KEY CYLINDER
REMOVAL
The ignition key must be in the key cylinder for
cylinder removal.
(1) Disconnect negative cable from battery.
(2) Remove upper and lower covers (shrouds) from
steering column.
(3) Place shifter in PARK position.
(4) A retaining pin (Fig. 12) is located at side of
key cylinder assembly.
(a) Rotate key to RUN position.
(b) Press in on retaining pin while pulling key
cylinder from ignition switch (Fig. 13).
INSTALLATION
The ignition key must be in the key cylinder for
cylinder installation.
(1) Install the key cylinder into the housing using
care to align the end of the key cylinder with the
ignition switch.
(2) Push the key cylinder in until it clicks.
(3) Replace the upper and lower shrouds.
(4) Reconnect the battery.
GEAR SHIFT LEVER
REMOVAL
(1) Remove the kneeblocker. (Refer to 23 - BODY/
INSTRUMENT PANEL/KNEE BLOCKER -
REMOVAL).
(2) Remove the upper and lower column shroud.
(3) Remove and discard the brake light switch.
(4) Loosen the column bolts and lower the column
enough to allow clearance for the gear shift lever
removal.
(5) Disconnect the overdrive switch harness (if
equipped).
(6) Disconnect the shift cable from the shift lever.
(7) Remove the SKIM.
(8) Remove the gear shift lever mounting screws
and remove the lever. (Fig. 14)
(9) Remove the blocker pin from the inhibit link
slot (Fig. 14).
INSTALLATION
(1) Install the lever assembly using care to install
the pin in the blocker to slider slot (Fig. 15) and
install the mounting screws and tighten to 12 N´m
(105 in. lbs.).
Fig. 12 KEY CYLINDER
1 - KEY
2 - KEY CYLINDER
3 - RETAINING PIN HOLE
Fig. 13 KEY CYLINDER
1 - KEY CYLINDER
2 - PUNCH
Fig. 14 GEAR SHIFT LEVER
1 - PARK INHIBIT BLOCKER SPRING
2 - GEAR SHIFT LEVER
19 - 12 COLUMNDR
(2) Cycle the key from ACC to RUN and ensure
that the blocker does not stick or bind.
(3) Turn the key to the OFF position and ensure
that the shifter will not pull from the PARK position.
(4) Connect the over drive switch harness (if
equipped).
NOTE: Route and tie off harness to original loca-
tion.
(5) Connect the shift cable to the lever.
(6) Ensure the gear shift lever and transmission
are in the PARK position and snap the cable adjust
clip in place.
(7) Install a new brake light switch (Refer to 8 -
ELECTRICAL/LAMPS/LIGHTING - EXTERIOR/
BRAKE LAMP SWITCH - INSTALLATION).
(8) Install the SKIM and halo.
(9) Install the upper and lower column shroud.
(10) Install the column back into place and
tighten.
(11) Install the kneeblocker. (Refer to 23 - BODY/
INSTRUMENT PANEL/KNEE BLOCKER - INSTAL-
LATION).
UPPER STEERING COUPLING
REMOVAL
(1) Disconnect the negative battery cable.
NOTE: The steering column on vehicles with an
automatic transmission may not be equipped with
an internal locking shaft that allows the ignition key
cylinder to be locked with the key. Alternative meth-
ods of locking the steering wheel for service will
have to be used.(2) Lock the steering wheel with the tire in the
straight position.
(3) Remove and discard the lower pinch bolt.
(4) Lower the steering coupler shaft from the col-
umn.
(5) Remove the upper steering coupling shaft seal
by pushing in the four tags securing it to the panel
(Fig. 16).
(6) Remove and discard the lower coupler pinch
bolt from the lower steering coupling shaft (Fig. 17).
(7) Remove the upper steering coupling shaft from
the vehicle (Fig. 17).
INSTALLATION
(1) Install the upper steering coupling shaft to the
vehicle (Fig. 17).
Fig. 15 GEAR SHIFT LEVER SPRING
1 - BLOCKER TO INHIBIT LINK SLOT
2 - GEAR SHIFT LEVER
Fig. 16 RELEASE TANGS
1 - RELEASE TANGS (4)
2 - UPPER STEERING COUPLER SHAFT
Fig. 17 UPPER STEERING COUPLER SHAFT
1 - LOWER STEERING COUPLER
2 - RELEASE TANGS (4)
3 - UPPER STEERING COUPLER SHAFT
DRCOLUMN 19 - 13
GEAR SHIFT LEVER (Continued)
(11) Remove and discard the oil filter seal from the
bottom of the oil pump.
(12) If replacing the cooler return filter, use Oil
Filter Wrench 8321 to remove the filter from the
transmission.
(13) Dispose of used trans fluid and filter(s) prop-
erly.
INSPECTION
Inspect bottom of pan and magnet for excessive
amounts of metal. A light coating of clutch material
on the bottom of the pan does not indicate a problem
unless accompanied by a slipping condition or shift
lag. If fluid and pan are contaminated with excessive
amounts of debris, refer to the diagnosis section of
this group.
