2002 YAMAHA YZ250F ignition

[x] Cancel search: ignition

Page 166 of 666

YAMAHA YZ250F 2002  Betriebsanleitungen (in German) 3 - 4
INSP
ADJ
PRE-OPERATION INSPECTION AND MAINTENANCE
EC320000
PRE-OPERATION INSPECTION AND MAINTENANCE
Before riding for break-in operation, practice or a race, make sure the machine is in good ope

Page 256 of 666

YAMAHA YZ250F 2002  Betriebsanleitungen (in German) 3 - 47
INSP
ADJ
IGNITION TIMING CHECK
IGNITION TIMING CHECK
1. Remove:
Timing mark accessing screw 1 
2. Attach:
Timing light 
Inductive tachometer 
To the spark plug lead.
3. Check:
Ignition timi

Page 586 of 666

YAMAHA YZ250F 2002  Betriebsanleitungen (in German)  
6 - 1
–+ELEC
 
ELECTRICAL COMPONENTS AND WIRING DIAGRAM 
EC600000 
ELECTRICAL 
EC610000 
ELECTRICAL COMPONENTS AND WIRING DIAGRAM 
EC611000 
ELECTRICAL COMPONENTS 
1  
Engine stop switch  
2  
Thr

Page 588 of 666

YAMAHA YZ250F 2002  Betriebsanleitungen (in German) –+ELEC
 
6 - 2 
MAP-CONTROLLED CDI UNIT
MAP-CONTROLLED CDI UNIT 
A map-controlled, CDI ignition system is used in the YZ250F.
The microcomputer in the CDI unit detects the engine speed and throttle

Page 592 of 666

YAMAHA YZ250F 2002  Betriebsanleitungen (in German) –+ELEC
 
6 - 3 
IGNITION SYSTEM 
EC620000 
IGNITION SYSTEM 
INSPECTION STEPS 
Use the following steps for checking the possibility of the malfunctioning engine being attributable to
ignition system

Page 596 of 666

YAMAHA YZ250F 2002  Betriebsanleitungen (in German)  
6 - 4
–+ELEC
 
IGNITION SYSTEM 
SPARK GAP TEST  
1. Disconnect the spark plug cap from spark
plug.
2. Connect the dynamic spark tester   
1  
(ignition checker   
2  
) as shown. 
 
Spark plug ca

Page 598 of 666

YAMAHA YZ250F 2002  Betriebsanleitungen (in German)  
6 - 5
–+ELEC
 
IGNITION SYSTEM 
EC626002 
IGNITION COIL INSPECTION 
1. Inspect: 
 
Primary coil resistance
Out of specification  
→ 
 Replace. 
Tester (+) lead  
→ 
 Orange lead  
1 
 
Tester

Page 600 of 666

YAMAHA YZ250F 2002  Betriebsanleitungen (in German) 6 - 6
–+ELECIGNITION SYSTEM
2. Inspect:
Charging coil 1 resistance
Out of specification → Replace.
3. Inspect:
Charging coil 2 resistance
Out of specification → Replace. Tester (+) lead → Br
Page:   < prev 1-8 9-16 17-24 next >