2002 CHRYSLER VOYAGER electric

[x] Cancel search: electric

Page 1196 of 2399

CHRYSLER VOYAGER 2002  Service Manual 8W-97 POWER DISTRIBUTION SYSTEM
TABLE OF CONTENTS
page page
POWER DISTRIBUTION SYSTEM
DESCRIPTION..........................1
OPERATION............................1
SPECIAL TOOLS
POWER DISTRIBUTION SYS

Page 1197 of 2399

CHRYSLER VOYAGER 2002  Service Manual SPECIAL TOOLS
POWER DISTRIBUTION SYSTEMS
ACCESSORY RELAY
DESCRIPTION
The accessory relay is an electromechanical device
that switches fused battery current to the accessory
powered vehicle circuits wh

Page 1199 of 2399

CHRYSLER VOYAGER 2002  Service Manual tion of the service manual for complete IPM circuit
schematics.
REMOVAL
(1) Disconnect the negative and positive battery
cables.
(2) Remove the battery thermal guard from the
vehicle. Refer to the Bat

Page 1200 of 2399

CHRYSLER VOYAGER 2002  Service Manual tion. The IOD fuse is a 15 ampere blade-type car-
tridge fuse and, when removed, it is stored in a fuse
cavity adjacent to the washer fuse within the IPM.
OPERATION
The term ignition-off draw identifi

Page 1205 of 2399

CHRYSLER VOYAGER 2002  Service Manual DIAGNOSIS AND TESTING - ENGINE
DIAGNOSIS - PERFORMANCE
CONDITION POSSIBLE CAUSE CORRECTION
ENGINE WILL NOT START 1. Weak battery. 1. Test battery. Charge or replace
as necessary. (Refer to 8 -
ELECTRI

Page 1214 of 2399

CHRYSLER VOYAGER 2002  Service Manual NOTE: When the transaxle cooler lines are removed
from the rolled-groove type fittings at the transaxle,
damage to the inner wall of the hose will occur. To
prevent prevent potential leakage, the cool

Page 1217 of 2399

CHRYSLER VOYAGER 2002  Service Manual INSTALLATION - ENGINE ASSEMBLY
(1) Position engine and transmission assembly
under vehicle and slowly lower the vehicle over the
engine and transmission.
(2) Align engine and transmission mounts to
at

Page 1229 of 2399

CHRYSLER VOYAGER 2002  Service Manual (19) Install air inlet tube and housing.
(20) Connect all vacuum lines, electrical wiring,
ground straps and fuel line.
(21) Fill cooling system. (Refer to 7 - COOLING -
STANDARD PROCEDURE)
(22) Conne