEVER -
PARKING
............................5-65BRAKE - INSTALLATION, SHOES -
PARKING............................5-72
BRAKE - INSTALLATION, SUPPORT
PLATE - DRUM.......................5-56
BRAKE - OPERATION, CONTROLLER
ANTILOCK...........................8E-5
BRAKE - REMOVAL, CONTROLLER
ANTILOCK...........................8E-6
BRAKE - REMOVAL, LEVER - PARKING....5-64
BRAKE - REMOVAL, SHOES - PARKING....5-67
BRAKE - REMOVAL, SUPPORT PLATE -
DRUM..............................5-56
BRAKE AUTOMATIC ADJUSTER -
DIAGNOSIS AND TESTING, DRUM........5-13
BRAKE AUTOMATIC ADJUSTER TENSION
RELEASE - STANDARD PROCEDURE,
PARKING............................5-58
BRAKE AUTOMATIC ADJUSTER TENSION
RESET - STANDARD PROCEDURE,
PARKING............................5-59
BRAKE BLEEDING - STANDARD
PROCEDURE, BASE.....................5-7
BRAKE BOOSTER - DESCRIPTION,
POWER.............................5-40
BRAKE BOOSTER - DIAGNOSIS AND
TESTING, POWER.....................5-41
BRAKE BOOSTER - OPERATION, POWER . . . 5-41
BRAKE CABLE (FRONT) - INSTALLATION,
PARKING............................5-63
BRAKE CABLE (FRONT) - REMOVAL,
PARKING............................5-59
BRAKE CABLE (INTERMEDIATE) -
INSTALLATION, PARKING...............5-63
BRAKE CABLE (INTERMEDIATE) -
REMOVAL, PARKING...................5-60
BRAKE CABLE (LEFT REAR) -
INSTALLATION, PARKING...............5-64
BRAKE CABLE (LEFT REAR) - REMOVAL,
PARKING............................5-62
BRAKE CABLE (RIGHT REAR) -
INSTALLATION, PARKING...............5-63
BRAKE CABLE (RIGHT REAR) -
REMOVAL, PARKING...................5-60
BRAKE CABLES - ADJUSTMENT,
PARKING............................5-64
BRAKE CALIPER - INSTALLATION, REAR
DISC...............................5-30
BRAKE CALIPER - REMOVAL, REAR
DISC...............................5-27
BRAKE CALIPER ADAPTER -
INSTALLATION, FRONT DISC.............5-31
BRAKE CALIPER ADAPTER - REMOVAL,
FRONT DISC.........................5-31
BRAKE CALIPER (DISC/DISC BRAKES) -
INSTALLATION, FRONT DISC.............5-27
BRAKE CALIPER (DISC/DISC BRAKES) -
REMOVAL, FRONT DISC................5-24
BRAKE CALIPER (DISC/DRUM BRAKES) -
INSTALLATION, FRONT DISC.............5-27
BRAKE CALIPER (DISC/DRUM BRAKES) -
REMOVAL, FRONT DISC................5-24
BRAKE CALIPER GUIDE PINS (DISC/
DRUM BRAKES) - INSTALLATION, DISC....5-31
BRAKE CALIPER GUIDE PINS (DISC/
DRUM BRAKES) - REMOVAL, DISC.......5-31
BRAKE FASTENER TORQUE,
SPECIFICATIONS.......................5-9
BRAKE FLUID CONTAMINATION -
DIAGNOSIS AND TESTING..............5-32
BRAKE FLUID LEVEL CHECKING -
STANDARD PROCEDURE................5-32
BRAKE FLUID LEVEL SWITCH -
DESCRIPTION........................5-10
BRAKE FLUID LEVEL SWITCH -
INSTALLATION........................5-11
BRAKE FLUID LEVEL SWITCH -
OPERATION..........................5-10
BRAKE FLUID LEVEL SWITCH -
REMOVAL...........................5-11
BRAKE FLUID, SPECIFICATIONS..........5-33
BRAKE LAMP SWITCH - DESCRIPTION....8L-4
BRAKE LAMP SWITCH - DIAGNOSIS
AND TESTING
........................8L-5
BRAKE LAMP SWITCH - INSTALLATION
....8L-5
BRAKE LAMP SWITCH - OPERATION
......8L-4
BRAKE LAMP SWITCH - REMOVAL
.......8L-5
BRAKE LEVER AND FRONT CABLE -
INSTALLATION, PARKING
...............5-66BRAKE LEVER AND FRONT CABLE -
REMOVAL, PARKING...................5-65
BRAKE PROPORTIONING -
DESCRIPTION, ELECTRONIC VARIABLE....5-75
BRAKE PROPORTIONING - OPERATION,
ELECTRONIC VARIABLE................5-77
BRAKE ROTOR - DIAGNOSIS AND
TESTING............................5-51
BRAKE ROTOR - INSTALLATION, FRONT . . . 5-54
BRAKE ROTOR - REMOVAL, FRONT.......5-54
BRAKE ROTOR, EXPORT................5-55
BRAKE ROTOR MACHINING - STANDARD
PROCEDURE.........................5-53
BRAKE ROTOR, SPECIFICATIONS.........5-55
BRAKE SHOE LINING - INSPECTION,
REAR DRUM.........................5-22
BRAKE SHOES - ADJUSTMENT, PARKING . . 5-73
BRAKE SHOES - ADJUSTMENT, REAR
DRUM..............................5-23
BRAKE SHOES - CLEANING, DISC....5-16,5-18
BRAKE SHOES - INSPECTION, DISC . . . 5-16,5-18
BRAKE SHOES - INSTALLATION, REAR
DISC...............................5-19
BRAKE SHOES - INSTALLATION, REAR
DRUM..............................5-22
BRAKE SHOES - REMOVAL, REAR DISC....5-17
BRAKE SHOES - REMOVAL, REAR DRUM . . 5-19
BRAKE SHOES (DISC/DISC BRAKES) -
INSTALLATION, FRONT DISC.............5-16
BRAKE SHOES (DISC/DISC BRAKES) -
REMOVAL, FRONT DISC..................5-14
BRAKE SHOES (DISC/DRUM BRAKES) -
INSTALLATION, FRONT DISC.............5-17
BRAKE SHOES (DISC/DRUM BRAKES) -
REMOVAL, FRONT DISC................5-15
BRAKE SYSTEM - DESCRIPTION,
ANTILOCK...........................5-75
BRAKE SYSTEM - DIAGNOSIS AND
TESTING, BASE........................5-4
BRAKE SYSTEM - OPERATION,
ANTILOCK...........................5-76
BRAKE SYSTEM BLEEDING - STANDARD
PROCEDURE, ANTILOCK................5-78
BRAKE SYSTEM (EXPORT) -
DESCRIPTION, ANTILOCK...............5-75
BRAKE SYSTEM, SPECIAL TOOLS - BASE . . 5-10
BRAKE TUBES AND HOSES -
DESCRIPTION........................5-14
BRAKE TUBES AND HOSES -
INSPECTION.........................5-14
BRAKE TUBES AND HOSES - OPERATION . . 5-14
BRAKES - DESCRIPTION, BASE...........5-3
BRAKES - OPERATION, BASE.............5-3
BRAKES (EXPORT) - DESCRIPTION,
BASE................................5-3
BRAKES (EXPORT) - DESCRIPTION, DISC . . 5-13
BRAKES (FRONT) - DESCRIPTION, DISC . . . 5-11
BRAKES (FRONT) - OPERATION, DISC.....5-13
BRAKES (REAR) - DESCRIPTION, DISC
....5-12
BRAKES (REAR) - DESCRIPTION, DRUM
. . . 5-13
BRAKES (REAR) - OPERATION, DISC
......5-13
BRAKE/TRANSMISSION SHIFT
INTERLOCK SOLENOID - DIAGNOSIS
AND TESTING
......................21-235
BREAK-IN - STANDARD PROCEDURE,
COMPRESSOR CLUTCH
...............24-17
BUCKET - INSTALLATION, BUCKET SEAT
BACK - QUAD
