Page 123 of 656

5C-6 PARKING AND REAR BRAKE
4) Tighten brake back plate nuts to specified torque.
Tightening torque
Brake back plate nut (a) :
50 N·m (5.0 kg-m, 36.5 lb-ft)
5) Install wheel cylinder, and tighten wheel cylinder bolts and
brake pipe flare nut (or nuts) to specified torque.
Tightening torque
Wheel cylinder bolt :
13.5 N·m (1.35 kg-m, 10.0 lb-ft)
Brake pipe flare nut : 16 N·m (1.6 kg-m, 12.0 lb-ft)
6) Install parking brake cable (3) to brake back plate (1) and
tighten parking brake cable nut (2) to specified torque.
Tightening torque
Parking brake cable nut (a) : 10 N·m (10 kg-m, 7.5 lb-ft)
7) Install brake shoes, referring to steps 1) to 4) of “INSTALLA-
TION” under “BRAKE SHOE” in this section.
8) Install brake drum. Refer to steps 1) to 2) of “INSTALLA-
TION” under “BRAKE DRUM” in this section.
9) Refill differential housing with new specified gear oil. Refer to
“ON-VEHICLE SERVICE” in Section 7F for refill.
10) Fill reservoir with brake fluid and bleed brake system. (For
bleeding operation, refer to “BLEEDING BRAKE” in Section
5).
11) Install wheel and tighten wheel nuts to specified torque.
Tightening torque
Wheel nut (b) : 100 N·m (10.0 kg-m, 72.5 lb-ft)
12) Upon completion of all jobs, depress brake pedal with about
30 kg (66 lbs) load 3 to 10 times so as to obtain proper drum-
to shoe clearance.
Adjust parking brake cable. (For adjustment, refer to “PARK-
ING BRAKE CHECK AND ADJUSTMENT” in Section 5).
13) Tighten parking brake lever cover screws.
14) Check to ensure that brake drum is free from dragging and
proper braking is obtained. Then remove vehicle from hoist
and perform brake test (foot brake and parking brake).
15) Check each installed part for oil leakage.
(a)
Page 306 of 656

ENGINE MECHANICAL (H27 ENGINE) 6A2-19
5) Install cylinder head to block.
After applying oil to cylinder head bolts, tighten them gradu-
ally as follows.
a) Tighten all bolts to 53 N·m (5.3 kg-m, 38.5 lb-ft) according
to numerical order in the figure.
b) In the same manner as in a), tighten them to 84 N·m (8.4
kg-m, 61.0 lb-ft).
c) Loosen all bolts until tightening torque is reduced to 0 in
reverse order of tightening.
d) In the same manner as in a), tighten them to 53 N·m (5.3
kg-m, 38.5 lb-ft).
e) In the same manner as in a) again, tighten them to speci-
fied torque.
Tightening torque
Cylinder head bolt (a) : 105 N·m (10.5 kg-m, 76.0 lb-ft)
Cylinder head bolt (hex hole bolt) (b) :
11 N·m (1.1 kg-m, 7.5 lb-ft)
6) Install water outlet cap.
7) Check timing mark on crankshaft as shown in the figure.
8) Install valve lash adjuster, camshaft, CMP sensor and RH
bank 2nd timing chain.
Refer to “CAMSHAFT AND VALVE LASH ADJUSTER” and
“RH (NO.2) BANK 2ND TIMING CHAIN AND CHAIN TEN-
SIONER” in this section. For CMP sensor, refer to “CMP
SENSOR” in Section 6F2.
9) Install 1st timing chain.
Refer to “1ST TIMING CHAIN AND CHAIN TENSIONER” in
this section.
10) Install LH bank 2nd timing chain.
Refer to “LH (NO.1) BANK 2ND TIMING CHAIN AND CHAIN
TENSIONER” in this section.
11) Install timing chain cover.
Refer to “TIMING CHAIN COVER” in this section. NOTE:
Don’t forget to install (b) bolts as shown in the figure.
1. Hex hole bolt
2. Crankshaft pulley side
3. Flywheel side
[A] RH bank
[B] LH bank
1. Crank timing pulley key
2. Oil jet
Page 480 of 656
DIFFERENTIAL (FRONT) 7E-7
On-Vehicle Service
Differential Mountings
REMOVAL AND INSTALLATION
1) Lift up vehicle and turn steering wheel all way to the right.
2) Separate front mounting bracket R (2) from differential hous-
ing (3) by removing bolts (1) from its lower part.
3) Remove front mounting bracket R (2) by removing mounting
front bolt (4) from its upper part.
4) Remove front mounting bracket L (3) from differential hous-
ing (1) by removing upper and lower fastening bolts (2, 4).
5) Check conditions of each bush. If it is damaged or deterio-
rated, drive it out with special tools and press for replace-
ment.
Special tool
(A) : 09951-26010
(B) : 09951-16080
Page 491 of 656

7F-6 DIFFERENTIAL (REAR)
3) Install propeller shaft to joint flange aligning match marks
and torque flange nuts to specification. Apply thread lock
cement to thread part of bolt if reused.
“A” : Cement 99000-32110
Tightening torque
Propeller shaft flange nuts (a) :
60 N·m (6.0 kg-m, 43.5 lb-ft)
4) Install right and left rear axle shafts and drums.
(Refer to “REAR AXLE INSTALLATION” of Section 3E and
rear brake drum installation of Section 5.)
5) Install wheels.
6) Fill hypoid gear oil as specified and tighten plug to specifica-
tion.
7) Lower lift.
Unit Repair
Disassembling Unit
1) Hold differential assembly securely and put identification
marks on differential side bearing caps (6).
2) Take off differential side bearing lock plates (4) and differen-
tial side bearing caps (6) by removing their bolts and then
take out bearing adjusters (5), side bearing outer races and
drive bevel gear with differential case.
3) Remove drive bevel gear (hypoid gear), differential gears,
differential pinions and pinion shafts.
a) With aluminum plates (2) placed on vise first, grip differen-
tial case with it and remove drive bevel gear (hypoid gear)
(3) by removing its bolts (1).
1. Differential carrier
2. Drive bevel gear assembly
3. Differential case
A: Identification mark
1
3
2