CLEANING
(1) Using a suitable solvent, clean pan and mag-
net.
(2) Using a suitable gasket scraper, clean original
sealing material from surface of transmission case
and the transmission pan.
INSTALLATION
CAUTION: The primary oil filter seal MUST be fully
installed flush against the oil pump body. DO NOT
install the seal onto the filter neck and attempt to
install the filter and seal as an assembly. Damage to
the transmission will result.
(1) Install a new primary oil filter seal in the oil
pump inlet bore. Seat the seal in the bore with the
butt end of a hammer, or other suitable tool.(2) Place replacement filter in position on valve
body and into the oil pump.
(3) Install screw to hold filter to valve body (Fig.
67). Tighten screw to 4.5 N´m (40 in. lbs.) torque.
(4) Install new cooler return filter onto the trans-
mission, if necessary. Torque the filter to 14.12 N´m
(125 in.lbs.).
(5) Place bead of MopartRTV sealant onto the
transmission case sealing surface.
(6) Place pan in position on transmission.
(7) Install bolts to hold pan to transmission.
Tighten bolts to 11.8 N´m (105 in. lbs.) torque.
(8) Lower vehicle and fill transmission with
MopartATF +4.
STANDARD PROCEDURE - TRANSMISSION
FILL
To avoid overfilling transmission after a fluid
change or overhaul, perform the following procedure:
(1) Remove dipstick and insert clean funnel in
transmission fill tube.
(2) Add following initial quantity of MopartAT F
+4 to transmission:
(a) If only fluid and filter were changed, add10
pints (5 quarts)of ATF +4 to transmission.
(b) If transmission was completely overhauled
and the torque converter was replaced or drained,
add24 pints (12 quarts)of ATF +4 to transmis-
sion.
(3) Check the transmission fluid (Refer to 21 -
TRANSMISSION/AUTOMATIC - RFE/FLUID -
STANDARD PROCEDURE) and adjust as required.
GEARSHIFT CABLE
DIAGNOSIS AND TESTING - GEARSHIFT
CABLE
(1) Engine starts must be possible with shift lever
in PARK or NEUTRAL positions only. Engine starts
must not be possible in any other gear position.
(2) With the shift lever in the:
(a) PARK position - Apply upward force on the
shift arm and remove pressure. Engine starts must
be possible.
(b) PARK position - Apply downward force on
the shift arm and remove pressure. Engine starts
must be possible.
(c) NEUTRAL position - Normal position. Engine
starts must be possible.
(d) NEUTRAL position - Engine running and
brakes applied, apply upward force on the shift
arm. Transmission shall not be able to shift from
neutral to reverse.
Fig. 67 Transmission Filters - 4X4 Shown
1 - PRIMARY OIL FILTER
2 - COOLER RETURN FILTER
3 - COOLER RETURN FILTER BYPASS VALVE
4 - VALVE BODY
21 - 368 AUTOMATIC TRANSMISSION - 45RFE/545RFEDR
FLUID AND FILTER (Continued)
(8) Install the left a-pillar trim. (Refer to 23 -
BODY/INTERIOR/A-PILLAR TRIM - INSTALLA-
TION)
(9) Position the left end cap and seat the attach-
ment clips fully.
(10) Install the right side mounting bolts on the
a-pillar and one right mounting bolt on the cowl side
panel and tighten to 12 N´m (9 ft. lbs.).
(11) Install the right a-pillar trim panel. (Refer to
23 - BODY/INTERIOR/A-PILLAR TRIM - INSTAL-
LATION)
(12) Position the right end cap and seat the
attachment clips fully.
(13) Install the one HVAC mounting screw.
(14) Connect the radio antenna.
(15) Connect the two electrical connectors at the
right cowl panel.
(16) Install the right cowl trim cover. (Refer to 23 -
BODY/INTERIOR/COWL TRIM - INSTALLATION)
(17) Connect the air bag control module electrical
connector.
(18) Install the center bracket bolts and tighten to
12 N´m (9 ft. lbs.).
(19) Install the floor console, if equipped. (Refer to
23 - BODY/INTERIOR/FLOOR CONSOLE - INSTAL-
LATION)
(20) Install the air bag control module cover, if
equipped.
(21) Connect the park brake release handle actua-
tor rod.
(22) Install the hood release handle and tighten
the screws.
(23) Install the two bolts at the column support
bracket and tighten to 14 N´m (10 ft. lbs.).
(24) Install the steering column. (Refer to 19 -
STEERING/COLUMN - INSTALLATION)
(25) Connect the wire harness electrical connectors
above the brake pedal.
(26) Install the two top instrument panel bolts and
tighten to 12 N´m (9 ft. lbs.).
(27) Install the four top instrument panel screws.
