2002 JEEP GRAND CHEROKEE Abs module

[x] Cancel search: Abs module

Page 1376 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual NOTE: When installing oil pan gasket/windage tray,
start four pan bolts at each corner before tightening
oil pickup tube. This will keep pan gasket in align-
ment.
(3) Install oil pump pick-up tube us

Page 1467 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual MAP SENSOR
DESCRIPTION
DESCRIPTION
On the 4.0L six-cylinder engine the MAP sensor is
mounted to the engine throttle body. On the 4.7L V-8
engine the MAP sensor is mounted to front of the
intake manifo

Page 1585 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual Normal calibration will be performed when sump
temperature is above 50 degrees F, or in the absence
of sump temperature data, after the first 10 minutes
of vehicle operation. Calibration of the pressu

Page 1903 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (3) Install fascia, refer to (Refer to 13 - FRAMES
& BUMPERS/BUMPERS/FRONT FASCIA - INSTAL-
LATION).
HEADLAMP MOUNTING
MODULE
REMOVAL
CAUTION: Take special care when handling the
HMM not to damage the

Page 1937 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual INSTRUMENT PANEL
STEERING COLUMN SUPPORT
BRACKET
REMOVAL
WARNING: ON VEHICLES EQUIPPED WITH AIR-
BAGS, DISABLE THE AIRBAG SYSTEM BEFORE
ATTEMPTING ANY STEERING WHEEL, STEERING
COLUMN, OR INSTRUMENT PA

Page 2079 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual OPERATION
OPERATION - HEATER AND AIR CONDITIONER
Outside fresh air enters the vehicle through the
cowl top opening at the base of the windshield, and
passes through a plenum chamber to the HVAC sys-
t

Page 2102 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual INSTALLATION
(1) Plug the wire harness and/or vacuum harness
connectors into the back of the a/c heater control.
(2) Position the a/c heater control in the instru-
ment panel and secure it with 4 scre

Page 2139 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual STANDARD PROCEDURE - REFRIGERANT SYS-
TEM EVACUATE)
(8) Charge the refrigerant system. (Refer to 24 -
HEATING & AIR CONDITIONING/PLUMBING -
STANDARD PROCEDURE - REFRIGERANT SYS-
TEM CHARGE)
(9) Connec
Page:   < prev 1-10 9-16 17-24 25-32