2002 JEEP GRAND CHEROKEE Engine ground

[x] Cancel search: Engine ground

Page 324 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual DESCRIPTION - POWER GROUNDS
The Powertrain Control Module (PCM) has 2 main
grounds. Both of these grounds are referred to as
power grounds. All of the high-current, noisy, electri-
cal devices are con

Page 327 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual sponder through a tuned antenna ring integral to the
SKIM housing. If this antenna ring is not mounted
properly around the ignition lock cylinder housing,
communication problems between the SKIM and t

Page 328 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (3) Disconnect the instrument panel wire harness
connector from the SKIM connector.
(4) Remove the screw that secures the SKIM to
the bottom of the steering column housing (Fig. 16).
(5) Disengage the

Page 349 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The battery cables (Fig. 17) or (Fig. 18) are large
gauge, stranded copper wires sheathed within a
heavy plastic or synthetic rubber insulating jacket.
The wire used in the battery cables combines exc

Page 350 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (1) Connect the positive lead of the voltmeter to
the battery negative terminal post. Connect the neg-
ative lead of the voltmeter to the battery negative
cable terminal clamp (Fig. 19). Rotate and ho

Page 351 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (4) Loosen the battery positive cable terminal
clamp pinch-bolt hex nut.
(5) Disconnect the battery positive cable terminal
clamp from the battery positive terminal post. If nec-
essary, use a battery

Page 352 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (5) Install and tighten the nut that secures the
battery positive cable eyelet terminal to the B(+) ter-
minal stud on the starter solenoid. Tighten the nut to
11.3 N´m (100 in. lbs.).
(6) Install an

Page 355 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual CHARGING
TABLE OF CONTENTS
page page
CHARGING
DESCRIPTION.........................24
OPERATION...........................24
DIAGNOSIS AND TESTING - CHARGING
SYSTEM............................24
SPECIF
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 49-56 ... 160 next >