2002 JEEP GRAND CHEROKEE Intake connector

[x] Cancel search: Intake connector

Page 222 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual PRESSURE HOLD
Both solenoid valves are closed in the pressure
hold cycle. Fluid apply pressure in the control chan-
nel is maintained at a constant rate. The CAB main-
tains the hold cycle until senso

Page 259 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (2) Disconnect electrical connector from ECT sen-
sor (Fig. 20).
(3) Remove sensor from thermostat housing.
REMOVALÐ4.7L ENGINE
WARNING: HOT, PRESSURIZED COOLANT CAN
CAUSE INJURY BY SCALDING. COOLING

Page 270 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual INSPECTION
The radiator cooling fins should be checked for
damage or deterioration. Inspect cooling fins to make
sure they are not bent or crushed, these areas result
in reduced heat exchange causing

Page 297 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (4) Disconnect the instrument panel wire harness
connectors and the antenna coaxial cable connector
from the receptacles on the rear of the radio receiver.
(5) Remove the radio receiver from the instr

Page 316 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual faults arenoterased if the battery is disconnected.
(Fig. 4)
REMOVAL
(1) Remove negative battery cable from the bat-
tery.
(2) Remove air cleaner housing,(Refer to 9 -
ENGINE/AIR INTAKE SYSTEM/AIR CLE

Page 351 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (4) Loosen the battery positive cable terminal
clamp pinch-bolt hex nut.
(5) Disconnect the battery positive cable terminal
clamp from the battery positive terminal post. If nec-
essary, use a battery

Page 352 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (5) Install and tighten the nut that secures the
battery positive cable eyelet terminal to the B(+) ter-
minal stud on the starter solenoid. Tighten the nut to
11.3 N´m (100 in. lbs.).
(6) Install an

Page 409 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual OPERATION
Battery voltage is supplied to the 8 ignition coils
from the ASD relay. The Powertrain Control Module
(PCM) opens and closes each ignition coil ground cir-
cuit at a determined time for igni
Page:   1-8 9-16 17-24 25-32 33-40 ... 56 next >