Page 1 of 50
21-1
Turbocharger system
Note:
Observe rules of cleanliness Page 21
-22
.
Charge air pressure control connection diagram
Page 21
-2 .
All hose connections are secured with hose
clamps:
parts catalog.
charge air pressure system must be free of
leaks.
Replace self-locking nuts.
Always replace gaskets.
Pa
ge 1 of 50 Turbochar
ger s
ystem
11/18/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.GE02.21.1
Page 5 of 50
- Replace valve and secure recirculation shut-off valve connections
using hose clamps.
Pa
ge 5 of 50 Turbochar
ger s
ystem
11/18/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.GE02.21.1
Page 31 of 50
21-23
Note:
Observe rules of cleanliness Page 21
-22
.
Charge air pressure control connection diagram
Page 21
-2 .
All hose connections are secured with hose
clamps that comply with factory specifications
parts catalog.
Charge air pressure system must be free of
leaks.
Always replace gaskets and self-locking nuts.
Pa
ge 31 of 50 Turbochar
ger s
ystem
11/18/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.GE02.21.1
Page 48 of 50
21-35
Charge air cooler components, removing
and installing
Note:
All hose connections are secured with hose
clamps parts catalog. charge air pressure system must be free of
leaks.
1 -
Air duct
2 -
Grommet
3 -
Hose
Between charge air cooler and air guide in
cowl
4 -
Hose Between intake manifold and charge air
cooler
Pa
ge 48 of 50 Turbochar
ger s
ystem
11/18/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.GE02.21.1