(28) Install the instrument panel top cover. (Refer
to 23 - BODY/INSTRUMENT PANEL/INSTRUMENT
PANEL TOP COVER - INSTALLATION)
INSTRUMENT PANEL
HEADLAMP SWITCH BEZEL
REMOVAL
WARNING: ON VEHICLES EQUIPPED WITH AIR-
BAGS, DISABLE THE AIRBAG SYSTEM BEFORE
ATTEMPTING ANY STEERING WHEEL, STEERING
COLUMN, SEAT BELT TENSIONER, OR INSTRU-
MENT PANEL COMPONENT DIAGNOSIS OR SER-VICE. DISCONNECT AND ISOLATE THE BATTERY
NEGATIVE (GROUND) CABLE, THEN WAIT TWO
MINUTES FOR THE AIRBAG SYSTEM CAPACITOR
TO DISCHARGE BEFORE PERFORMING FURTHER
DIAGNOSIS OR SERVICE. THIS IS THE ONLY SURE
WAY TO DISABLE THE AIRBAG SYSTEM. FAILURE
TO TAKE THE PROPER PRECAUTIONS COULD
RESULT IN ACCIDENTAL AIRBAG DEPLOYMENT
AND POSSIBLE PERSONAL INJURY.
(1) Using a trim stick C-4755 or equivalent,
release the top clips on the steering column opening
cover and the lower drivers side bezel.
(2) Using a trim stick C-4755 or equivalent,
release the switch bezel. (Fig. 17)
(3) Disconnect the electrical connector and remove
the bezel.
INSTALLATION
WARNING: ON VEHICLES EQUIPPED WITH AIR-
BAGS, DISABLE THE AIRBAG SYSTEM BEFORE
ATTEMPTING ANY STEERING WHEEL, STEERING
COLUMN, SEAT BELT TENSIONER, OR INSTRU-
MENT PANEL COMPONENT DIAGNOSIS OR SER-
VICE. DISCONNECT AND ISOLATE THE BATTERY
NEGATIVE (GROUND) CABLE, THEN WAIT TWO
MINUTES FOR THE AIRBAG SYSTEM CAPACITOR
TO DISCHARGE BEFORE PERFORMING FURTHER
DIAGNOSIS OR SERVICE. THIS IS THE ONLY SURE
WAY TO DISABLE THE AIRBAG SYSTEM. FAILURE
TO TAKE THE PROPER PRECAUTIONS COULD
RESULT IN ACCIDENTAL AIRBAG DEPLOYMENT
AND POSSIBLE PERSONAL INJURY.
(1) Connect the electrical connector.
Fig. 17 HEADLIGHT SWITCH BEZEL
1 - SWITCH BEZEL
2 - INSTRUMENT PANEL
3 - ELECTRICAL CONNECTOR
4 - HEADLIGHT SWITCH
23 - 56 INSTRUMENT PANELDR
INSTRUMENT PANEL ASSEMBLY (Continued)
FIRING ORDER / CABLE ROUTING, 5.7L
V-8 ENGINE..........................8I-4
FIRING ORDER, 3.7L V-6 - ENGINE........8I-4
FIRING ORDER, 4.7L V-8 - ENGINE........8I-4
FIRING ORDER, DIESEL - FUEL
INJECTOR..........................14-48
FITTING - DESCRIPTION, QUICK
CONNECT............................14-8
FITTING - STANDARD PROCEDURE,
CONNECTING ROD BEARING...........9-129
FITTING - STANDARD PROCEDURE,
CRANKSHAFT MAIN BEARING.....9-134,9-207
FITTING - STANDARD PROCEDURE,
PISTON...................9-139,9-211,9-51
FITTING - STANDARD PROCEDURE,
PISTON RING.........9-142,9-213,9-284,9-53
FITTING, STANDARD PROCEDURE -
CONNECTING ROD BEARING............9-49
FITTING, STANDARD PROCEDURE -
MAIN BEARING.......................9-44
FITTINGS - STANDARD PROCEDURE,
HANDLING TUBING...................24-45
FITTINGS - STANDARD PROCEDURE,
QUICK-CONNECT......................14-8
FLAG - INSTALLATION, SIDE VIEW
MIRROR...........................23-27
FLAG - REMOVAL, SIDE VIEW MIRROR . . . 23-27
FLARING - STANDARD PROCEDURE,
DOUBLE INVERTED....................5-10
FLARING - STANDARD PROCEDURE, ISO . . . 5-11
FLEX PLATE - INSTALLATION . . 9-138,9-210,9-48
FLEX PLATE - REMOVAL.......9-138,9-210,9-48
FLOOR - INSTALLATION, LOAD..........23-72
FLOOR - REMOVAL, LOAD.............23-71
FLOOR CONSOLE - INSTALLATION.......23-67
FLOOR CONSOLE - REMOVAL...........23-67
FLOOR DISTRIBUTION DUCT -
INSTALLATION.......................24-34
FLOOR DISTRIBUTION DUCT - REMOVAL . 24-33
FLOOR MATS - INSTALLATION, CARPETS . 23-65
FLOOR MATS - REMOVAL, CARPETS.....23-65
FLOOR SHIFT BOOT - INSTALLATION,
