2001 SUZUKI GRAND VITARA battery

[x] Cancel search: battery

Page 313 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 6A2-26 ENGINE MECHANICAL (H27 ENGINE)
Unit Repair Overhaul
Engine Assembly
REMOVAL
1) Release fuel pressure in fuel feed line. Refer to “FUEL
PRESSURE RELIEF PROCEDURE” in Section 6.
2) Disconnect

Page 329 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 6C-2 ENGINE FUEL
On-Vehicle Service
Fuel Tank
REMOVAL
1) Relieve fuel pressure in fuel feed line referring to Section 6
or Section 6-1.
2) Disconnect negative (–) cable at battery.
3) Before disconn

Page 331 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 6C-4 ENGINE FUEL
INSTALLATION
1) Install fuel pump assembly, fuel cut valve and vapor control
valve to fuel tank. Refer to “FUEL PUMP” in this section.
2) Connect fuel hoses to fuel tank, fuel cut

Page 334 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE) 6E2-1
6E2
SECTION 6E2
ENGINE AND EMISSION CONTROL SYSTEM
(SEQUENTIAL MULTIPORT FUEL INJECTION
FOR H27 ENGINE)
CO

Page 338 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE) 6E2-5
1. Air cleaner 22. Fuel level sensor 39. A/C controller (if equipped)
2. Intake air temp. sensor  23. Moni

Page 349 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 6E2-16 ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE)
[Not using SUZUKI scan tool] (vehicle with monitor 
connector)
1) Disconnect scan tool from DLC if connec

Page 351 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual 6E2-18 ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE)
Air Intake System
Throttle body
REMOVAL
1) Disconnect negative (–) cable at battery.
2) Drain cooling s

Page 354 of 656

SUZUKI GRAND VITARA 2001 2.G Owners Manual ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE) 6E2-21
14) Install strut tower bar (1) and tighten bolts.
15) Refill cooling system.
16) Connect negative (–)