.......................23-97
BUCKET - INSTALLATION, SEAT BELT
BUCKLE - FIRST ROW INBOARD -
QUAD
.............................8O-11
BUCKET - REMOVAL, BUCKET SEAT
BACK - QUAD
.......................23-97
BUCKET - REMOVAL, SEAT BELT BUCKLE
- FIRST ROW INBOARD - QUAD
.........8O-11
BUCKET, 50/50 SPLIT, BENCH -
INSTALLATION, SEAT BACK HINGE
COVERS - QUAD
....................23-100
BUCKET, 50/50 SPLIT, BENCH -
INSTALLATION, SEAT CUSHION COVER
- QUAD
............................23-99
BUCKET, 50/50 SPLIT, BENCH -
REMOVAL, SEAT BACK HINGE COVERS
- QUAD
...........................23-100
BUCKET, 50/50 SPLIT, BENCH -
REMOVAL, SEAT CUSHION COVER -
QUAD
..............................23-98
4 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
ProCarManuals.com
BUCKET SEAT BACK - QUAD BUCKET -
INSTALLATION.......................23-97
BUCKET SEAT BACK - QUAD BUCKET -
REMOVAL..........................23-97
BUCKET SEAT RISER - INSTALLATION,
QUAD..............................23-96
BUCKET SEAT RISER - REMOVAL, QUAD . . 23-96
BUCKET SEAT SIDE SHIELD - NO CUP
HOLDER - INSTALLATION, QUAD........23-96
BUCKET SEAT SIDE SHIELD - NO CUP
HOLDER - REMOVAL, QUAD............23-96
BUCKET SEAT SIDE SHIELD/CUP
HOLDER - INSTALLATION, QUAD........23-95
BUCKET SEAT SIDE SHIELD/CUP
HOLDER - REMOVAL, QUAD............23-95
BUCKLE - FIRST ROW - BENCH -
INSTALLATION, SEAT BELT.............8O-12
BUCKLE - FIRST ROW - BENCH -
REMOVAL, SEAT BELT................8O-12
BUCKLE - FIRST ROW INBOARD - QUAD
BUCKET - INSTALLATION, SEAT BELT....8O-11
BUCKLE - FIRST ROW INBOARD - QUAD
BUCKET - REMOVAL, SEAT BELT........8O-11
BUCKLE - FRONT INBOARD -
INSTALLATION, SEAT BELT.............8O-11
BUCKLE - FRONT INBOARD - REMOVAL,
SEAT BELT .........................8O-11
BUCKLE - SECOND ROW - THREE
PASSENGER BENCH - INSTALLATION,
SEAT BELT .........................8O-14
BUCKLE - SECOND ROW - THREE
PASSENGER BENCH - REMOVAL, SEAT
BELT ..............................8O-14
BUCKLE - SECOND ROW INBOARD -
50/50 BENCH - INSTALLATION, SEAT
BELT ..............................8O-12
BUCKLE - SECOND ROW INBOARD -
50/50 BENCH - REMOVAL, SEAT BELT....8O-12
BUMPER - DESCRIPTION, JOUNCE........2-35
BUMPER - INSTALLATION, STOP........23-25
BUMPER - OPERATION, JOUNCE.........2-35
BUMPER - REMOVAL, STOP............23-25
BUMPER BEZEL - INSTALLATION,
SLIDING DOOR STOP.................23-25
BUMPER BEZEL - REMOVAL, SLIDING
DOOR STOP........................23-25
BUMPER REINFORCEMENT -
INSTALLATION, FRONT.................13-2
BUMPER REINFORCEMENT -
INSTALLATION, REAR..................13-3
BUMPER REINFORCEMENT - REMOVAL,
FRONT..............................13-2
BUMPER REINFORCEMENT - REMOVAL,
REAR...............................13-3
BUS COMMUNICATION RECEIVE - PCM
INPUT - OPERATION, DATA.............8E-15
BUS, OPERATION - PROGRAMMABLE
COMMUNICATIONS INTERFACE (PCI).....14-21
BUSHING - INSTALLATION, LEAF SPRING
FRONT..............................2-29
BUSHING - REMOVAL, LEAF SPRING
FRONT..............................2-28
BUSHINGS - INSTALLATION, FRONT
CROSSMEMBER MOUNT...............13-12
BUSHINGS - REMOVAL, FRONT
CROSSMEMBER MOUNT...............13-12
BUSHINGS (DISC/DISC BRAKES) -
ASSEMBLY, CALIPER GUIDE PIN.........5-25
BUSHINGS (DISC/DISC BRAKES) -
DISASSEMBLY, CALIPER GUIDE PIN.......5-24
CABLE - CROSSOVER - INSTALLATION,
GEARSHIFT.........................21-76
CABLE - CROSSOVER - REMOVAL,
GEARSHIFT.........................21-73
CABLE - DESCRIPTION.................8P-4
CABLE - DESCRIPTION, ANTENNA BODY . . . 8A-4
CABLE - DESCRIPTION, SPARK PLUG.....8I-10
CABLE - DIAGNOSIS AND TESTING,
ANTENNA BODY......................8A-4
CABLE - DIAGNOSIS AND TESTING,
BATTERY...........................8F-16
CABLE - INSTALLATION................8P-4
CABLE - INSTALLATION, ANTENNA BODY
. . 8A-6
CABLE - INSTALLATION, FRONT
..........5-64
CABLE - INSTALLATION, GEAR SHIFT
....21-205
CABLE - INSTALLATION, HOLD OPEN
LATCH
.............................23-38
CABLE - INSTALLATION, INSIDE HANDLE
. . 23-37CABLE - INSTALLATION, INSTRUMENT
PANEL ANTENNA......................8A-9
CABLE - INSTALLATION, LATCH RELEASE . 23-61
CABLE - INSTALLATION, OUTSIDE
HANDLE............................23-36
CABLE - INSTALLATION, PARKING
BRAKE LEVER AND FRONT..............5-66
CABLE - INSTALLATION, THROTTLE
CONTROL..........................14-35
CABLE - OPERATION...................8P-4
CABLE - OPERATION, ANTENNA BODY.....8A-4
CABLE - REMOVAL....................8P-4
CABLE - REMOVAL, ANTENNA BODY......8A-5
CABLE - REMOVAL, FRONT..............5-64
CABLE - REMOVAL, GEAR SHIFT.......21-204
CABLE - REMOVAL, HOLD OPEN LATCH . . . 23-37
CABLE - REMOVAL, INSIDE HANDLE.....23-37
CABLE - REMOVAL, INSTRUMENT PANEL
ANTENNA...........................8A-8
CABLE - REMOVAL, LATCH RELEASE.....23-60
CABLE - REMOVAL, OUTSIDE HANDLE....23-36
CABLE - REMOVAL, PARKING BRAKE
LEVER AND FRONT....................5-65
CABLE - REMOVAL, THROTTLE
CONTROL..........................14-35
CABLE - SELECTOR - INSTALLATION,
GEARSHIFT.........................21-84
CABLE - SELECTOR - REMOVAL,
GEARSHIFT.........................21-81
CABLE ADJUSTMENT, ADJUSTMENTS -
GEARSHIFT........................21-206
CABLE ADJUSTMENT, INSTALLATION -
SYNCHRONIZING...............23-101,23-87
CABLE (FRONT) - INSTALLATION,
PARKING BRAKE......................5-63
CABLE (FRONT) - REMOVAL, PARKING
BRAKE..............................5-59
CABLE (INTERMEDIATE) -
INSTALLATION, PARKING BRAKE.........5-63
CABLE (INTERMEDIATE) - REMOVAL,
PARKING BRAKE......................5-60
CABLE (LEFT REAR) - INSTALLATION,
PARKING BRAKE......................5-64
CABLE (LEFT REAR) - REMOVAL,
PARKING BRAKE......................5-62
CABLE RESISTANCE, SPECIFICATIONS -
SPARK PLUG.........................8I-2