4WD ..............................23-62
FLOOR SHIFT BOOT - REMOVAL, 4WD....23-62
FLOOR SUPPORT CYLINDER -
INSTALLATION, LOAD.................23-72
FLOOR SUPPORT CYLINDER -
REMOVAL, LOAD.....................23-72
FLOW - 5.9L DIESEL - DESCRIPTION,
COOLING SYSTEM.....................7-3
FLOW - DIAGNOSIS AND TESTING,
RADIATOR COOLANT..............7-54,7-56
FLOW 3.7L/4.7L/5.7L ENGINE -
DESCRIPTION, COOLING SYSTEM.........7-1
FLOW AND PRESSURE - DIAGNOSIS
AND TESTING, POWER STEERING........19-4
FLUID - DESCRIPTION................19-43
FLUID - DESCRIPTION, AUTOMATIC
TRANSMISSION.......................0-4
FLUID - DESCRIPTION, POWER
STEERING............................0-3
FLUID - DIAGNOSIS AND TESTING,
CAUSES OF BURNT............21-201,21-366
FLUID - OPERATION, AUTOMATIC
TRANSMISSION.......................0-5
FLUID AND FILTER REPLACEMENT -
STANDARD PROCEDURE........21-203,21-367
FLUID CAPACITIES, SPECIFICATIONS.......0-5
FLUID CONTAMINATION - DIAGNOSIS
AND TESTING................21-202,21-366
FLUID CONTAMINATION - DIAGNOSIS
AND TESTING, BRAKE..................5-23
FLUID COOLER - INSTALLATION.........19-43
FLUID COOLER - REMOVAL............19-43
FLUID DRAIN AND REFILL - STANDARD
PROCEDURE.....21-441,21-476,21-507,21-537,
21-571
FLUID INDICATOR - DESCRIPTION,
WASHER
...........................8J-44
FLUID INDICATOR - OPERATION,
WASHER
...........................8J-44
FLUID LEAK - DIAGNOSIS AND TESTING,
CONVERTER HOUSING
.........21-144,21-318
FLUID LEVEL - DIAGNOSIS AND
TESTING, EFFECTS OF INCORRECT
.....21-201,
21-366
FLUID LEVEL - STANDARD PROCEDURE,
BRAKE
..............................5-23FLUID LEVEL CHECK - STANDARD
PROCEDURE.................21-202,21-366
FLUID LEVEL CHECKING - STANDARD
PROCEDURE, POWER STEERING........19-43
FLUID LEVEL SWITCH - DESCRIPTION,
WASHER............................8R-9
FLUID LEVEL SWITCH - INSTALLATION,
WASHER...........................8R-11
FLUID LEVEL SWITCH - OPERATION,
WASHER............................8R-9
FLUID LEVEL SWITCH - REMOVAL,
WASHER...........................8R-10
FLUID RESERVOIR - INSTALLATION.......5-24
FLUID RESERVOIR - REMOVAL..........5-23
FLUID, SPECIFICATIONS - BRAKE.........5-23
FLUSH - SPECIFICATIONS, GAP.........23-95
FLUSHING - STANDARD PROCEDURE,
COOLING SYSTEM CLEANING/
REVERSE............................7-17
FLUSHING POWER STEERING SYSTEM -
STANDARD PROCEDURE...............19-40
FLYWHEEL - ASSEMBLY................6-11
FLYWHEEL - DIAGNOSIS AND TESTING....6-10
FLYWHEEL - DISASSEMBLY.............6-11
FLYWHEEL - INSTALLATION.............6-11
FLYWHEEL - REMOVAL.................6-11
FOG LAMP - INSTALLATION............8L-12
FOG LAMP - REMOVAL................8L-12
FOG LAMP RELAY - DESCRIPTION.......8L-12
FOG LAMP RELAY - INSTALLATION........8L-13
FOG LAMP RELAY - OPERATION.........8L-13
FOG LAMP RELAY - REMOVAL..........8L-13
FOOTMANS LOOP BRACKETS -
INSTALLATION, SEAT BACK REAR.......23-85
FOOTMANS LOOP BRACKETS -
REMOVAL, SEAT BACK REAR...........23-85
FORM-IN-PLACE GASKETS AND
SEALERS - STANDARD PROCEDURE . . 9-239,9-9,
9-94
FRAME - INSTALLATION, GRILLE........23-40
FRAME - REAR - INSTALLATION, SEAT
CUSHION...........................23-85
FRAME - REAR - REMOVAL, SEAT
CUSHION...........................23-85
FRAME - REMOVAL, GRILLE............23-40
FRAME DIMENSIONS - SPECIFICATIONS . . 13-16
FRAME H-SECTION REPLACEMENT -
STANDARD PROCEDURE, REAR.........13-13
