2002 JEEP GRAND CHEROKEE wire ground

[x] Cancel search: wire ground

Page 1314 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual ²Abrasive pad or paper to clean cylinder block
and head
²High speed power tool with an abrasive pad or a
wire brush (Fig. 2)
NOTE: Multi-Layer Steel (MLS) head gaskets require
a scratch free sealing

Page 1376 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual NOTE: When installing oil pan gasket/windage tray,
start four pan bolts at each corner before tightening
oil pickup tube. This will keep pan gasket in align-
ment.
(3) Install oil pump pick-up tube us

Page 1461 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (2) Disconnect CKP electrical connector at sensor
(Fig. 22).
(3) Remove CKP mounting bolt (Fig. 23).
(4) Carefully twist sensor from cylinder block.(5) Remove sensor from vehicle.
(6) Check condition

Page 1462 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (5) Push sensor against flywheel/drive plate. With
sensor pushed against flywheel/drive plate, tighten
mounting bolt to 7 N´m (60 in. lbs.) torque.
(6) Route sensor wiring harness into wire shield.
(

Page 1463 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The PCM determines injector on-time (pulse width)
based on various inputs.
DIAGNOSIS AND TESTING - FUEL INJECTOR
To perform a complete test of the fuel injectors and
their circuitry, use the DRB scan

Page 1464 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The PCM uses the IAC motor to control idle speed
(along with timing) and to reach a desired MAP dur-
ing decel (keep engine from stalling).
The IAC motor has 4 wires with 4 circuits. Two of
the wires

Page 1465 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual INSTALLATION
INSTALLATION - 4.0L
The IAC motor is located on the throttle body.
(1) Install IAC motor to throttle body.
(2) Install and tighten two mounting bolts (screws)
to 7 N´m (60 in. lbs.) torq

Page 1469 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The other two heater elements (downstream sen-
sors 1/2 and 2/2) are controlled by the downstream
heater relay through output signals from the PCM.
To avoid a large simultaneous current surge, power
i