Page 172 of 626
3 - 15
INSP
ADJ
ENGINE OIL REPLACEMENT
5. Start the engine and let it warm up for
several minutes.
CAUTION:
When the oil tank is empty, never start the
engine.
6. Idle the engine more than 10 seconds
while keeping the motorcycle upright.
Then stop the engine and add the oil to
the maximum level.
7. Install:
lOil tank cap
ENGINE OIL REPLACEMENT
1. Start the engine and let it warm up for
several minutes.
2. Stop the engine and place an oil pan
under the drain bolt.
3. Remove:
lOil filler plug 1
lDrain bolt (with gasket) 2
lDrain bolt (with gasket) 3
lOil filter drain bolt (O-ring) 4
Drain the crankcase and oil tank
(frame) of its oil.
4. Remove:
lEngine skidplate
lEngine oil hose clamp 1
lBolt (engine oil hose) 2
lEngine oil hose 3
lOil strainer (frame) 4
5. Clean:
lOil strainer (frame)
Page 174 of 626

3 - 16
INSP
ADJ
ENGINE OIL REPLACEMENT
6. If the oil filter is to be replaced during this
oil change, remove the following parts
and reinstall them.
7. Install:
lPlain washer 1
lOil strainer (frame) 2
lEngine oil hose 3
lBolt (engine oil hose) 4
lEngine oil hose clamp 5
lEngine skid plate
8. Install:
lGaskets
lOil filter drain bolt
lDrain bolt (crankcase)
lDrain bolt (frame)
9. Fill:
lOil tank (frame)
10. Install:
lOil filler plug
11. Inspect:
lEngine (for oil leaks)
lOil level
Refer to “ENGINE OIL LEVEL INSPEC-
TION”. Replacement steps:
lRemove the exhaust pipe.
lRemove the oil filter cover 1 and oil filter
element 2.
lCheck the O-rings 3, if cracked or dam-
aged, replace them with a new one.
lInstall the oil filter element and oil filter
cover.
T R..
Oil filter cover:
10 Nm (1.0 m • kg, 7.2 ft • lb)
Oil quantity:
Total amount:
1.7 L (1.50 Imp qt, 1.80 US qt)
Periodic oil change:
1.5 L (1.32 Imp qt, 1.59 US qt)
With oil filter replacement:
1.6 L (1.41 Imp qt, 1.69 US qt)
New
T R..90 Nm (9.0 m · kg, 65 ft · lb)
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
T R..2 Nm (0.2 m · kg, 1.4 ft · lb)
New
T R..10 Nm (1.0 m · kg, 7.2 ft · lb)
T R..20 Nm (2.0 m · kg, 14 ft · lb)
T R..23 Nm (2.3 m · kg, 17 ft · lb)
Page 176 of 626

3 - 17
INSP
ADJ
PILOT SCREW ADJUSTMENT
12. Check:
lOil pressure
Checking steps:
lSlightly loosen the oil gallery bolt 1.
lStart the engine and keep it idling until oil
starts to seep from the oil gallery bolt. If no
oil comes out after one minute, turn the
engine off so it will not seize.
lCheck oil passages, oil filter and oil pump
for damage or leakage.
lStart the engine after solving the prob-
lem(s) and recheck the oil pressure.
lTighten the oil gallery bolt to specification.
T R..
Oil gallery bolt:
18 Nm (1.8 m • kg, 13 ft • lb)
PILOT SCREW ADJUSTMENT
1. Adjust:
lPilot screw 1
Adjusting steps:
NOTE:
To optimize the fuel flow at a smaller throttle
opening, each machine’s pilot screw has
been individually set at the factory. Before
adjusting the pilot screw, turn it in fully and
count the number of turns. Record this num-
ber as the factory-set number of turns out.
lTurn in the pilot screw until it is lightly
seated.
lTurn out the pilot screw by the factory-set
number of turns.
Pilot screw:
1-1/4 turns out (example)
Page 178 of 626

3 - 18
INSP
ADJIDLE SPEED ADJUSTMENT/
VALVE CLEARANCE ADJUSTMENT
EC35M021
IDLE SPEED ADJUSTMENT
1. Start the engine and thoroughly warm it
up.
2. Adjust:
lIdle speed
Adjustment steps:
lAdjust the pilot screw.
Refer to “PILOT SCREW ADJUSTMENT”
section.
lTurn the throttle stop screw 1 until the
engine runs at the lowest possible speed.
To increase idle speed ®
Turn the throttle stop screw 1 in a.
To decrease idle speed ®
Turn the throttle stop screw 1 out b.
Engine idling speed:
1,700 ~ 1,900 r/min
VALVE CLEARANCE ADJUSTMENT
NOTE:
lThe valve clearance should be adjusted
when the engine is cool to the touch.
lThe piston must be at Top Dead Center
(T.D.C.) on compression stroke to check or
adjust the valve clearance.
1. Remove:
lSeat
lFuel tank
Refer to “SEAT, FUEL TANK AND SIDE
COVERS” section in the CHAPTER 4.
2. Remove:
lCarburetor
Refer to “CARBURETOR” section in
the CHAPTER 4.
lSpark plug cap
lEngine stay (upper)
lCylinder head cover
Refer to “CAMSHAFTS” section in the
CHAPTER 4.
3. Remove:
lTiming plug 1
lStraight plug 2
lO-ring
Page 184 of 626