FRAME RAIL TIP REPLACEMENT -
STANDARD PROCEDURE, LIGHT DUTY
FRONT..............................13-4
FREE MODULE - INSTALLATION, HANDS . . . 8T-2
FREE MODULE - REMOVAL, HANDS.......8T-2
FRONT - INSTALLATION....5-16,5-21,5-22,5-34
FRONT - INSTALLATION...............22-14
FRONT - INSTALLATION, CRANKSHAFT
OIL SEAL.............9-136,9-208,9-275,9-46
FRONT - INSTALLATION, PROPELLER
SHAFT - HD...........................3-7
FRONT - INSTALLATION, PROPELLER
SHAFT- LD............................3-7
FRONT - INSTALLATION, SEAT..........23-81
FRONT - INSTALLATION, SEAT BACK
CUSHION / COVER...................23-82
FRONT - INSTALLATION, SEAT CUSHION
/ COVER............................23-83
FRONT - REMOVAL........5-13,5-17,5-21,5-33
FRONT - REMOVAL, CRANKSHAFT OIL
SEAL................9-135,9-208,9-275,9-46
FRONT - REMOVAL, PROPELLER SHAFT
- HD ................................3-7
FRONT - REMOVAL, PROPELLER SHAFT-
LD ..................................3-6
FRONT - REMOVAL, SEAT..............23-81
FRONT - REMOVAL, SEAT BACK
CUSHION / COVER...................23-82
FRONT - REMOVAL, SEAT CUSHION /
COVER.............................23-83
FRONT AIR DAM - INSTALLATION........13-2
FRONT AIR DAM - REMOVAL............13-2
FRONT AXLE - 9 1/4 AA -
ADJUSTMENTS
.......................3-59
FRONT AXLE - 9 1/4 AA - DIAGNOSIS
AND TESTING
........................3-54
FRONT AXLE - 9 1/4 AA - INSTALLATION
. . . 3-58
FRONT AXLE - 9 1/4 AA - REMOVAL
......3-57
FRONT AXLE - 9 1/4 AA - SPECIAL
TOOLS
..............................3-64FRONT AXLE - 9 1/4 AA -
SPECIFICATIONS......................3-63
FRONT AXLE - C205F - ADJUSTMENTS....3-32
FRONT AXLE - C205F - DIAGNOSIS AND
TESTING............................3-27
FRONT AXLE - C205F - INSTALLATION.....3-31
FRONT AXLE - C205F - REMOVAL........3-31
FRONT AXLE - C205F - SPECIAL TOOLS . . . 3-40
FRONT AXLE - C205F - SPECIFICATIONS . . . 3-39
FRONT BEARING - INSTALLATION,
OUTPUT SHAFT.....................21-216
FRONT BEARING - REMOVAL, OUTPUT
SHAFT............................21-216
FRONT BRAKE HOSE - INSTALLATION.....5-13
FRONT BUMPER - INSTALLATION.........13-2
FRONT BUMPER - REMOVAL............13-2
FRONT CENTER SEAT BELT -
INSTALLATION......................8O-31
FRONT CENTER SEAT BELT - REMOVAL . . 8O-30
FRONT CENTER SEAT BELT &
RETRACTOR - INSTALLATION...........8O-29
FRONT CENTER SEAT BELT &
RETRACTOR - REMOVAL..............8O-29
FRONT CLUTCH - ASSEMBLY..........21-207
FRONT CLUTCH - DESCRIPTION........21-205
FRONT CLUTCH - DISASSEMBLY.......21-205
FRONT CLUTCH - INSPECTION.........21-206
FRONT CLUTCH - OPERATION.........21-205
FRONT CONTROL MODULE -
DESCRIPTION.....................8W-97-5
FRONT CONTROL MODULE -
DESCRIPTION........................8E-5
FRONT CONTROL MODULE - DIAGNOSIS
AND TESTING.....................8W-97-5
FRONT CONTROL MODULE - DIAGNOSIS
AND TESTING........................8E-5
FRONT CONTROL MODULE -
INSTALLATION....................8W-97-6
FRONT CONTROL MODULE -
INSTALLATION........................8E-5
FRONT CONTROL MODULE - OPERATION . 8W-97-5
FRONT CONTROL MODULE - OPERATION . . 8E-5
FRONT CONTROL MODULE - REMOVAL . 8W-97-6
FRONT CONTROL MODULE - REMOVAL....8E-5
FRONT CROSSMEMBER - INSTALLATION . . 13-22
FRONT CROSSMEMBER - REMOVAL.....13-22
FRONT DOOR GLASS RUN
WEATHERSTRIP - INSTALLATION........23-92
FRONT DOOR GLASS RUN
WEATHERSTRIP - REMOVAL............23-92
