1998 NISSAN PATROL ignition

[x] Cancel search: ignition

Page 176 of 192

NISSAN PATROL 1998 Y61 / 5.G Engine Control Workshop Manual jA
CHECK INPUT SIGNAL CIRCUIT-I.
1. Turn ignition switch ``OFF.
2. Disconnect TCM harness connector.
3. Check harness continuity between TCM
terminal
V36and terminalsV7,V9.
Continuity should exist.

Page 179 of 192

NISSAN PATROL 1998 Y61 / 5.G Engine Control Workshop Manual DIAGNOSTIC PROCEDURE
INSPECTION START
CHECK OVERALL FUNCTION.
1. Start engine and let it idle.
2. Check voltage between ECM terminals
V24,V30,V37and ground with CON-
SULT or tester.
NG
cOK
INSPECTION

Page 180 of 192

NISSAN PATROL 1998 Y61 / 5.G Engine Control Workshop Manual Charge Air Cooler Fan Control
SYSTEM DESCRIPTION
Crankshaft position sensor (TDC)cEngine speed
ECM
cCharge air cooler fan relayCharge air temperature sensorcCharge air temperature
Ignition switch
cSta

Page 182 of 192

NISSAN PATROL 1998 Y61 / 5.G Engine Control Workshop Manual DIAGNOSTIC PROCEDURE
INSPECTION START
CHECK OVERALL FUNCTION.
1. Turn ignition switch ``OFF.
2. Disconnect charge air temperature sen-
sor harness connector.
3. Connect 150Wresistor to charge air
te

Page 185 of 192

NISSAN PATROL 1998 Y61 / 5.G Engine Control Workshop Manual Heat Up Switch
The heat up switch is located on the lower side of the instrument
panel. This switch is used to speed up the heaters operation when
the engine is cold.
When the ECM received the heat u

Page 187 of 192

NISSAN PATROL 1998 Y61 / 5.G Engine Control Workshop Manual DIAGNOSTIC PROCEDURE
INSPECTION START
CHECK OVERALL FUNCTION.
1. Turn ignition switch ``ON.
2. Check ``WARM UP SW signal
in ``DATA MONITOR mode with
CONSULT.
Heat up switch is ``ON: ON
Heat up
Page:   < prev 1-10 ... 49-56 57-64 65-72 73-80 81-88