2 - 21
SPEC
 
CABLE ROUTING DIAGRAM 
EC240000 
CABLE ROUTING DIAGRAM 
1 
Hose guide 
2 
Brake hose 
3 
Fuel tank breather hose 
4 
Oil tank breather hose 
5 
Clamp 
6 
Sub wire harness 
7 
TPS (throttle position 
sensor) lead 
8 
Neutral switch lead 
9 
Oil hose 
0 
Hose holder 
A 
CDI magneto lead 
B 
Clutch cable 
C 
Cylinder head breather hose 
D 
Carburetor breather hose 
E 
Overflow hose 
Å 
Pass the clutch cable through
the cable guide. 
ı 
Pass the fuel tank breather hose
between the handlebar and ten-
sion bar, then insert its end into
the hole of the number plate. 
Ç 
Pass the decompression cable
under the oil tank breather pipe. 
Î 
Fasten the CDI magneto lead
and neutral switch lead to the
frame with a plastic locking tie
and cut off the tie end. 
‰ 
Fasten the sub wire harness to
the frame at the white tape for
the sub wire harness with a
plastic locking tie and cut off the
tie end. 
Ï 
Pass the cylinder head breather
hose along the right side of the
oil tank breather hose. 
Ì 
Fasten the sub wire harness to
the frame with a plastic locking
tie ends at the lower left of the
frame and cut off the tie end. For
fastening, pass the plastic lock-
ing tie through the upper holes
in the engine brackets. 
Ó 
Pass the sub wire harness
between the engine brackets.