FRONT DOOR INNER BELT MOLDING -
INSTALLATION.......................23-93
FRONT DOOR INNER BELT MOLDING -
REMOVAL..........................23-93
FRONT DOOR OUTER BELT MOLDING -
INSTALLATION.......................23-93
FRONT DOOR OUTER BELT MOLDING -
REMOVAL..........................23-92
FRONT FASCIA - INSTALLATION..........13-3
FRONT FASCIA - REMOVAL..............13-2
FRONT FENDER - INSTALLATION........23-39
FRONT FENDER - REMOVAL............23-39
FRONT FRAME RAIL TIP REPLACEMENT
- STANDARD PROCEDURE, LIGHT
DUTY...............................13-4
FRONT HOSE - REMOVAL...............5-12
FRONT MOUNT - INSTALLATION . . . 9-147,9-218,
9-287,9-59
FRONT MOUNT - REMOVAL . . 9-146,9-217,9-286,
9-58
FRONT OUTBOARD SEAT BELT BUCKLE -
INSTALLATION......................8O-38
FRONT OUTBOARD SEAT BELT BUCKLE -
REMOVAL..........................8O-37
FRONT OUTPUT SHAFT SEAL -
INSTALLATION . . . 21-442,21-477,21-508,21-538,
21-572
FRONT OUTPUT SHAFT SEAL -
REMOVAL . 21-441,21-477,21-507,21-537,21-572
FRONT PARKING BRAKE CABLE -
INSTALLATION........................5-38
FRONT PARKING BRAKE CABLE -
REMOVAL
...........................5-36
FRONT SEAL - INSTALLATION, OIL
PUMP
............................21-391
FRONT SEAL - REMOVAL, OIL PUMP
....21-391
FRONT SERVO - ASSEMBLY
...........21-209
FRONT SERVO - CLEANING
...........21-209
DRINDEX 13
Description Group-Page Description Group-Page Description Group-Page
INTAKE AIR HEATER - OPERATION.......14-80
INTAKE AIR HEATER - REMOVAL........14-80
INTAKE AIR HEATER RELAY -
DESCRIPTION.......................14-82
INTAKE AIR HEATER RELAY -
INSTALLATION.......................14-82
INTAKE AIR HEATER RELAY -
OPERATION.........................14-82
INTAKE AIR HEATER RELAY - REMOVAL . . 14-82
INTAKE AIR TEMPERATURE SENSOR -
DESCRIPTION.......................14-30
INTAKE AIR TEMPERATURE SENSOR -
INSTALLATION.......................14-31
INTAKE AIR TEMPERATURE SENSOR -
OPERATION.........................14-30
INTAKE AIR TEMPERATURE SENSOR -
REMOVAL..........................14-30
INTAKE AIR TEMPERATURE SENSOR/
MAP SENSOR - DESCRIPTION..........14-82
INTAKE AIR TEMPERATURE SENSOR/
MAP SENSOR - INSTALLATION..........14-82
INTAKE AIR TEMPERATURE SENSOR/
MAP SENSOR - OPERATION............14-82
INTAKE AIR TEMPERATURE SENSOR/
MAP SENSOR - REMOVAL.............14-82
INTAKE MANIFOLD - CLEANING....9-160,9-226,
9-297
INTAKE MANIFOLD - DESCRIPTION . 9-159,9-225,
9-72
INTAKE MANIFOLD - INSPECTION . . 9-160,9-226,
9-297
INTAKE MANIFOLD - INSTALLATION.....9-160,
9-226,9-298,9-73
INTAKE MANIFOLD - REMOVAL....9-159,9-226,
9-297,9-73
INTAKE MANIFOLD LEAKAGE -
DIAGNOSIS AND TESTING........9-159,9-225
INTAKE MANIFOLD LEAKS - DIAGNOSIS
AND TESTING........................9-72
INTAKE SYSTEM - INSTALLATION, AIR....9-199
INTAKE SYSTEM - REMOVAL, AIR.......9-199
INTAKE/EXHAUST VALVES & SEATS -
DESCRIPTION..............9-123,9-256,9-28
INTAKE/EXHAUST VALVES & SEATS -
INSTALLATION...................9-124,9-30
INTAKE/EXHAUST VALVES & SEATS -
REMOVAL......................9-124,9-29
INTEGRATED POWER MODULE -
DESCRIPTION.....................8W-97-3
INTEGRATED POWER MODULE -
INSTALLATION....................8W-97-4
INTEGRATED POWER MODULE -
OPERATION.......................8W-97-3
INTEGRATED POWER MODULE -
REMOVAL........................8W-97-3
INTERIOR - CAUTION.................23-62
INTERLOCK - ADJUSTMENTS, BRAKE
