2002 JEEP GRAND CHEROKEE lock

[x] Cancel search: lock

Page 1289 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (11) Lower the vehicle until it is about 2 feet from
the floor.
CAUTION: Ensure that the connecting rod bolts DO
NOT scratch the crankshaft journals or cylinder
walls. Short pieces of rubber hose, sli

Page 1293 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual NOTE: Before the engine or the transmission can
be removed the engine bending braces must be
removed.
(1) Raise and support vehicle.
NOTE: Both left and right side bending braces are
removed the samew

Page 1294 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual crankshaft is drilled internally to pass oil from the
main bearing journals (except number 4 main bear-
ing journal) to the connecting rod journals. Each con-
necting rod bearing cap has a small squir

Page 1297 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual All Jeep engines are equipped with a high quality
full-flow, throw-away type oil filter. DaimlerChrysler
Corporation recommends a Mopartor equivalent oil
filter be used.
(1) Position a drain pan under

Page 1298 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (10) Place a piece of wood (2 x 2) between the jack
stand and the engine vibration damper.
(11) Remove the engine mount through bolts.
(12) Using the jack stand, raise the engine until
adequate cleara

Page 1299 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (9) Lower the engine until it is properly located on
the engine mounts.
(10) Install the through bolts and tighten the nuts.
(11) Lower the jack stand and remove the piece of
wood.
(12) Install the en

Page 1300 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual INSTALLATION
A gear-type oil pump is mounted at the underside
of the cylinder block opposite the No.4 main bearing.
(1) Install the oil pump on the cylinder block using
a replacement gasket. Tighten t

Page 1301 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (3) Install intake manifold on the cylinder head
dowels.
(4) Install washer and fastener Numbers 1, 2, 4, 5,
8, 9, 10 and 11 (Fig. 84).
(5) Install washer and fastener Numbers 6 and 7
(Fig. 84).
(6) T