Page 214 of 1002

Downloaded from www.Manualslib.com manuals search engine
I Cylinder Head and Valvetrain
- Remove adjustable primary timing chain tensioner tool and
reinstall primary chain tensioner cylinder to cylinder head.
Tightening torque
Primary chain tensioner cylinder
to 70 Nm (52 ft-lb)
cylinder head
- Remove flywheel locking tool from crankcase. Replace spe-
cial tool bore sealing plug.
- Remove camshaft locking tools from cylinder head
Install intake camshaft cover and cylinder head cover.
Check for correct seating of half-moon seals (A) in back of
cylinder head cover.
Use a small amount of Three Bond
8 1209 or equivalent
sealing compound at corners
(B) of half-moon cutouts.
Seat gasket and seal corners at VANOS unit with Three
Bond
@ 1209.
Tightening torque Cylinder head cover to cylinder head
(M6) 10 Nm (89 in-lb)
- Installation of the remaininq parts is reverse or removal, not- -
ing the following:
Change engine
011 and f~lter as descr~bed in 020 Mainte-
nance.
Reconnect battery.
To prevent damaging the engine electronic systems, install
all ground wire previously removed, including the ground
wires for the ignition coils.
Tightening torque
-
Radiator cooling fan to coolant pump 40 Nm
(30 ft-ib)
Spark plug to cylinder head
25 Nm (18 ft-ib)
Page 243 of 1002

Downloaded from www.Manualslib.com manuals search engine
Camshaff Timing Chain
NOTE-
Mark direction of belt rotation if reusing belt.
- Remove vibration damper mounting bolts and remove vibra-
tion damper and pulley from hub.
NOTE- The M52
6-cylinder engine uses a 2-piece vibration damper
and hub assembly.
4 Install crankshaft holder (BMW special tools 11 2 150
and11 2410).
NOTE
-
Be careful while aligning locator pin hole in special tool 11 2
410 with vibration damper locatorpin.
- While counterholding crankshaft, loosen and remove crank-
shaft center bolt.
CAUTION-
Do not use flywheel locking tool to hold crankshaft stationary
to loosen or tighten crankshaft hub center bolt Use only the
special tools specified, or equivalent hub holding tool.
NOTE- The cranlshaft hub center bolt is torqued to 4
10 Nm
(300
ft-16).
- Remove damper hub and special tools.
4 Install cap (BMW special tool 11 2 383) on end of cranltshaft.
4 Install seal guide (BMW special tool 11 2 385) over end of
crankshaft. Be sure to align tool with keyway on crankshaft
(arrow).
Page 245 of 1002

Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing Chain
lnstall vibration damper mounting bolts. Note hub locating
dowel (arrow).
Tightening torque
Vibration damper to crankshaft hub
(ME) 22 Nm (16 ft-lb)
- Installation is reverse of removal noting the following:
Installing drive belts. See 020 Maintenance.
Install cooling fan. See 170 Radiator and Cooling Sys-
tem.
Crankshaft oil seal, replacing
(M52 TU and M54 engines)
The crankshafl front seal IS located in the lower timing cover,
behind the
vibrat~on damper.
- Disconnect negative (-) cable from battery.
Disconnecting the battery may erase fault
code(s) storedin
control module memoy Checlc for fault codes using spe-
cial
BMW diagnostic equipment.
Prior to disconnecting the battery, read the battery dis-
connection cautions given in
001 General Cautions
and Warnings.
- Remove splash guard from beneath engine
- Remove engine cooling fan assembly. See 170 Radiator
and Cooling System.
NOTE- Cooling fan nut
(32 mm wrench) has left-hand threads.
- Remove drive belts. See 020 Maintenance
NOTE-
Mark direction of belt rotation if reusing belt.
- Install crankshaft holding tool (BMW special tool 11 8 19011 1
8 200). Make sure tool locks into place in openings in damper
assembly. While counterholding crankshafl with special tool,
remove crankshaft center bolt.
CAUTIOI\C
Do not use flywheel locling tool to hold crankshaft station-
ary to loosen or tighten
cranl(shaft hub center bolt. Use
only the special tools specified, or equivalent hub holding
tool.
Use care when removing
damper/hub assembly, as ~t is
easy to damage the radiator
Page 261 of 1002
Downloaded from www.Manualslib.com manuals search engine
-
Camshaft Timing Chain -. -
Measure gap (B) between secondary timing chain tensioner
and intake camshaft sensor wheel. Make note of distance.
To determine VANOS control travel:
Distance
I3 - distance A = a minimum of 8.5 mm
CAUTION-
If the adjustment travel is less than 8.5 mm the VANOS ad-
justment unit must be removed and readjusted. See
VANOS
control unit, removing (M52 engine)
and VANOS con-
trol unit, installing
(M52 engine).
Remove special tools:
Cranltshaft locking tool.
Camshaft
loclting tool set.
Air fitting.
* VANOS cable adaptor.
- Install VANOS oil line with new seal
- Install oil baffle cover above intake camshaft.
- Install cylinder head cover mounting studs to rear of head.
- Install cylinder head cover,
Tightening
torques
Cylinder head cover 10 Nrn (89 in-lb)
VANOS oil line
32 Nm (24 R-lb)
VANOS solenoid to control unit 30 Nrn (22 ft-lb)
- Installation of remaining parts is reverse of removal.
Page 263 of 1002

