21-37
      
Charge air cooler, removing and 
installing
 
     
Lock carrier in service position   Page 13
-
1 . 
     
Removing  
     
-  Remove upper air duct at charge air cooler.
    
Installing  
Installation is the reverse of removal.  -  Remove noise insulation panel (arrows).
-  Disconnect air guide at charge air cooler.
-  Remove lower air duct at charge air cooler.
-  Remove charge air cooler from below.
Pa
ge 50 of 50 Turbochar
ger s
ystem
11/18/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.GE02.21.1