CABLE (RIGHT REAR) - INSTALLATION,
PARKING BRAKE......................5-63
CABLE (RIGHT REAR) - REMOVAL,
PARKING BRAKE......................5-60
CABLES - ADJUSTMENT, PARKING
BRAKE..............................5-64
CABLES - DESCRIPTION, BATTERY.......8F-16
CABLES - INSTALLATION, BATTERY......8F-18
CABLES - OPERATION, BATTERY........8F-16
CABLES - REMOVAL, BATTERY..........8F-18
CALIBRATION - STANDARD PROCEDURE,
COMPASS...........................8M-3
CALIBRATION - STANDARD PROCEDURE,
HEATER-A/C CONTROL.................24-8
CALIPER - CLEANING..............5-25,5-29
CALIPER - INSPECTION............5-25,5-29
CALIPER - INSTALLATION, REAR DISC
BRAKE..............................5-30
CALIPER - REMOVAL, REAR DISC
BRAKE..............................5-27
CALIPER ADAPTER - INSTALLATION,
FRONT DISC BRAKE...................5-31
CALIPER ADAPTER - REMOVAL, FRONT
DISC BRAKE.........................5-31
CALIPER (DISC/DISC BRAKES) -
INSTALLATION, FRONT DISC BRAKE......5-27
CALIPER (DISC/DISC BRAKES) -
REMOVAL, FRONT DISC BRAKE..........5-24
CALIPER (DISC/DRUM BRAKES) -
INSTALLATION, FRONT DISC BRAKE......5-27
CALIPER (DISC/DRUM BRAKES) -
REMOVAL, FRONT DISC BRAKE
..........5-24
CALIPER GUIDE PIN BUSHINGS
(DISC/DISC BRAKES) - ASSEMBLY
........5-25
CALIPER GUIDE PIN BUSHINGS
(DISC/DISC BRAKES) - DISASSEMBLY
.....5-24
CALIPER GUIDE PINS (DISC/DRUM
BRAKES) - INSTALLATION, DISC
BRAKE
..............................5-31
CALIPER GUIDE PINS (DISC/DRUM
BRAKES) - REMOVAL, DISC BRAKE
.......5-31CALIPER PISTON AND SEAL -
ASSEMBLY......................5-26,5-29
CALIPER PISTON AND SEAL -
DISASSEMBLY....................5-24,5-28
CAMSHAFT & BEARINGS (IN BLOCK) -
DESCRIPTION.......................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
INSPECTION........................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
INSTALLATION.......................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
OPERATION.........................9-115
CAMSHAFT & BEARINGS (IN BLOCK) -
REMOVAL..........................9-115
CAMSHAFT END PLAY - STANDARD
PROCEDURE, MEASURING..............9-29
CAMSHAFT OIL SEAL(S) - INSTALLATION . . 9-28
CAMSHAFT OIL SEAL(S) - REMOVAL......9-27
CAMSHAFT POSITION SENSOR -
DESCRIPTION.........................8I-3
CAMSHAFT POSITION SENSOR -
OPERATION..........................8I-3
CAMSHAFT SPROCKET - INSTALLATION,
TIMING CHAIN.......................9-157
CAMSHAFT SPROCKET - REMOVAL,
TIMING CHAIN.......................9-156
CAMSHAFT SPROCKETS - INSTALLATION . . 9-65
CAMSHAFT SPROCKETS - REMOVAL......9-64
CAMSHAFT(S) - CLEANING..............9-29
CAMSHAFT(S) - DESCRIPTION...........9-28
CAMSHAFT(S) - INSPECTION............9-30
CAMSHAFT(S) - INSTALLATION..........9-30
CAMSHAFT(S) - OPERATION.............9-28
CAMSHAFT(S) - REMOVAL..............9-29
CANISTER - DESCRIPTION, VAPOR......25-18
CANISTER - INSTALLATION, REAR EVAP . . 25-20
CANISTER - OPERATION, VAPOR........25-18
CANISTER - REMOVAL, REAR EVAP......25-19
CAP - DESCRIPTION, FUEL FILLER.......25-12
CAP - DESCRIPTION, RADIATOR
PRESSURE..........................7-26
CAP - INSTALLATION, INSTRUMENT
PANEL END.........................23-67
CAP - OPERATION, FUEL FILLER........25-12
CAP - OPERATION, RADIATOR
PRESSURE..........................7-27
CAP - REMOVAL, INSTRUMENT PANEL
END ...............................23-67
CAP TESTING - DIAGNOSIS AND
TESTING, COOLING SYSTEM
PRESSURE..........................7-27
CAP TO FILLER NECK SEAL -
DIAGNOSIS AND TESTING, RADIATOR.....7-27
CAPACITIES - SPECIFICATIONS, FLUID......0-6
CARE - CLEANING, ALUMINUM WHEEL . . . 22-18
CARPETS AND FLOOR MATS -
INSTALLATION.......................23-75
CARPETS AND FLOOR MATS - REMOVAL . 23-74
CARRIER ASSEMBLY - DESCRIPTION,
BALANCE SHAFTS.....................9-69
CARRIER ASSEMBLY - INSTALLATION,
BALANCE SHAFTS.....................9-72
CARRIER ASSEMBLY - OPERATION,
BALANCE SHAFTS.....................9-69
CARRIER ASSEMBLY - REMOVAL,
BALANCE SHAFTS.....................9-69
CARRIER SEAL - INSTALLATION,
DIFFERENTIAL........................21-9
CARRIER SEAL - REMOVAL,
DIFFERENTIAL........................21-9
CATALYTIC CONVERTER - DESCRIPTION . . . 11-4
CATALYTIC CONVERTER - INSPECTION....11-5
CATALYTIC CONVERTER - INSTALLATION . . . 11-6
CATALYTIC CONVERTER - OPERATION.....11-4
CATALYTIC CONVERTER - REMOVAL......11-5
CAUSES - DIAGNOSIS AND TESTING,
COMMON PROBLEM..................21-30
CAUTION - CAUTIONS..................5-78
CAUTION, A/C PLUMBING..............24-61
CAUTION, DESCRIPTION.................5-4
CAUTION, DESCRIPTION...............19-37
CAUTION, SENSOR - TPM..............22-10
CAUTIONS, CAUTION..................5-78
CAUTIONS, WARNING - WARNINGS
. 19-10,19-27
CD CHANGER - DESCRIPTION
...........8A-7
CD CHANGER - INSTALLATION
...........8A-8
CD CHANGER - OPERATION
.............8A-7
CD CHANGER - REMOVAL
..............8A-8
RSINDEX5
Description Group-Page Description Group-Page Description Group-Page
ProCarManuals.com
EXHAUSTER - REMOVAL, REAR
QUARTER PANEL/FENDER AIR..........23-56
EXPANSION VALVE - DESCRIPTION . 24-72,24-96
EXPANSION VALVE - DIAGNOSIS AND
TESTING......................24-72,24-97
EXPANSION VALVE - INSTALLATION . 24-74,24-98
EXPANSION VALVE - OPERATION . . . 24-72,24-97
EXPANSION VALVE - REMOVAL....24-73,24-97
EXPORT - BRAKE ROTOR...............5-55
EXPORT - DESCRIPTION................5-58
EXPORT - DESCRIPTION................2-10
EXPORT - DESCRIPTION, ANTENNA
MODULE............................8A-6
EXPORT - DESCRIPTION, DIESEL
SUPPLEMENTAL HEATER - DCHA.......24-106
EXPORT - DESCRIPTION, HEADLAMP
LEVELING SWITCH...................8L-15
EXPORT - DESCRIPTION, HEADLAMP
WASHERS..........................8R-10
EXPORT - DESCRIPTION, POWER
