Page 690 of 1463

M161 ENGINE CONTROLS 1F2-41
Pin No.Abbreviation Description
Pedal potentiometer 1 ground
Pedal potentiometer 1 supply
Fuel pump relay
Tank purge valve
Engine fan
-
CAN-Low
CAN-High
-
-
-
-
-
Air conditioning
Electronic traction signal(ABD option only)
-
Pedal potentiometer 1 signal
Pedal potentiometer 2 signal
Brake light switch(Cruisel option only)
Pedal potentiometer 2 ground
Pedal potentiometer 2 supply
Cruise accelerate/Set(Cruisel option only)
Cruise resume(Cruisel option only)
Cruise decelerate/Set(Cruisel option only)
Cruise safety contact switch(Cruisel option only)
-
Cruise off switch(Cruisel option only)
Diagnostics(K-Line)
Vehicle speed signal
Engine speed signal31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60GND
SP1+5V
KP
TEV
ML
-
CAN L
CAN H
-
-
-
-
-
KLIMA
ETS
-
SP1S
SP2S
BLS
GND
SP2+2.5V
S+B
WA
S-B
KSK
-
AUS
DIAG
V-SIG
TN-SIGl
l
l
l
l
-
l
l
-
-
-
-
-
l
¡
-
l
l
¡
l
l
¡
¡
¡
¡
-
¡
l
l
ll
l
l
l
l
-
l
l
-
-
-
-
-
l
¡
-
l
l
¡
l
l
¡
¡
¡
¡
-
¡
l
l
l
E23 ENG,
4speed A/T E23 ENG,
5speed A/T
Page 1275 of 1463

SECTION 7B/C
MANUAL CONTROL /
SEMIAUTO TEMPERATURE CONTROL
HEATING, VENTILATION AND AIR
CONDITIONING SYSTEM
Caution: Disconnect the negative battery cable before removing or installing any electrical unit or when a
tool or equipment could easily come in contact with exposed electrical terminals. Disconnecting this cable
will help prevent personal injury and damage to the vehicle. The ignition must also be in LOCK unless otherwise
noted.
Specifications . . . . . . . . . . . . . . . . . . . . . . 7B/C-2
Cooling Capacity . . . . . . . . . . . . . . . . . . . . 7B/C-2
Compressor . . . . . . . . . . . . . . . . . . . . . . . . 7B/C-2
Condenser . . . . . . . . . . . . . . . . . . . . . . . . . 7B/C-2
Receiver Drier . . . . . . . . . . . . . . . . . . . . . . 7B/C-2
Dual Pressure Switch . . . . . . . . . . . . . . . . . 7B/C-2
Evaporator . . . . . . . . . . . . . . . . . . . . . . . . . 7B/C-3
Heater Unit . . . . . . . . . . . . . . . . . . . . . . . . . 7B/C-3
Fastener Tightening Specifications . . . . . . . 7B/C-3
Diagnosis . . . . . . . . . . . . . . . . . . . . . . . . . 7B/C-4
Defectives in Fan Motor Circuit . . . . . . . . . . 7B/C-5
Defectives in Compressor Circuit . . . . . . . . 7B/C-5
TABLE OF CONTENTS
Component Locator . . . . . . . . . . . . . . . . . 7B/C-6
Ventilation . . . . . . . . . . . . . . . . . . . . . . . . . . 7B/C-6
Air Conditioner System . . . . . . . . . . . . . . 7B/C-8
Diesel Engine . . . . . . . . . . . . . . . . . . . . . . . 7B/C-8
Gasoline Engine . . . . . . . . . . . . . . . . . . . . . 7B/C-9
Maintenance and Repair . . . . . . . . . . . . 7B/C-10
Refrigerant Charging . . . . . . . . . . . . . . . . 7B/C-10
Condenser . . . . . . . . . . . . . . . . . . . . . . . . 7B/C-14
Receiver Drier . . . . . . . . . . . . . . . . . . . . . 7B/C-18
Compressor . . . . . . . . . . . . . . . . . . . . . . . 7B/C-21
Heater and Air Conditioner Control Box . . 7B/C-25
Page 1286 of 1463

7B/C-12 MANUAL & SEMIAUTO-HVAC
Charging Refrigerant
1. Connect the manifold gauge to the charging valve and
evacuate the system.
2. Connect the center hose of the gauge to the refrigerant
tank.
3. Open the high pressure valve and charge the system with
350g of refrigerant.
4. Close the high pressure valve and start the engine and run
the compressor.
Notice
Never open the high pressure valve when the compressor
is running. Refrigerant gas will be charged reverse.
5. Slowly open the low pressure valve and charge the system
with refrigerant.
Standard650 - 750 g
6. Close the low pressure valve after charging.
Notice
Checking the pressure through the sight glass is impossible
by applying & R-134a.
7. Stop the engine and disconnect the manifold gauge from
the system.
Operation Check
1. Place a dry bulb thermometer to the front duct.
2. Place a psychrometer close to the inlet of the cooling unit
(under the glove box).
3. Run the engine at 1,500 rpm.
4. Set the blower switch at ‘HI’ and A/C switch ‘ON”.
5. Set the temperature control lever at ‘COOL’.
6. Set the air flow control at ‘REC’.
7. Check that air conditioning system is stabilized.
Temperature of Air Inlet
High Pressure Gauge Reading 25 - 35°C
13.2 - 18.5kg/cm
2