Downloaded from www.Manualslib.com manuals search engine
4 With crankshaft at TDC position, remove vibration damper
bolts (arrows) and remove vibration damper.
< Mount crankshaft holding tool (BMW special tool 11 2 150
and
11 2 410) to crankshaft hub. Counter hold crankshaft and
loosen crankshaft hub retaining bolt.
Crankshaft hub retaining bolt is torqued to
410 Nm (300 ft-lb).
Do not use flywheel
locliing tool to hold cranl(shait stationary
to loosen or tighten crankshaft hub center bolt. Use only the
special tools specified, or equivalent hub holding tool.
- Remove crankshaft hub.
- Remove cylinder cover mounting fasteners and remove cyl-
inder head cover.
NOTE-
The cylinder head cover mounting bolt insulators and gas-
lets should be reinstalled in their original positions. Make
note of their arrangement during removal.
- Drain engine oil, remove oil pan. See 119 Lubrication Sys-
tem.
Remove primary timing chain tensioner (arrow).
CAUTION-
Timing chain tensioner is under spring tension. I
- Remove VANOS control unit. See VANOS control unit, re-
moving
(M52 engine).
- Remove fasteners from intake and exhaust camshaft
sprocket.
Page 268 of 1002

Downloaded from www.Manualslib.com manuals search engine
-- -
Chain 1
- Install cylinder identification trigger plate to front of intake
camshaft.
- Install spacer to front of intake camshaft
- Install secondary chain sprockets and chain as an assembly
so that arrows on sprockets are pointing up. Center mounting
holes in sprockets to bolt holes in camshafts.
4 lnstall thrust washers and spring plate to intake cam
sprocket.
Tighten intake camshaft sprocket nuts.
- Install VANOS control unit, see VANOS control unit, install-
ing
(M52 engine).
Tightening torque
Intake camshaft sprocket nuts to studs
(ME) 1011 Nm (8919 In-lb) 502117068
- Unlock and release secondary chain tensioner,
4 Preload primary timing chain by torquing adjustable primary
chain tensioner (BMW special tool
11 4 220) to 1.3 Nm
(11 in-lb).
- Tighten exhaust camshaft sprocket bolts in two stage
Tightening torque Exhaust camshaft sprocket bolls (M7)
Stage 1
5 Nrn (44 in-lb)
Stage
2 22 Nm (17 ft-lb)
- Remove crankshaft locking tool and camshaft locking tools.
< Align hub with keyway and tap into place. Insert new center
bolt with washer shoulder (arrow) facing hub.
CAUTION-
Inspect woodruff ley for damage before installing hub.
- Attach crankshaft holding tool (BMW special tools 11 2
15011 1 2 410) to hub. Counterhold hub with tool while tight-
ening center bolt.
CAUTION-
Do not use flywheel locling tool to hold crankshaft stationary
to loosen or tighten
cranlshaft hub center bolt. Use only the
special tools specified, or equivalent hub holding tool.
Page 283 of 1002
Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain]
4 Pull out exhaust camshaft splined shaft to stop.
- Make sure camshafts are secured in TDC position using
BMW soecial tools 11 3 240 and 11 3 244.
4 Preload primary chain tensioning rail:
Tighten adjusting screw on
BMW special tool 11 4 220.
Tightening torque
Primary chain tensioner preload
0.7 Nm (6 in-lb)
4 Preload exhaust camshaft spring plate by pressing on im-
pulse wheel. Tighten mounting nuts
(arrows) by hand. Do
not tighten fully.
Page 284 of 1002

Downloaded from www.Manualslib.com manuals search engine
-
I Camshaft Timing Chain - --
Install BMW special tool 11 6 150 (VANOS setup bracket) to
front of cylinder head timing case. Tighten nuts
(arrows) by
hand, and then tighten down uniformly until special tool is in
full contact with cylinder head.
CAUTION-
Male sure all gasket material is removed from face of cylin-
der head. Clean
sealins face and keep free of oil.
Secure camshaft impulse sprockets and wheels:
Pretighten Torx screws
(A) on exhaust camshaft impulse
wheel to approx.
5 Nm (44 in-lb).
Pretighten mounting nuts
(B) on exhaust and intake
sprocket assemblies to approx.
5 Nm (44 in-lb).
- Torque down Torx screws (A) and nuts (8) to flnal
specifications.
Tightening torques Sprocket assembly
to camshaft
initial torque
5 Nm (44 in-lb)
Sprocket assembly to camshaft
M7 Torx screw (A) 20 Nm (15 fl-lb)
ivl6 mounting nut (B) 10 tdm (89 in-lb)
- Remove flywheel locking tool from transmission bellhousing
so that crankshaft is no longer locked.
- Remove camshaft locking tools from rear of cylinder head.
- Crank engine over twice by hand in direction of rotation until
cylinder
1 intake and exhaust camshaft lobes face each other - again.
- Secure crankshaft with BMW special tool 11 2 300.
4 Place BMW special tool 11 3 240 over camshaft ends and
measure clearance of tool to cylinder head surface.
NOJE-
If the exhaust side of the tool (A) is not flush with the head,
camshaft timing
Is incorrect. Repeat camshaft timing pro-
cedure.
* Due to flexible sprocket design and VANOS control unit tol-
erances and play, the
intake side of special tool 11 3 240
(6) may be up to 1 mm (0.04 in) above the sudace of the
cylinder head. This is normal. Otherwise, repeat camshaft
timing procedure.