FOLDAWAY MIRROR SWITCH..........8N-48
EXPORT - DESCRIPTION, QUARTER
GLASS INTEGRAL ANTENNA.............8A-9
EXPORT - DESCRIPTION, REAR FOG
LAMP..............................8L-22
EXPORT - DIAGNOSIS AND TESTING,
ANTENNA MODULE....................8A-7
EXPORT - DIAGNOSIS AND TESTING,
HEADLAMP LEVELING MOTOR..........8L-14
EXPORT - DIAGNOSIS AND TESTING,
HEADLAMP LEVELING SWITCH.........8L-15
EXPORT - DIAGNOSIS AND TESTING,
HEADLAMP SWITCH..................8L-16
EXPORT - DIAGNOSIS AND TESTING,
HEADLAMP WASHERS................8R-10
EXPORT - DIAGNOSIS AND TESTING,
QUARTER GLASS INTEGRAL ANTENNA....8A-9
EXPORT - INSTALLATION...............2-12
EXPORT - INSTALLATION, ANTENNA
MODULE............................8A-7
EXPORT - INSTALLATION, FRONT FOG
LAMP...............................8L-9
EXPORT - INSTALLATION, FRONT
POSITION LAMP.....................8L-10
EXPORT - INSTALLATION, HEADLAMP....8L-13
EXPORT - INSTALLATION, HEADLAMP
LEVELING MOTOR....................8L-15
EXPORT - INSTALLATION, HEADLAMP
UNIT..............................8L-20
EXPORT - INSTALLATION, HEADLAMP
WASHER HOSE......................8R-12
EXPORT - INSTALLATION, HEADLAMP
WASHER PUMP MOTOR...............8R-13
EXPORT - INSTALLATION, HEADLAMP
WASHERS..........................8R-12
EXPORT - INSTALLATION, HOOD AJAR
SWITCH............................8Q-3
EXPORT - INSTALLATION, PARK/TURN
SIGNAL LAMP.......................8L-22
EXPORT - INSTALLATION, POWER
FOLDAWAY MIRROR SWITCH..........8N-49
EXPORT - INSTALLATION, REPEATER
LAMP..............................8L-22
EXPORT - INSTALLATION, TAIL LAMP....8L-23
EXPORT - OPERATION, ANTENNA
MODULE............................8A-6
EXPORT - OPERATION, HEADLAMP
WASHERS
..........................8R-10
EXPORT - OPERATION, POWER
FOLDAWAY MIRROR SWITCH
..........8N-48
EXPORT - OPERATION, QUARTER GLASS
INTEGRAL ANTENNA
...................8A-9
EXPORT - REMOVAL
...................2-11
EXPORT - REMOVAL, ANTENNA MODULE
. . 8A-7
EXPORT - REMOVAL, FRONT FOG LAMP
. . . 8L-9
EXPORT - REMOVAL, FRONT POSITION
LAMP
..............................8L-10
EXPORT - REMOVAL, HEADLAMP
........8L-13
EXPORT - REMOVAL, HEADLAMP
LEVELING MOTOR
....................8L-14
EXPORT - REMOVAL, HEADLAMP UNIT
. . . 8L-20
EXPORT - REMOVAL, HEADLAMP
WASHER HOSE
......................8R-12
EXPORT - REMOVAL, HEADLAMP
WASHER PUMP MOTOR
...............8R-12
EXPORT - REMOVAL, HEADLAMP
WASHERS
..........................8R-12EXPORT - REMOVAL, HOOD AJAR
SWITCH............................8Q-3
EXPORT - REMOVAL, PARK/TURN
SIGNAL LAMP.......................8L-22
EXPORT - REMOVAL, POWER
FOLDAWAY MIRROR SWITCH..........8N-48
EXPORT - REMOVAL, REPEATER LAMP . . . 8L-22
EXPORT - REMOVAL, TAIL LAMP........8L-23
EXPORT - STANDARD PROCEDURE,
FRONT FOG LAMP UNIT ALIGNMENT......8L-9
EXPORT - STANDARD PROCEDURE,
HEADLAMP UNIT ALIGNMENT..........8L-17
EXTENSION - INSTALLATION,
EVAPORATOR LINE...................24-96
EXTENSION - REMOVAL, EVAPORATOR
LINE...............................24-95
EXTENSION TRIM - INSTALLATION,
A-PILLAR LOWER....................23-73
EXTENSION TRIM - REMOVAL, A-PILLAR
LOWER............................23-73
EXTENSION TUBES - INSTALLATION,
HEATER CORE.......................24-77
EXTENSION TUBES - REMOVAL, HEATER
CORE..............................24-75
EXTERIOR - DESCRIPTION, LAMPS/
LIGHTING...........................8L-2
EXTERIOR - OPERATION, LAMPS/
LIGHTING...........................8L-3
EXTERIOR - WARNING, LAMPS/
LIGHTING...........................8L-4
EXTERIOR HANDLE - INSTALLATION.....23-22,
23-39
EXTERIOR HANDLE - REMOVAL.....23-22,23-39
EXTERIOR HANDLE SWITCH -
DESCRIPTION.......................8N-11
EXTERIOR HANDLE SWITCH -
INSTALLATION......................8N-12
EXTERIOR HANDLE SWITCH -
OPERATION.........................8N-11
EXTERIOR HANDLE SWITCH - REMOVAL . . 8N-11
EXTERIOR LAMPS, SPECIFICATIONS......8L-4
EXTERIOR NAME PLATES - ADHESIVE
ATTACHED - INSTALLATION............23-50
EXTERIOR NAME PLATES - ADHESIVE
ATTACHED - REMOVAL................23-50
EXTERIOR NAME PLATES - TAPE
ATTACHED - INSTALLATION............23-50
EXTERIOR NAME PLATES - TAPE
ATTACHED - REMOVAL................23-50
FACTOR SETTING - STANDARD
PROCEDURE, PINION............8E-15,8E-23
FAILED PARK SWITCH - DIAGNOSIS AND
TESTING............................8R-2
FAN - DESCRIPTION, RADIATOR..........7-28
FAN - INSTALLATION, RADIATOR.........7-30
FAN - OPERATION, RADIATOR...........7-29
FAN - REMOVAL, RADIATOR.............7-30
FAN MOTOR - DIAGNOSIS AND
TESTING, RADIATOR...................7-29
FAN RELAY - DESCRIPTION, RADIATOR....7-30
FAN RELAY - INSTALLATION, RADIATOR . . . 7-30
FAN RELAY - OPERATION, RADIATOR......7-30
FAN RELAY - REMOVAL, RADIATOR.......7-30
FASCIA - INSTALLATION, FRONT.........13-1
FASCIA - INSTALLATION, REAR..........13-2
FASCIA - REMOVAL, FRONT.............13-1
FASCIA - REMOVAL, REAR..............13-2
FASCIA - SCUFF PAD - INSTALLATION,
REAR...............................13-4
FASCIA - SCUFF PAD - REMOVAL, REAR . . . 13-3
FASTENER IDENTIFICATION -
DESCRIPTION......................Intro.-2
FASTENER TORQUE, SPECIFICATIONS -
ABS ................................5-79
FASTENER TORQUE, SPECIFICATIONS -
BRAKE...............................5-9
FASTENER TORQUE, SPECIFICATIONS -
FRONT SUSPENSION...................2-3
FASTENER TORQUE, SPECIFICATIONS -
POWER STEERING....................19-9
FASTENER TORQUE, SPECIFICATIONS -
REAR SUSPENSION
...................2-27
FASTENER USAGE - DESCRIPTION
......Intro.-5
FEED CIRCUIT RESISTANCE TEST -
DIAGNOSIS AND TESTING
..............8F-32
FEED CIRCUIT TEST - DIAGNOSIS AND
TESTING
...........................8F-33
FENDER - INSTALLATION, FRONT
........23-51FENDER - REMOVAL, FRONT...........23-51
FFV REPLACEMENT PARTS -
