2002 JEEP GRAND CHEROKEE change time

[x] Cancel search: change time

Page 1300 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual INSTALLATION
A gear-type oil pump is mounted at the underside
of the cylinder block opposite the No.4 main bearing.
(1) Install the oil pump on the cylinder block using
a replacement gasket. Tighten t

Page 1363 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual Check the connecting rod for signs of twist or bend-
ing.
Check the piston for taper and elliptical shape
before it is fitted into the cylinder bore (Refer to 9 -
ENGINE/ENGINE BLOCK/PISTON & CONNECT-

Page 1374 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual CRANKCASE OIL LEVEL INSPECTION
CAUTION: Do not overfill crankcase with engine oil,
pressure loss or oil foaming can result.
Inspect engine oil level approximately every 800
kilometers (500 miles). Unl

Page 1429 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (5) Connect (-) and (+) test cable leads into LCS
adapter receptacles. Use10 amp (10A +)receptacle
and common (-) receptacles.
(6) Gain access to MAIN MENU on DRB screen.
(7) Press DVOM button on DRB.

Page 1463 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The PCM determines injector on-time (pulse width)
based on various inputs.
DIAGNOSIS AND TESTING - FUEL INJECTOR
To perform a complete test of the fuel injectors and
their circuitry, use the DRB scan

Page 1464 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The PCM uses the IAC motor to control idle speed
(along with timing) and to reach a desired MAP dur-
ing decel (keep engine from stalling).
The IAC motor has 4 wires with 4 circuits. Two of
the wires

Page 1467 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual MAP SENSOR
DESCRIPTION
DESCRIPTION
On the 4.0L six-cylinder engine the MAP sensor is
mounted to the engine throttle body. On the 4.7L V-8
engine the MAP sensor is mounted to front of the
intake manifo

Page 1469 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The other two heater elements (downstream sen-
sors 1/2 and 2/2) are controlled by the downstream
heater relay through output signals from the PCM.
To avoid a large simultaneous current surge, power
i
Page:   < prev 1-10 ... 9-16 17-24 25-32 33-40 41-48 49-56 next >