2002 JEEP GRAND CHEROKEE bleed

[x] Cancel search: bleed

Page 196 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (6) Seat dust boot in caliper (Fig. 41) with
Installer 8280 and Handle C-4171.
(7) Install the second piston and dust boot.
(8)
Install caliper slide pin bushings into the caliper.
(9) Install caliper

Page 197 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual (6) Seat dust boot in caliper with Installer 8280
and Handle C-4171 (Fig. 45).
(7) Install caliper slide pin bushings into the cali-
per (Fig. 46).
(8) Install caliper bleed screw.
INSTALLATION
INSTAL

Page 200 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual STANDARD PROCEDURE - MASTER CYLINDER
BLEEDING PROCEDURE
A new master cylinder should be bled before instal-
lation on the vehicle. Required bleeding tools include
bleed tubes and a wood dowel to strok

Page 206 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual REMOVAL
(1) Remove the master cylinder.
(2) Disconnect vacuum hose at booster check valve.
(3) Remove retainer clip (Fig. 60) that holds
booster push rod on pedal pin. Then slide push rod
off pin.
(4)

Page 216 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual BRAKES - ABS
TABLE OF CONTENTS
page page
BRAKES - ABS
DESCRIPTION.........................41
OPERATION...........................41
DIAGNOSIS AND TESTING - ANTILOCK
BRAKES............................4

Page 217 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual DIAGNOSIS AND TESTING - ANTILOCK
BRAKES
The ABS brake system performs several self-tests
every time the ignition switch is turned on and the
vehicle is driven. The CAB monitors the systems
input and o

Page 221 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual INSTALLATION
(1) Insert the sensor through the backing plate
(Fig. 9).
(2) Apply Mopar Lock N Seal or Loctite 242tto
the original sensor bolt. Use a new bolt if the original
is worn or damaged.
(3) T

Page 222 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual PRESSURE HOLD
Both solenoid valves are closed in the pressure
hold cycle. Fluid apply pressure in the control chan-
nel is maintained at a constant rate. The CAB main-
tains the hold cycle until senso