DESCRIPTION........................14-2
FILL - DIAGNOSIS AND TESTING,
VEHICLE DOES NOT..................25-16
FILL - STANDARD PROCEDURE, FLUID
DRAIN.............................21-71
FILL DOOR - INSTALLATION, FUEL.......23-51
FILL DOOR - REMOVAL, FUEL..........23-51
FILL DOOR BLOCKER LATCH -
INSTALLATION, FUEL.................23-52
FILL DOOR BLOCKER LATCH -
REMOVAL, FUEL.....................23-52
FILL DOOR BLOCKER LATCH STRIKER -
INSTALLATION, FUEL.................23-52
FILL DOOR BLOCKER LATCH STRIKER -
REMOVAL, FUEL.....................23-52
FILL DOOR BLOCKER LOCKOUT LINK -
INSTALLATION, FUEL.................23-53
FILL DOOR BLOCKER LOCKOUT LINK -
REMOVAL, FUEL.....................23-52
FILL/CHECK LOCATIONS - DESCRIPTION,
FLUID...............................0-7
FILLER CAP - DESCRIPTION, FUEL.......25-12
FILLER CAP - OPERATION, FUEL........25-12
FILLER NECK SEAL - DIAGNOSIS AND
TESTING, RADIATOR CAP TO............7-27
FILLER TUBE - INSTALLATION, FUEL
TANK ..............................14-12
FILLER TUBE - REMOVAL, FUEL TANK....14-12
FILLING - STANDARD PROCEDURE,
COOLING SYSTEM.......................7-5
FILLING - STANDARD PROCEDURE,
HEATER CORE.......................24-98
FILTER - DESCRIPTION, AIR............24-39
FILTER - DESCRIPTION, OIL.............9-53
FILTER - INSTALLATION, AIR...........24-40
FILTER - INSTALLATION, FUEL...........14-4
FILTER - INSTALLATION, INLET..........14-13
FILTER - INSTALLATION, OIL.......9-139,9-53
FILTER - REMOVAL, AIR...............24-39
FILTER - REMOVAL, FUEL...............14-4
FILTER - REMOVAL, INLET.............14-13
FILTER - REMOVAL, OIL...........9-139,9-53
FILTER ADAPTER - INSTALLATION, OIL . . . 9-139
FILTER ADAPTER - REMOVAL, OIL.......9-139
FILTER CHANGE - STANDARD
PROCEDURE, ENGINE OIL..........9-137,9-53
FILTER SERVICE - STANDARD
PROCEDURE, FLUID.................21-203
FINAL DRIVE - ASSEMBLY............21-195
FINAL DRIVE - DISASSEMBLY.........21-190
FINESSE SANDING/BUFFING &
POLISHING - DESCRIPTION............23-84
FINISH - DESCRIPTION, BASE
COAT/CLEARCOAT....................23-84
FIRING ORDER, SPECIFICATIONS.........8I-3
FIRST ROW - BENCH - INSTALLATION,
SEAT BELT BUCKLE..................8O-12
FIRST ROW - BENCH - REMOVAL, SEAT
BELT BUCKLE.......................8O-12
FIRST ROW - OUTBOARD -
INSTALLATION, SEAT BELT &
RETRACTOR........................8O-13
FIRST ROW - OUTBOARD - REMOVAL,
SEAT BELT & RETRACTOR.............8O-13
FIRST ROW INBOARD - QUAD BUCKET -
INSTALLATION, SEAT BELT BUCKLE......8O-11
FIRST ROW INBOARD - QUAD BUCKET -
REMOVAL, SEAT BELT BUCKLE.........8O-11
FITTING - CONNECTING ROD............9-45
FITTING - PISTON RING................9-45
FITTING - STANDARD PROCEDURE,
MAIN BEARING......................9-123
FITTING - STANDARD PROCEDURE,
PISTON RING.......................9-121
FITTING - STANDARD PROCEDURE,
PISTON TO CYLINDER BORE............9-42
FITTING CONNECTING RODS -
STANDARD PROCEDURE...............9-116
FITTING PISTONS - STANDARD
PROCEDURE........................9-117
FITTINGS - STANDARD PROCEDURE,
QUICK-CONNECT
.....................14-13
FLANGE SEAL - INSTALLATION, INPUT
....3-45
FLANGE SEAL - INSTALLATION, OUTPUT
. . . 3-46
FLANGE SEAL - REMOVAL, INPUT
........3-44
FLANGE SEAL - REMOVAL, OUTPUT
.......3-45
12 INDEXRS
Description Group-Page Description Group-Page Description Group-Page
ProCarManuals.com
FLANGE SHIM SELECTION,
ADJUSTMENTS - OUTPUT...............21-7
FLEX DRIVE - DESCRIPTION...........8N-36
FLEX DRIVE - INSTALLATION...........8N-37
FLEX DRIVE - OPERATION.............8N-36
FLEX DRIVE - REMOVAL...............8N-37
FLEX PLATE - INSTALLATION...........9-131
FLEX PLATE - REMOVAL...............9-131
FLEXIBLE FUEL ENGINE OIL -
DESCRIPTION.........................0-3
FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - INSTALLATION............23-82
FLOOR CONSOLE TRAY - BRACKET
ASSEMBLY - REMOVAL................23-82
FLOOR CONSOLE TRAY - INSTALLATION . . 23-81
FLOOR CONSOLE TRAY - REMOVAL......23-81
FLOOR DISTRIBUTION DUCTS -
INSTALLATION.......................24-49
FLOOR DISTRIBUTION DUCTS -
REMOVAL..........................24-48
FLOOR MATS - INSTALLATION, CARPETS . 23-75
FLOOR MATS - REMOVAL, CARPETS.....23-74
FLOW AND PRESSURE TEST -
DIAGNOSIS AND TESTING, POWER
STEERING SYSTEM....................19-1
FLOW CHECK - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-3
FLUID - DESCRIPTION, TRANSMISSION.....0-4
FLUID AND FILTER SERVICE -
STANDARD PROCEDURE..............21-203
FLUID CAPACITIES - SPECIFICATIONS......0-6
FLUID CHANGE - STANDARD
PROCEDURE, DIFFERENTIAL
ASSEMBLY..........................3-40
FLUID CHANGE - STANDARD
PROCEDURE, OVERRUNNING CLUTCH
HOUSING............................3-41
FLUID CHANGE - STANDARD
PROCEDURE, PTU.....................21-5
FLUID CONTAMINATION - DIAGNOSIS
AND TESTING, BRAKE..................5-32
FLUID COOLER - DESCRIPTION.........19-44
FLUID COOLER - INSTALLATION.........19-45
FLUID COOLER - OPERATION...........19-44
FLUID COOLER - REMOVAL............19-44
FLUID DRAIN AND FILL - STANDARD
PROCEDURE........................21-71
FLUID FILL/CHECK LOCATIONS -
DESCRIPTION.........................0-7
FLUID LEAK DIAGNOSIS, DIAGNOSIS
AND TESTING........................21-3
FLUID LEAKAGE - DIAGNOSIS AND
TESTING, TORQUE CONVERTER
HOUSING..........................21-123
FLUID LEVEL AND CONDITION CHECK,
STANDARD PROCEDURE..............21-201
FLUID LEVEL CHECK - STANDARD
PROCEDURE........................21-71
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, BRAKE...................5-32
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, POWER STEERING........19-44
FLUID LEVEL INSPECTION - STANDARD
PROCEDURE.........................21-4
FLUID LEVEL SWITCH - DESCRIPTION,
