Page 297 of 656

6A2-10 ENGINE MECHANICAL (H27 ENGINE)
4) Disconnect EGR pipe from right (No.2) bank exhaust mani-
fold if right side exhaust manifold is removed.
5) Remove oil level gauge guide (3) if left side exhaust manifold
is removed.
6) Detach P/S pump assembly as following, if left side exhaust
manifold is removed.
a) Loosen P/S pump drive belt by loosening tensioner bolt.
b) Remove P/S pump mounting bolts.
c) Detach P/S pump assembly (4) with its hoses from cylinder
block.
7) Remove exhaust manifold covers (2) from exhaust manifolds
(1).
8) Hoist vehicle.
9) For 4WD vehicle, before disconnecting front propeller shaft,
put match mark (1) on joint flange and propeller shaft to facil-
itate their installation as shown in the figure.
10) For 4WD vehicle, disconnect propeller shaft from front differ-
ential.
11) Remove exhaust manifold stiffeners (1).
12) Remove stabilizer bar mounting bolt and pull down stabilizer
bar if right side exhaust manifold is removed.
13) Remove exhaust manifolds and their gaskets from cylinder
heads.
1
4
32
2. Exhaust No.1 pipe
A. Without WU-TWC
B. With WU-TWC
Page 298 of 656

ENGINE MECHANICAL (H27 ENGINE) 6A2-11
INSTALLATION
1) Install new manifold gaskets to cylinder heads and No.1 pipe
gasket to exhaust No.1 pipe.
2) Install exhaust manifolds.
•Always install new bolts with pre-coated adhesive to the
locations with ✱ mark.
•Tighten both manifold nuts and bolts to specified torque.
Tightening torque
Exhaust manifold bolt and nut (a) :
30 N·m (3.0 kg-m, 21.5 lb-ft)
3) Install stabilizer bar if it was removed. Refer to “STABILIZER
BAR / BUSHINGS” in Section 3D.
4) Install exhaust manifold stiffeners (if removed).
5) Install exhaust No.1 pipe (1).
Tighten exhaust No.1 pipe bolts to specified torque.
Tightening torque
Exhaust No.1 pipe bolt (b) :
50 N·m (5.0 kg-m, 36.5 lb-ft)
6) Tighten exhaust No.1 pipe nuts to specified torque.
Tightening torque
Exhaust No.1 pipe nut (b) :
50 N·m (5.0 kg-m, 36-5 lb-ft)
1. Left (No.1) exhaust manifold
2. Right (No.2) exhaust manifold
2. Exhaust No. 2 pipe
1. Exhaust No.1 pipe
2. Exhaust manifold
A. Without WU-TWC
B. With WU-TWC
Page 304 of 656
ENGINE MECHANICAL (H27 ENGINE) 6A2-17
Valves and Cylinder Heads
1. Cylinder block 6. Exhaust valve 11. Valve stem oil seal 16. Cylinder head bolt
(hex hole bolt)
2. RH bank cylinder head 7. Intake valve 12. Valve spring retainer Tightening Torque
3. LH bank cylinder head 8. Valve spring seat 13. Valve cotter Do not reuse
4. RH bank cylinder head gasket :
Carved lot number on cylinder head
gasket should face up (toward cylinder
head side).9. Outer valve spring :
Be sure to position spring in place with
its bottom end (small-pitch end) facing
the bottom (valve spring seat side).14. Valve guide Apply engine oil to
sliding surface of
each parts.
5. LH bank cylinder head gasket :
Carved lot number on cylinder head
gasket should face up (toward cylinder
head side).10. Inner valve spring :
Be sure to position spring in place with
its bottom end (small-pitch end) facing
the bottom (valve spring seat side).15. Cylinder head bolt
Page 305 of 656