3 - 21
INSP
ADJ
VALVE CLEARANCE ADJUSTMENT
l
Round off the last digit of the installed pad
number to the nearest increment.
Last digit of pad
numberRounded value
0 or 2 0
5(NOT ROUNDED
OFF)
810
EXAMPLE:
Installed pad number = 148
Rounded off value = 150
NOTE:
Pads can only be selected in 0.05 mm incre-
ments.
l
Locate the rounded-off value and the
measured valve clearance in the chart
“PAD SELECTION TABLE”. The field
where these two coordinates intersect
shows the new pad number to use.
NOTE:
Use the new pad number only as a guide
when verifying the valve clearance adjust-
ment.
l
Install the new pads
0
and the valve lift-
ers
A
.
NOTE:
l
Apply the engine oil on the valve lifters.
l
Apply the molybdenum disulfide oil on the
valve stem ends.
l
Valve lifter must turn smoothly when
rotated with a finger.
l
Be careful to reinstall valve lifters and
pads in their original place.
l
Install the decompression shaft
B
, plain
washer
C
, bolt
D
, guide
E
, bolt
F
and
decompression cable
G
.
NOTE:
Apply the engine oil on the decompression
shaft.
T R..
Bolt (decompression shaft):
7 Nm (0.7 m • kg, 5.1 ft • lb)
Bolt (guide):
10 Nm (1.0 m • kg, 7.2 ft • lb)
Page 208 of 626
3 - 32
INSP
ADJ
DRIVE CHAIN SLACK ADJUSTMENT
5. Install:
lDrive chain 1
lJoint 2
lMaster link clip 3
CAUTION:
Be sure to install the master link clip to the
direction as shown.
aTurning direction
6. Lubricate:
lDrive chain
Drive chain lubricant:
SAE 10W-30 motor oil or suit-
able chain lubricants
New
EC36A060
DRIVE CHAIN SLACK ADJUSTMENT
1. Elevate the rear wheel by placing the
suitable stand under the engine.
2. Check:
lDrive chain slack a
Above the seal guard installation bolt.
Out of specification ® Adjust.
NOTE:
Before checking and/or adjusting, rotate the
rear wheel through several revolutions and
check the slack several times to find the tight-
est point. Check and/or adjust chain slack with
rear wheel in this “tight chain” position.
Drive chain slack:
40 ~ 50 mm (1.6 ~ 2.0 in)
Page 210 of 626
3 - 33
INSP
ADJ
FRONT FORK INSPECTION
3. Adjust:
lDrive chain slack
Drive chain slack adjustment steps:
lLoosen the axle nut 1 and locknuts 2.
lAdjust chain slack by turning the adjusters
3.
To tighten ® Turn adjuster 3 counter-
clockwise.
To loosen ® Turn adjuster 3 clockwise
and push wheel forward.
lTurn each adjuster exactly the same
amount to maintain correct axle alignment.
(There are marks a on each side of chain
puller alignment.)
NOTE:
Turn the adjuster so that the chain is in line
with the sprocket, as viewed from the rear.
CAUTION:
Too small chain slack will overload the
engine and other vital parts; keep the
slack within the specified limits.
lTighten the axle nut while pushing down
the drive chain.
T R..
Axle nut:
125 Nm (12.5 m • kg, 90 ft • lb)
lTighten the locknuts.
EC36C000
FRONT FORK INSPECTION
1. Inspect:
lFront fork smooth action
Operate the front brake and stroke the
front fork.
Unsmooth action/oil leakage ® Repair
or replace.
Page 218 of 626
3 - 37
INSP
ADJREAR SHOCK ABSORBER SPRING PRELOAD
ADJUSTMENT
EC36M013
REAR SHOCK ABSORBER SPRING
PRELOAD ADJUSTMENT
1. Elevate the rear wheel by placing the
suitable stand under the engine.
2. Remove:
lRear frame
3. Loosen:
lLocknut 1
4. Adjust:
lSpring preload
By turning the adjuster 2.
* For EUROPE
NOTE:
lBe sure to remove all dirt and mud from
around the locknut and adjuster before
adjustment.
lThe length of the spring (installed) changes
1.5 mm (0.06 in) per turn of the adjuster.
CAUTION:
Never attempt to turn the adjuster beyond
the maximum or minimum setting.
5. Tighten:
lLocknut
6. Install:
lRear frame Stiffer ®Increase the spring preload.
(Turn the adjuster 2 in.)
Softer ®Decrease the spring preload.
(Turn the adjuster 2 out.)
Spring length (installed) a:
Standard lengthExtent of adjustment
248 mm (9.76 in)
*262 mm (10.31 in)247 ~ 265 mm
(9.72 ~ 10.43 in)
*257 ~ 275 mm
(10.12 ~ 10.83 in)
T R..29 Nm (2.9 m · kg, 21 ft · lb)