BRAKE
..............................5-10
FLUID LEVEL SWITCH - INSTALLATION,
BRAKE
..............................5-11
FLUID LEVEL SWITCH - INSTALLATION,
WASHER
...........................8R-16
FLUID LEVEL SWITCH - OPERATION,
BRAKE
..............................5-10
FLUID LEVEL SWITCH - REMOVAL,
BRAKE
..............................5-11
FLUID LEVEL SWITCH - REMOVAL,
WASHER
...........................8R-15
FLUID, SPECIFICATIONS - BRAKE
.........5-33
FLUSH MEASUREMENTS -
SPECIFICATIONS, GAP
................23-121
FLYWHEEL - INSTALLATION
.............6-12
FLYWHEEL - REMOVAL
.................6-12
FOG LAMP - DIAGNOSIS AND TESTING,
FRONT
..............................8L-7
FOG LAMP - EXPORT - DESCRIPTION,
REAR
..............................8L-22
FOG LAMP - EXPORT - INSTALLATION,
FRONT
..............................8L-9FOG LAMP - EXPORT - REMOVAL,
FRONT..............................8L-9
FOG LAMP - INSTALLATION, FRONT.......8L-9
FOG LAMP - REMOVAL, FRONT..........8L-9
FOG LAMP UNIT ALIGNMENT - EXPORT
- STANDARD PROCEDURE, FRONT........8L-9
FOG LAMP UNIT ALIGNMENT -
STANDARD PROCEDURE, FRONT.........8L-9
FOLDAWAY MIRROR SWITCH - EXPORT
- DESCRIPTION, POWER..............8N-48
FOLDAWAY MIRROR SWITCH - EXPORT
- INSTALLATION, POWER..............8N-49
FOLDAWAY MIRROR SWITCH - EXPORT
- OPERATION, POWER................8N-48
FOLDAWAY MIRROR SWITCH - EXPORT
- REMOVAL, POWER..................8N-48
FORK AND SHAFT - DESCRIPTION,
SHIFT.............................21-113
FORM-IN-PLACE GASKETS AND
SEALERS - STANDARD PROCEDURE . . 9-11,9-84
FRAME DIMENSIONS, SPECIFICATIONS....13-4
FRONT - DESCRIPTION, HALF SHAFT.......3-1
FRONT - INSTALLATION, CRANKSHAFT
OIL SEAL.......................9-127,9-40
FRONT - INSTALLATION, HALF SHAFT......3-4
FRONT - INSTALLATION, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-13
FRONT - INSTALLATION, SPRING
MOUNTS............................2-42
FRONT - INSTALLATION, WHEEL
MOUNTING STUDS...................22-21
FRONT - REMOVAL, CRANKSHAFT OIL
SEAL..........................9-127,9-40
FRONT - REMOVAL, HALF SHAFT..........3-2
FRONT - REMOVAL, SEAT BELT &
RETRACTOR - OUTBOARD.............8O-13
FRONT - REMOVAL, SPRING MOUNTS.....2-42
FRONT - REMOVAL, WHEEL MOUNTING
STUDS.............................22-20
FRONT - SPECIFICATIONS, HALF SHAFT . . . 3-15,
3-6
FRONT BRAKE ROTOR - INSTALLATION....5-54
FRONT BRAKE ROTOR - REMOVAL.......5-54
FRONT BUMPER REINFORCEMENT -
INSTALLATION........................13-2
FRONT BUMPER REINFORCEMENT -
REMOVAL...........................13-2
FRONT BUSHING - INSTALLATION, LEAF
SPRING.............................2-29
FRONT BUSHING - REMOVAL, LEAF
SPRING.............................2-28
FRONT CABLE - INSTALLATION..........5-64
FRONT CABLE - INSTALLATION,
PARKING BRAKE LEVER................5-66
FRONT CABLE - REMOVAL..............5-64
FRONT CABLE - REMOVAL, PARKING
BRAKE LEVER........................5-65
FRONT CONTROL MODULE -
DESCRIPTION........................8E-7
FRONT CONTROL MODULE - DIAGNOSIS
AND TESTING........................8E-7
FRONT CONTROL MODULE -
INSTALLATION........................8E-8
FRONT CONTROL MODULE - OPERATION . . 8E-7
FRONT CONTROL MODULE - REMOVAL....8E-8
FRONT CRADLE CROSSMEMBER -
DESCRIPTION........................13-9
FRONT CRADLE CROSSMEMBER
THREAD REPAIR - DESCRIPTION.........13-9
FRONT CROSSMEMBER MOUNT
BUSHINGS - INSTALLATION............13-12
FRONT CROSSMEMBER MOUNT
BUSHINGS - REMOVAL................13-12
FRONT DISC BRAKE CALIPER ADAPTER
- INSTALLATION......................5-31
FRONT DISC BRAKE CALIPER ADAPTER
- REMOVAL..........................5-31
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - INSTALLATION
.....5-27
FRONT DISC BRAKE CALIPER
(DISC/DISC BRAKES) - REMOVAL
.........5-24
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) -
INSTALLATION
........................5-27
FRONT DISC BRAKE CALIPER
(DISC/DRUM BRAKES) - REMOVAL
.......5-24
FRONT DISC BRAKE SHOES (DISC/DISC
BRAKES) - INSTALLATION
...............5-16FRONT DISC BRAKE SHOES (DISC/DISC
BRAKES) - REMOVAL..................5-14
FRONT DISC BRAKE SHOES (DISC/
DRUM BRAKES) - INSTALLATION.........5-17
FRONT DISC BRAKE SHOES (DISC/
DRUM BRAKES) - REMOVAL............5-15
FRONT DOOR GLASS RUN
WEATHERSTRIP - INSTALLATION.......23-110
FRONT DOOR GLASS RUN
WEATHERSTRIP - REMOVAL...........23-110
FRONT DOOR INNER BELT MOLDING -
INSTALLATION......................23-112
FRONT DOOR INNER BELT MOLDING -
REMOVAL.........................23-112
FRONT DOOR OUTER BELT MOLDING -
INSTALLATION......................23-110
FRONT DOOR OUTER BELT MOLDING -
REMOVAL.........................23-110
FRONT DOOR REAR OUTLET -
INSTALLATION.......................24-42
FRONT DOOR REAR OUTLET - REMOVAL . 24-41
FRONT DOOR WEATHERSTRIP -
INSTALLATION......................23-111
FRONT DOOR WEATHERSTRIP -
REMOVAL.........................23-111
FRONT FASCIA - INSTALLATION..........13-1
FRONT FASCIA - REMOVAL..............13-1
FRONT FENDER - INSTALLATION........23-51
FRONT FENDER - REMOVAL............23-51
FRONT FOG LAMP - DIAGNOSIS AND
TESTING............................8L-7
FRONT FOG LAMP - EXPORT -
INSTALLATION........................8L-9
FRONT FOG LAMP - EXPORT - REMOVAL . . 8L-9
FRONT FOG LAMP - INSTALLATION.......8L-9
FRONT FOG LAMP - REMOVAL...........8L-9
FRONT FOG LAMP UNIT ALIGNMENT -
EXPORT - STANDARD PROCEDURE.......8L-9
FRONT FOG LAMP UNIT ALIGNMENT -
STANDARD PROCEDURE................8L-9
FRONT INBOARD - INSTALLATION, SEAT
BELT BUCKLE.......................8O-11
FRONT INBOARD - REMOVAL, SEAT
BELT BUCKLE.......................8O-11
FRONT MOUNT - INSTALLATION....9-131,9-49
FRONT MOUNT - REMOVAL........9-131,9-49
FRONT POSITION LAMP - EXPORT -
INSTALLATION.......................8L-10
