1999 HONDA CR-V Rack

[x] Cancel search: Rack

Page 775 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Transmission
1.
lnstallation
Flush the ATF cooler as described on page 14-264
and 14-265.
Install the torque converter assembly on the main-
shaft with a new O-ring.
lnstall the starter on the transm

Page 776 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Transmission
Installation (contdl
8. Install the transmission housing mounting bolts.
TRANSMISSION HOUSING MOUNTING BOLTS12 x 1.25 mm54 N.m 16,5 kgf.m, a7 lbtftl
9. Remove the transmission jack.
10.

Page 779 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
26. Connect the vehicle speed sensor (VSS). the coun-
tershaft speed sensor. and the A,/T gear position
switch connectors,
VEHICLE SPEEO
SPEED SENSOACO{NECTOR
Connect the lock-up control solenoid va

Page 780 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Transmission
Cooler Flushing
@@ To prevent in;ury to face and eyos, atwayswear safety glasses ot a face shield when using thetlansmission flusher.
This procedure should be performed before reinstalli

Page 784 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Shift Lever
Disassembly/Reassembly -97 - 98 Models
SRS components are located in this area. Review the SRS component locations. precautions. and procedures in the SRS
section (24) before performing

Page 785 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Disassembly/Reassembly -99 - 00 Models
SRS components are located in this area. Review the SRS component locations, precautions, and procedures in the SRS
section (24) before performing repairs or s

Page 786 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Shift Lever
Over-Drive (O/Dl Switch Wire Clearance Adjustment -99 - 00 Models
NOTE: Be sure to adjust the clearance between the O/D
switch wires and the shift lever control bracket after
replacing t

Page 787 of 1395

HONDA CR-V 1999 RD1-RD3 / 1.G Workshop Manual 
Detent Spring Replacement
1.Install the detent spring on th€ shift lever control
bracket, and installthe screw loosely.
Shift the shift lever to E position.
lnssrt a 0.5 mm (0.02 in) wire gap gauge