1999 DODGE RAM reset

[x] Cancel search: reset

Page 250 of 1691

DODGE RAM 1999  Service Repair Manual replace PCM and see INACTIVE DTC CONDITION under SELF-DIAGNOSTIC
SYSTEM. Testing is complete.
         DTC P0783: 3-4 SHIFT SOL, NO RPM DROP @ 3-4 SHIFT
          Circuit Description
         Circuit

Page 253 of 1691

DODGE RAM 1999  Service Repair Manual If engine stalls, go to next step. If engine does not stall, go to
step 19).
         17) Using scan tool, select GOV and 3-4 SHIFT VALVE SYSTEM
TEST. Select 4th gear. If engine stalls, go to next ste

Page 255 of 1691

DODGE RAM 1999  Service Repair Manual as necessary. If connector and terminals are okay, turn ignition on.
Measure voltage between ground and 5-volt supply circuit at
transmission solenoid harness connector. If voltage is 4.5 volts or
les

Page 257 of 1691

DODGE RAM 1999  Service Repair Manual predetermined conditions. Possible causes are: faulty governor
pressure sensor, shorted or open 5-volt supply circuit or faulty PCM.
Testing is complete.
         6) While monitoring GOV PRESSURE sens

Page 264 of 1691

DODGE RAM 1999  Service Repair Manual          19) Turn ignition on. Using scan tool, read governor pressure
sensor voltage. If voltage is 4.65 volts or less, replace PCM. If
resistance is greater than 4.65 volts, go to next step.

Page 265 of 1691

DODGE RAM 1999  Service Repair Manual and PCM. Ensure scan tool is still actuating transmission control
relay. If transmission control relay stops clicking, repair wiring
harness as necessary. If transmission control relay continues
click

Page 267 of 1691

DODGE RAM 1999  Service Repair Manual          6) Disconnect PNP switch harness connector. Measure
resistance of PNP switch sense circuit between Black PCM harness
connector C1 and PNP switch harness connector. If resistance is less
than

Page 268 of 1691

DODGE RAM 1999  Service Repair Manual          5) If PCM has not been replaced, and TEST VER-2A is being
performed after an A/C relay control circuit DTC test, ensure A/C is
on and go to next step.
         6) Road test vehicle for at lea