FRONT POSITION LAMP - EXPORT -
REMOVAL..........................8L-10
FRONT SEAT - INSTALLATION...........23-90
FRONT SEAT - REMOVAL..............23-90
FRONT SEAT CUSHION SIDE COVER -
INSTALLATION.......................23-93
FRONT SEAT CUSHION SIDE COVER -
REMOVAL..........................23-93
FRONT SEAT RISER - MANUAL TRACK -
INSTALLATION.......................23-93
FRONT SEAT RISER - MANUAL TRACK -
REMOVAL..........................23-93
FRONT SEAT TRACK - REAR COVER -
INSTALLATION.......................23-95
FRONT SEAT TRACK - REAR COVER -
REMOVAL..........................23-95
FRONT SEAT TRACK MANUAL
ADJUSTER - INSTALLATION............23-94
FRONT SEAT TRACK MANUAL
ADJUSTER - REMOVAL................23-94
FRONT SEAT TRACK POWER ADJUSTER
- INSTALLATION.....................23-94
FRONT SEAT TRACK POWER ADJUSTER
- REMOVAL.........................23-94
FRONT SEATBACK - INSTALLATION......23-91
FRONT SEATBACK - REMOVAL..........23-91
FRONT SEATBACK ASSIST STRAP -
INSTALLATION.......................23-91
FRONT SEATBACK ASSIST STRAP -
REMOVAL..........................23-91
FRONT SEATBACK COVER -
INSTALLATION.......................23-92
FRONT SEATBACK COVER - REMOVAL....23-92
FRONT SEATBACK PANEL -
INSTALLATION
.......................23-92
FRONT SEATBACK PANEL - REMOVAL
....23-91
FRONT SUSPENSION - DESCRIPTION
......2-2
FRONT SUSPENSION - OPERATION
........2-2
FRONT SUSPENSION FASTENER
TORQUE, SPECIFICATIONS
...............2-3
RSINDEX13
Description Group-Page Description Group-Page Description Group-Page
ProCarManuals.com
INPUT - OPERATION, DATA BUS
COMMUNICATION RECEIVE - PCM.......8E-15
INPUT - OPERATION, IGNITION SENSE -
PCM...............................8E-15
INPUT - OPERATION, SENSOR RETURN -
PCM...............................8E-15
INPUT - OPERATION, SPEED SENSOR . . . 21-240
INPUT - REMOVAL, SPEED SENSOR.....21-240
INPUT CLUTCH ASSEMBLY - ASSEMBLY . 21-216
INPUT CLUTCH ASSEMBLY -
DISASSEMBLY......................21-208
INPUT FLANGE SEAL - INSTALLATION.....3-45
INPUT FLANGE SEAL - REMOVAL.........3-44
INPUT SHAFT - ASSEMBLY.............21-96
INPUT SHAFT - DESCRIPTION..........21-93
INPUT SHAFT - DISASSEMBLY..........21-93
INPUT SHAFT COVER SEAL -
INSTALLATION.......................21-14
INPUT SHAFT COVER SEAL - REMOVAL . . . 21-13
INPUT SHAFT END SEAL -
INSTALLATION.......................21-16
INPUT SHAFT END SEAL - REMOVAL.....21-15
INPUT SHAFT SEAL - INSTALLATION.....21-18
INPUT SHAFT SEAL - REMOVAL.........21-17
INSIDE HANDLE CABLE - INSTALLATION . . 23-37
INSIDE HANDLE CABLE - REMOVAL......23-37
INSIDE LATCH HANDLE - INSTALLATION . . 23-33
INSIDE LATCH HANDLE - REMOVAL......23-33
INSPECT, INSPECTION...............21-114
INSTRUMENT CLUSTER - DESCRIPTION . . . 8J-1
INSTRUMENT CLUSTER - OPERATION.....8J-1
INSTRUMENT PANEL - INSTALLATION,
LOWER............................23-68
INSTRUMENT PANEL - REMOVAL,
LOWER............................23-68
INSTRUMENT PANEL ANTENNA CABLE -
INSTALLATION.......................8A-9
INSTRUMENT PANEL ANTENNA CABLE -
REMOVAL...........................8A-8
INSTRUMENT PANEL ASSEMBLY -
INSTALLATION.......................23-65
INSTRUMENT PANEL ASSEMBLY -
REMOVAL..........................23-64
INSTRUMENT PANEL CENTER BEZEL -
INSTALLATION.......................23-67
INSTRUMENT PANEL CENTER BEZEL -
REMOVAL..........................23-67
INSTRUMENT PANEL END CAP -
INSTALLATION.......................23-67
INSTRUMENT PANEL END CAP -
REMOVAL..........................23-67
INSTRUMENT PANEL OUTLET -
INSTALLATION.......................24-42
INSTRUMENT PANEL OUTLET -
REMOVAL..........................24-42
INSTRUMENT PANEL TOP COVER -
INSTALLATION.......................23-67
INSTRUMENT PANEL TOP COVER -
REMOVAL..........................23-67
INSTRUMENT PANEL TOP PAD
ASSEMBLY - INSTALLATION............23-70
INSTRUMENT PANEL TOP PAD
ASSEMBLY - REMOVAL................23-70
INTAKE MANIFOLD - DESCRIPTION . . 9-144,9-58
INTAKE MANIFOLD - INSTALLATION,
LOWER............................9-149
INTAKE MANIFOLD - INSTALLATION,
UPPER.............................9-147
INTAKE MANIFOLD - LOWER -
CLEANING..........................9-148
INTAKE MANIFOLD - LOWER -
INSPECTION....................9-148,9-60
INTAKE MANIFOLD - LOWER -
INSTALLATION........................9-60
INTAKE MANIFOLD - LOWER - REMOVAL . . 9-60
INTAKE MANIFOLD - REMOVAL, LOWER . . 9-148
INTAKE MANIFOLD - REMOVAL, UPPER . . . 9-145
INTAKE MANIFOLD - UPPER -
INSPECTION.........................9-59
INTAKE MANIFOLD - UPPER -
INSTALLATION........................9-59
INTAKE MANIFOLD - UPPER - REMOVAL
. . . 9-58
INTAKE MANIFOLD LEAKS - DIAGNOSIS
AND TESTING
...................9-145,9-58
INTAKE MANIFOLD VACUUM PORT
REPAIR - STANDARD PROCEDURE
.......9-145
INTAKE PIPE - INSTALLATION, AIR
......24-113
INTAKE PIPE - REMOVAL, AIR
.........24-112INTAKE/EXHAUST VALVES & SEATS -
CLEANING......................9-105,9-32
INTAKE/EXHAUST VALVES & SEATS -
DESCRIPTION...................9-104,9-32
INTAKE/EXHAUST VALVES & SEATS -
INSPECTION........................9-105
INTAKE/EXHAUST VALVES & SEATS -
INSTALLATION.......................9-106
INTAKE/EXHAUST VALVES & SEATS -
OPERATION.........................9-104
INTAKE/EXHAUST VALVES & SEATS -
REMOVAL..........................9-105
INTEGRAL ANTENNA - EXPORT -
DESCRIPTION, QUARTER GLASS.........8A-9
INTEGRAL ANTENNA - EXPORT -
DIAGNOSIS AND TESTING, QUARTER
GLASS..............................8A-9
INTEGRAL ANTENNA - EXPORT -
OPERATION, QUARTER GLASS...........8A-9
INTEGRATED POWER MODULE -
DESCRIPTION.....................8W-97-3
INTEGRATED POWER MODULE -
INSTALLATION....................8W-97-4
INTEGRATED POWER MODULE -
OPERATION.......................8W-97-3
INTEGRATED POWER MODULE -