6A2-18 ENGINE MECHANICAL (H27 ENGINE)
INSPECTION
Valve guides
Using a micrometer and bore gauge, take diameter readings on
valve stems and guides to check stem-to-guide clearance. Be
sure to take reading at more than one place along the length of
each stem and guide.
If clearance exceeds limit, replace valve and valve guide.
Valve stem-to-guide clearance :
INSTALLATION
1) Clean mating surface on cylinder head and cylinder block.
Remove oil, old gasket and dust from mating surface.
2) Install knock pin (4) to cylinder block.
3) Apply sealant “A” to cylinder head gasket (1) as shown in the
figure.
“A” : Sealant 99000-31150
Sealant amount (Width “w”) :
4 mm (0.158 in.)
4) Install new cylinder head gasket (1) to cylinder block as
shown in the figure. carved lot number (5) on cylinder head
gasket (1) should face up (toward cylinder head side).Standard Limit
Valve stem
diameterIntake 5.965 – 5.980 mm
(0.2348 – 0.2354 in.)–
Exhaust 5.940 – 5.955 mm
(0.2339 – 0.2344 in.)–
Valve guide
I.D.In & Ex 5.985 – 6.010 mm
(0.2356 – 0.2366 in.)–
Stem-to-guide
clearanceIntake 0.035 – 0.045 mm)
(0.0014 – 0.0018 in.)0.07 mm
(0.0027 in.)
Exhaust 0.060 – 0.070 mm
(0.0024 – 0.0028 in.)0.09 mm
(0.0035 in.)
[A] : RH ( No.2) bank
[B] : LH (No.1) bank
2. Crankshaft pulley side
3. Flywheel side
Page 330 of 656
ENGINE FUEL 6C-3
10) Disconnect fuel vapor hose and return hose from pipes.
11) Remove fuel tank protector (if equipped) from vehicle.
12) Lower fuel tank gradually while holding it horizontally and
pull out coupler at fuel pump.
INSPECTION
After removing fuel tank, check hoses and pipes connected to
fuel tank for leaks, loose connections, deterioration or damage.
Also check fuel pump and level gauge gaskets for leaks, visually
inspect fuel tank for leaks and damage.
Replace any damaged or malconditioned parts.
1. Fuel pump
2. Coupler
Page 353 of 656

6E2-20 ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE)
CLEANING
Clean throttle body bore and bypass air passages (1) by blowing
compressed air.
INSTALLATION
1) Clean mating surfaces and install throttle body gasket to
intake collector (1) with new gasket (2).
2) Install throttle body to intake collector and tighten bolts.
3) Connect PCV hose.
4) Install throttle body and intake collector to intake manifold
with new intake collector gaskets.
5) Install EGR pipe with new gaskets.
6) Connect breather hose and EVAP canister purge valve hose
and install PCV valve to cylinder head.
7) Connect connectors of EVAP canister purge valve, MAP
sensor and EGR valve.
Fix wire harness with clamps.
8) Install clamp bracket to intake collector.
9) Connect ground wire connector.
10) Connect connectors of TP sensor, ground and IAC valve.
11) Install surge tank pipe to intake manifold with new gaskets
and intake air pipe to throttle body. Install surge tank cover.
12) Connect engine coolant hoses to throttle body.
13) Connect accelerator cable and A/T throttle cable (A/T).CAUTION:
Do not blow compressed air through bypass air pas-
sage with IAC valve installed to throttle body. This will
cause IAC valve to malfunction.
TP sensor, idle air control valve or other components
containing rubber must not be places in a solvent or
cleaner bath.
A chemical reaction will cause these parts to swell,
harden or get distorted.
Page 363 of 656
6E2-30 ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE)
5) Install fuel connect pipe (1) and tighten union bolts to speci-
fied torque with new gaskets (3).
Tightening torque
Fuel connect pipe union bolt
(b) : 30 N·m (3.0 kg-m, 22.0 lb-ft)
6) Install fuel feed pipe (2) and tighten union bolt to specified
torque with new gaskets.
Tightening torque
Fuel feed pipe union bolt
(a) : 30 N·m (3.0 kg-m, 22.0 lb-ft)
7) Connect vacuum hose (5) and fuel return hose (4) to fuel
pressure regulator.
8) Connect fuel feed hose (1) and fuel return hose (2).
9) Connect connectors of injector wire (3) to injectors.
10) Install throttle body and intake collector, refer to “THROTTLE
BODY” in this section.
11) With engine “OFF” and ignition switch “ON”, check for fuel
leaks around fuel line connection.
Page 377 of 656

6E2-44 ENGINE AND EMISSION CONTROL SYSTEM (SEQUENTIAL MULTIPORT FUEL INJECTION FOR H27 ENGINE)
Emission Control System
EGR system (if equipped)
EGR SYSTEM INSPECTION (USING SUZUKI SCAN TOOL)
1) Connect SUZUKI scan tool to data link connector (DLC) (1)
with ignition switch OFF.
Special tool
(A) : SUZUKI scan tool
2) Start engine and warm up it to normal operating tempera-
ture.
3) With engine idling (without depressing accelerator pedal),
open EGR valve by using “MISC. TEST” mode.
In this state, according as EGR valve opening increases
engine idle speed drops. If not, possible cause is clogged
EGR gas passage, stuck or faulty EGR valve.
REMOVAL
1) Disconnect negative (–) cable at battery.
2) Disconnect EGR valve coupler.
3) Remove wire harness bracket from intake collector.
4) Remove EGR valve (5) and gasket from intake collector.NOTE:
For operation procedure of cartridge, refer to its car-
tridge operator's manual.
1. SUZUKI scan tool display
2. EGR valve opening (0: Close, 100: Full Open)
1. EVAP canister purge valve 4. EGR pipe
2. EVAP canister purge valve hose 6. PCV hose
3. Breather hose