2002 JEEP GRAND CHEROKEE turn

[x] Cancel search: turn

Page 411 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The voltage signal produced by the knock sensor
increases with the amplitude of vibration. The PCM
receives the knock sensor voltage signal as an input.
If the signal rises above a predetermined level

Page 416 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual INSTRUMENT CLUSTER
TABLE OF CONTENTS
page page
INSTRUMENT CLUSTER
DESCRIPTION..........................2
OPERATION............................4
DIAGNOSIS AND TESTING - INSTRUMENT
CLUSTER..............

Page 418 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual EMIC also uses several hard wired inputs in order to
perform its many functions. The EMIC module incor-
porates a blue-green digital Vacuum Fluorescent Dis-
play (VFD) for displaying odometer and trip

Page 419 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual OPERATION
The ElectroMechanical Instrument Cluster (EMIC)
is designed to allow the vehicle operator to monitor
the conditions of many of the vehicle components and
operating systems. The gauges and in

Page 420 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual certain conditions or inputs to provide the vehicle
operator with an audible alert to supplement a visual
indication.
The EMIC circuitry operates on battery current
received through fused B(+) fuses i

Page 421 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual The VFD is diagnosed using the EMIC self-diag-
nostic actuator test. (Refer to 8 - ELECTRICAL/IN-
STRUMENT CLUSTER - DIAGNOSIS AND
TESTING). Proper testing of the PCI data bus and
the data bus message

Page 422 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual an input from the auto headlamp light sensor to
determine the ambient light levels. If the BCM
decides that the exterior lighting is turned on in the
daylight, it overrides the selected panel dimmer
s

Page 423 of 2199

JEEP GRAND CHEROKEE 2002 WJ / 2.G Workshop Manual the JB and the Power Distribution Center (PDC) as
required.
(3) Check the fused ignition switch output (run-
start) fuse (Fuse 22 - 10 ampere) in the JB. If OK, go
to Step 4. If not OK, repair the sho