TRANSMISSION SHIFT.........21-196,21-365
INTERLOCK - DIAGNOSIS AND TESTING,
BRAKE TRANSMISSION SHIFT . . . 21-196,21-364
INTERLOCK SYSTEM - DESCRIPTION,
BRAKE TRANSMISSION SHIFT . . . 21-196,21-364
INTERLOCK SYSTEM - OPERATION,
BRAKE TRANSMISSION SHIFT . . . 21-196,21-364
INTERNATIONAL SYMBOLS -
DESCRIPTION......................Intro.-5
INVERTED FLARING - STANDARD
PROCEDURE, DOUBLE.................5-10
IOD FUSE - DESCRIPTION...........8W-97-6
IOD FUSE - INSTALLATION...........8W-97-7
IOD FUSE - OPERATION.............8W-97-6
IOD FUSE - REMOVAL..............8W-97-7
ISO FLARING - STANDARD PROCEDURE
. . . 5-11
ISOLATORS - INSTALLATION, BODY
......23-37
ISOLATORS - REMOVAL, BODY
.........23-36
JOINT - DIAGNOSIS AND TESTING,
LOWER BALL
....................2-19,2-34
JOINT - DIAGNOSIS AND TESTING,
UPPER BALL
.....................2-27,2-36
JOINT - INSTALLATION, LOWER BALL
. 2-20,2-35
JOINT - INSTALLATION, UPPER BALL
.....2-36
JOINT - REMOVAL, LOWER BALL
.....2-19,2-35
JOINT - REMOVAL, UPPER BALL
.........2-36
JOINT-INNER - INSTALLATION, CV
........3-25
JOINT-INNER - REMOVAL, CV
............3-25
JOINT-OUTER - INSTALLATION, CV
........3-23
JOINT-OUTER - REMOVAL, CV
...........3-22JOINTS - ASSEMBLY, DOUBLE CARDAN
UNIVERSAL..........................3-17
JOINTS - DISASSEMBLY, DOUBLE
CARDAN UNIVERSAL..................3-16
JOUNCE BUMPER - INSTALLATION.......2-43
JOUNCE BUMPER - REMOVAL...........2-43
JOURNAL CLEARANCE - STANDARD
PROCEDURE, CONNECTING ROD
BEARING AND CRANKSHAFT...........9-272
JUMP STARTING - STANDARD
PROCEDURE.........................0-19
JUNCTION BLOCK - INSTALLATION,
BRAKE..............................5-24
JUNCTION BLOCK - REMOVAL, BRAKE....5-24
KEY CYLINDER - INSTALLATION.........19-12
KEY CYLINDER - REMOVAL............19-12
KEY IMMOBILIZER MODULE -
DESCRIPTION, SENTRY................8E-13
KEY IMMOBILIZER MODULE -
INSTALLATION, SENTRY...............8E-15
KEY IMMOBILIZER MODULE -
OPERATION, SENTRY.................8E-13
KEY IMMOBILIZER MODULE - REMOVAL,
SENTRY............................8E-15
KEY IMMOBILIZER MODULE (SKIM) -
DESCRIPTION, SENTRY................8Q-1
KEY IMMOBILIZER MODULE (SKIM) -
OPERATION, SENTRY..................8Q-2
KEY IMMOBILIZER SYSTEM INDICATOR
LAMP - DESCRIPTION, SENTRY..........8Q-5
KEY IMMOBILIZER SYSTEM INDICATOR
LAMP - OPERATION, SENTRY...........8Q-5
KEY IMMOBILIZER SYSTEM
INITIALIZATION, STANDARD
PROCEDURE - SENTRY................8Q-3
KEY IMMOBILIZER SYSTEM (SKIS) -
DESCRIPTION, SENTRY................8Q-1
KEY IMMOBILIZER SYSTEM (SKIS) -
OPERATION, SENTRY..................8Q-2
KEY IMMOBILIZER SYSTEM
TRANSPONDER PROGRAMMING,
STANDARD PROCEDURE - SENTRY.......8Q-4
KEY LOCK CYLINDER - DIAGNOSIS AND
TESTING, IGNITION SWITCH............19-11
KEY-IN IGNITION SWITCH -
DESCRIPTION.......................19-11
KEYLESS ENTRY MODULE -
DESCRIPTION, REMOTE................8N-7
KEYLESS ENTRY MODULE - DIAGNOSIS
AND TESTING, REMOTE................8N-7
KEYLESS ENTRY MODULE -
INSTALLATION, REMOTE...............8N-8
KEYLESS ENTRY MODULE - OPERATION,
REMOTE............................8N-7
KEYLESS ENTRY MODULE - REMOVAL,
REMOTE............................8N-7
KEYLESS ENTRY TRANSMITTER -
DIAGNOSIS AND TESTING, REMOTE......8N-8
KEYLESS ENTRY TRANSMITTER -
SPECIFICATIONS, REMOTE..............8N-9
KNOB RELEASE - INSTALLATION, TILT
LEVER.............................19-16
