2002 CHRYSLER CARAVAN wiring

[x] Cancel search: wiring

Page 388 of 2399

CHRYSLER CARAVAN 2002  Service Manual CONVENTIONAL BATTERY CHARGING TIME TABLE
Charging
Amperage5 Amps10
Amps20 Amps
Open Circuit
VoltageHours Charging @ 21É C (70É
F)
12.25 to 12.49 6 hours 3 hours 1.5
hours
12.00 to 12.24 10 hours 5 h

Page 389 of 2399

CHRYSLER CARAVAN 2002  Service Manual between the disconnected battery negative cable ter-
minal clamp and the battery negative terminal post.
Make sure that the doors remain closed so that the
illuminated entry system is not activated. T

Page 391 of 2399

CHRYSLER CARAVAN 2002  Service Manual (1) Turn the ignition switch to the Off position. Be
certain that all electrical accessories are turned off.
(2) Remove the nut with washer that secures the
battery hold down bracket to the battery tr

Page 393 of 2399

CHRYSLER CARAVAN 2002  Service Manual (4) Connect the voltmeter to measure between the
battery negative cable terminal clamp and a good
clean ground on the engine block (Fig. 16). Rotate
and hold the ignition switch in the Start position.

Page 396 of 2399

CHRYSLER CARAVAN 2002  Service Manual CHARGING
TABLE OF CONTENTS
page page
CHARGING
DESCRIPTION - CHARGING SYSTEM.......21
OPERATION - CHARGING SYSTEM.........21
DIAGNOSIS AND TESTING - ON-BOARD
DIAGNOSTIC SYSTEM.................22
SPECIF

Page 399 of 2399

CHRYSLER CARAVAN 2002  Service Manual BATTERY TEMPERATURE
SENSOR
DESCRIPTION
The PCM incorporates a Battery Temperature Sen-
sor (BTS) on its circuit board.
OPERATION
The PCM uses the temperature of the battery area
to control the charge

Page 400 of 2399

CHRYSLER CARAVAN 2002  Service Manual INSTALLATION
INSTALLATION - 2.4L
(1) Install the generator.
(2) Install the accessory drive belt, refer to the
Cooling System section for proper procedures.
(3) Connect B+ terminal to generator.
(4) I

Page 403 of 2399

CHRYSLER CARAVAN 2002  Service Manual STARTING
TABLE OF CONTENTS
page page
STARTING
DESCRIPTION.........................28
OPERATION...........................28
DIAGNOSIS AND TESTING
DIAGNOSIS AND TESTING - STARTING
SYSTEM TEST..........