2003 CHRYSLER CARAVAN maintenance

[x] Cancel search: maintenance

Page 1712 of 2177

CHRYSLER CARAVAN 2003  Service Manual TIRES/WHEELS
TABLE OF CONTENTS
page page
TIRES/WHEELS
DIAGNOSIS AND TESTING - TIRE AND
WHEEL VIBRATION.....................1
STANDARD PROCEDURE
STANDARD PROCEDURE - TIRE AND
WHEEL BALANCE.............

Page 1713 of 2177

CHRYSLER CARAVAN 2003  Service Manual unique wheel weights. They are designed to fit the
contour of the wheel (Fig. 1).
²Inspect tires and wheels for damage, mud pack-
ing and unusual wear; correct as necessary.
²Check and adjust tire a

Page 1731 of 2177

CHRYSLER CARAVAN 2003  Service Manual (1) Place the wheel cover on the wheel in the fol-
lowing fashion:
(a) Align the valve notch in the wheel cover with
the valve stem on the wheel.
(b) At the same time, align the two holes in the
wheel

Page 1732 of 2177

CHRYSLER CARAVAN 2003  Service Manual Remover, Special Tool C-4150A on hub and bearing
assembly flange and wheel stud (Fig. 35).
(7) Tighten down on special tool, pushing wheel
stud out of the hub flange. When shoulder of wheel
stud is pa

Page 1735 of 2177

CHRYSLER CARAVAN 2003  Service Manual DIAGNOSIS AND TESTING
DIAGNOSIS AND TESTING - WATER LEAKS
Water leaks can be caused by poor sealing,
improper body component alignment, body seam
porosity, missing plugs, or blocked drain holes. Cen-

Page 1787 of 2177

CHRYSLER CARAVAN 2003  Service Manual (3) Align with paint breaks around bolt heads.
(4) Install bolts attaching ends of crossmember to
radiator closure panel (Fig. 14). Tighten bolts to 19
N´m (14 ft. lbs.) torque.
(5) Install bolts att

Page 2129 of 2177

CHRYSLER CARAVAN 2003  Service Manual VAPOR CANISTER
DESCRIPTION
There are 2 EVAP canisters on the vehicle. The
vacuum and vapor tubes connect to the top of the
canister. It is a charcoal canister (Fig. 15) or (Fig.
16).
OPERATION
All veh

Page 2158 of 2177

CHRYSLER CARAVAN 2003  Service Manual LIFTGATE MOTOR - OPERATION.........8N-15
LIFTGATE MOTOR - REMOVAL..........8N-15
LIFTGATE SIDE - INSTALLATION.........23-43
LIFTGATE SIDE - REMOVAL............23-43
LIFTGATE SILL PLATE - INSTALLATION