REMOVAL........................8W-97-4
INTERACTIVE SPEED CONTROL (4
SPEED EATX ONLY) - OPERATION........8P-2
INTERFACE (PCI) BUS, OPERATION -
PROGRAMMABLE COMMUNICATIONS....14-21
INTERIOR LAMPS, SPECIFICATIONS......8L-25
INTERLOCK - DESCRIPTION, IGNITION....19-17
INTERLOCK SOLENOID - DESCRIPTION,
SHIFT.............................21-233
INTERLOCK SOLENOID - DIAGNOSIS
AND TESTING, BRAKE/TRANSMISSION
SHIFT.............................21-235
INTERLOCK SOLENOID - INSTALLATION,
SHIFT.............................21-236
INTERLOCK SOLENOID - OPERATION,
SHIFT.............................21-233
INTERLOCK SOLENOID - REMOVAL,
SHIFT.............................21-235
INTERLOCK SWITCH - INSTALLATION,
CLUTCH PEDAL.......................6-14
INTERLOCK SWITCH - REMOVAL,
CLUTCH PEDAL.......................6-13
INTERMEDIATE SHAFT - ASSEMBLY.....21-107
INTERMEDIATE SHAFT - DESCRIPTION . . 21-100
INTERMEDIATE SHAFT - DISASSEMBLY . . 21-100
INTERNATIONAL SYMBOLS -
DESCRIPTION......................Intro.-5
INTERNATIONAL SYMBOLS -
DESCRIPTION.........................0-1
INTRODUCTION - DIAGNOSIS AND
TESTING, ENGINE DIAGNOSIS........9-3,9-76
IOD FUSE - DESCRIPTION...........8W-97-4
IOD FUSE - INSTALLATION...........8W-97-5
IOD FUSE - OPERATION.............8W-97-5
IOD FUSE - REMOVAL..............8W-97-5
JOINT - DESCRIPTION, LOWER BALL......2-10
JOINT - DIAGNOSIS AND TESTING,
LOWER BALL........................2-10
JOINT - OPERATION, LOWER BALL.......2-10
JOINT MOLDING - INSTALLATION, ROOF . . 23-57
JOINT MOLDING - REMOVAL, ROOF......23-57
JOINT SEAL BOOT - INSTALLATION,
BALL
...............................2-11
JOINT SEAL BOOT - REMOVAL, BALL
.....2-11
JOUNCE BUMPER - DESCRIPTION
........2-35
JOUNCE BUMPER - OPERATION
..........2-35
JUMP STARTING - STANDARD
PROCEDURE
.........................0-15
JUNCTION BLOCK - DESCRIPTION,
NON-ABS
............................5-33
JUNCTION BLOCK - INSTALLATION,
NON-ABS
............................5-33
JUNCTION BLOCK - OPERATION,
NON-ABS
............................5-33
JUNCTION BLOCK - REMOVAL, NON-ABS
. . 5-33
KEY - DESCRIPTION, TRANSPONDER
.....8Q-3
KEY - OPERATION, TRANSPONDER
.......8Q-3
KEY IMMOBILIZER MODULE -
DESCRIPTION, SENTRY
................8E-18
KEY IMMOBILIZER MODULE -
INSTALLATION, SENTRY
...............8E-19KEY IMMOBILIZER MODULE -
OPERATION, SENTRY.................8E-18
KEY IMMOBILIZER MODULE - REMOVAL,
SENTRY............................8E-18
KEY IMMOBILIZER SYSTEM -
DIAGNOSIS AND TESTING, SENTRY.......8Q-3
KEYLESS ENTRY MODULE -
DESCRIPTION, REMOTE...............8N-43
KEYLESS ENTRY MODULE - DIAGNOSIS
AND TESTING, REMOTE...............8N-43
KEYLESS ENTRY MODULE -
INSTALLATION, REMOTE..............8N-44
KEYLESS ENTRY MODULE - OPERATION,
REMOTE...........................8N-43
KEYLESS ENTRY MODULE - REMOVAL,
REMOTE...........................8N-44
KEYLESS ENTRY TRANSMITTER -
DIAGNOSIS AND TESTING.............8N-42
KEY/LOCK CYLINDER - DESCRIPTION....19-20
KEY/LOCK CYLINDER - INSTALLATION....19-20
KEY/LOCK CYLINDER - OPERATION......19-20
KEY/LOCK CYLINDER - REMOVAL.......19-20
KNOB - INSTALLATION, GEARSHIFT......21-87
KNOB - INSTALLATION, SEAT BELT
HEIGHT ADJUSTER...................8O-13
KNOB - REMOVAL, GEARSHIFT..........21-87
KNOB - REMOVAL, SEAT BELT HEIGHT
ADJUSTER.........................8O-13
KNOCK SENSOR - DESCRIPTION..........8I-8
KNOCK SENSOR - OPERATION...........8I-8
KNUCKLE - DESCRIPTION.................2-6
KNUCKLE - INSPECTION, STEERING........2-9
KNUCKLE - INSTALLATION, STEERING......2-9
KNUCKLE - OPERATION.................2-7
KNUCKLE - REMOVAL, STEERING.........2-7
LABEL - DESCRIPTION, E-MARK......Intro.-11
LABEL - DESCRIPTION, VECI.........Intro.-11
LABEL - DESCRIPTION, VEHICLE
EMISSION CONTROL INFORMATION.......25-1
LABEL - DESCRIPTION, VEHICLE SAFETY
CERTIFICATION....................Intro.-11
LAMP - DESCRIPTION, VTSS/SKIS
INDICATOR..........................8Q-5
LAMP - DIAGNOSIS AND TESTING,
FRONT FOG..........................8L-7
LAMP - EXPORT - DESCRIPTION, REAR
FOG ...............................8L-22
LAMP - EXPORT - INSTALLATION,
FRONT FOG..........................8L-9
LAMP - EXPORT - INSTALLATION,
FRONT POSITION....................8L-10
LAMP - EXPORT - INSTALLATION,
PARK/TURN SIGNAL..................8L-22
LAMP - EXPORT - INSTALLATION,
REPEATER..........................8L-22
LAMP - EXPORT - INSTALLATION, TAIL . . . 8L-23
LAMP - EXPORT - REMOVAL, FRONT
FOG ................................8L-9
LAMP - EXPORT - REMOVAL, FRONT
POSITION..........................8L-10
LAMP - EXPORT - REMOVAL,
PARK/TURN SIGNAL..................8L-22
LAMP - EXPORT - REMOVAL, REPEATER . . 8L-22
LAMP - EXPORT - REMOVAL, TAIL.......8L-23
LAMP - INSTALLATION, CENTER HIGH
MOUNTED STOP......................8L-6
LAMP - INSTALLATION, COURTESY......8L-26
LAMP - INSTALLATION, DOME/CARGO....8L-26
LAMP - INSTALLATION, FRONT FOG.......8L-9
LAMP - INSTALLATION, LICENSE........8L-20
LAMP - INSTALLATION, LIFTGATE.......8L-27
LAMP - INSTALLATION, PARK/TURN
SIGNAL............................8L-21
LAMP - INSTALLATION, READING........8L-28
LAMP - INSTALLATION, TAIL...........8L-22
LAMP - INSTALLATION, VANITY.........8L-28
LAMP - OPERATION, VTSS/SKIS
INDICATOR..........................8Q-5
LAMP - REMOVAL, CENTER HIGH
MOUNTED STOP......................8L-6
LAMP - REMOVAL, COURTESY..........8L-26
LAMP - REMOVAL, DOME/CARGO.......8L-26
LAMP - REMOVAL, FRONT FOG..........8L-9
LAMP - REMOVAL, LICENSE
............8L-20
LAMP - REMOVAL, LIFTGATE
...........8L-27
LAMP - REMOVAL, PARK/TURN SIGNAL
. . 8L-21
LAMP - REMOVAL, READING
...........8L-27
LAMP - REMOVAL, TAIL
...............8L-22
RSINDEX17
Description Group-Page Description Group-Page Description Group-Page
ProCarManuals.com