KNOB RELEASE - REMOVAL, TILT LEVER . . 19-16
KNOCK SENSOR - DESCRIPTION.........8I-14
KNOCK SENSOR - INSTALLATION........8I-15
KNOCK SENSOR - OPERATION..........8I-14
KNOCK SENSOR - REMOVAL............8I-15
KNUCKLE - DESCRIPTION...............2-18
KNUCKLE - INSTALLATION..........2-19,2-37
KNUCKLE - OPERATION................2-18
KNUCKLE - REMOVAL..............2-18,2-37
LABEL - DESCRIPTION, VEHICLE
CERTIFICATION....................Intro.-11
LAMP - DESCRIPTION, DOME...........8L-26
LAMP - DESCRIPTION, READING........8L-28
LAMP - DESCRIPTION, SENTRY KEY
IMMOBILIZER SYSTEM INDICATOR.......8Q-5
LAMP - INSTALLATION, CAB CLEARANCE . 8L-12
LAMP - INSTALLATION, CENTER HIGH
MOUNTED STOP.....................8L-11
LAMP - INSTALLATION, DOME..........8L-26
LAMP - INSTALLATION, FENDER
MARKER
...........................8L-18
LAMP - INSTALLATION, FOG
............8L-12
LAMP - INSTALLATION, LICENSE PLATE
. . 8L-17
LAMP - INSTALLATION, PARK/TURN
SIGNAL
............................8L-21
LAMP - INSTALLATION, READING
........8L-29LAMP - INSTALLATION, TAILGATE
MARKER...........................8L-18
LAMP - INSTALLATION, UNDERHOOD....8L-25
LAMP - OPERATION, DOME............8L-26
LAMP - OPERATION, READING..........8L-28
LAMP - OPERATION, SENTRY KEY
IMMOBILIZER SYSTEM INDICATOR.......8Q-5
LAMP - REMOVAL, CAB CLEARANCE.....8L-11
LAMP - REMOVAL, CENTER HIGH
MOUNTED STOP.....................8L-11
LAMP - REMOVAL, DOME..............8L-26
LAMP - REMOVAL, FENDER MARKER....8L-17
LAMP - REMOVAL, FOG...............8L-12
LAMP - REMOVAL, LICENSE PLATE......8L-17
LAMP - REMOVAL, PARK/TURN SIGNAL . . 8L-21
LAMP - REMOVAL, READING...........8L-28
LAMP - REMOVAL, TAILGATE MARKER . . . 8L-18
LAMP - REMOVAL, UNDERHOOD........8L-25
LAMP INDICATOR - DESCRIPTION,
CARGO.............................8J-20
LAMP INDICATOR - OPERATION, CARGO . . 8J-20
LAMP (MIL) - DESCRIPTION,
MALFUNCTION INDICATOR.............8J-31
LAMP (MIL) - OPERATION,
MALFUNCTION INDICATOR.............8J-31
LAMP OUT INDICATOR - DESCRIPTION . . . 8J-29
LAMP OUT INDICATOR - OPERATION.....8J-29
LAMP RELAY - DESCRIPTION, FOG......8L-12
LAMP RELAY - DESCRIPTION, PARK.....8L-20
LAMP RELAY - DIAGNOSIS AND
TESTING, PARK......................8L-20
LAMP RELAY - INSTALLATION, FOG......8L-13
LAMP RELAY - INSTALLATION, PARK.....8L-21
LAMP RELAY - OPERATION, FOG........8L-13
LAMP RELAY - OPERATION, PARK.......8L-20
LAMP RELAY - REMOVAL, FOG.........8L-13
LAMP RELAY - REMOVAL, PARK........8L-21
LAMP REPLACEMENT - STANDARD
PROCEDURE, MODULE................8M-3
LAMP REPLACEMENT - STANDARD
PROCEDURE, READING/COURTESY.......8M-3
LAMP SWITCH - DESCRIPTION, BACKUP . . . 8L-8
LAMP SWITCH - DESCRIPTION, BRAKE....8L-9
LAMP SWITCH - DIAGNOSIS AND
TESTING, BACKUP.....................8L-8
LAMP SWITCH - DIAGNOSIS AND
TESTING, BRAKE.....................8L-10
LAMP SWITCH - INSTALLATION, BRAKE . . 8L-11
LAMP SWITCH - OPERATION, BACKUP....8L-8
LAMP SWITCH - OPERATION, BRAKE......8L-9
LAMP SWITCH - REMOVAL, BRAKE......8L-10
LAMP UNIT - INSTALLATION, CENTER
HIGH MOUNTED STOP................8L-11
LAMP UNIT - INSTALLATION, LICENSE
PLATE .............................8L-17
LAMP UNIT - INSTALLATION,
UNDERHOOD........................8L-25
LAMP UNIT - REMOVAL, CENTER HIGH
MOUNTED STOP.....................8L-11
LAMP UNIT - REMOVAL, LICENSE PLATE . . 8L-17
LAMP UNIT - REMOVAL, UNDERHOOD . . . 8L-25
LAMPS, SPECIFICATIONS - EXTERIOR.....8L-7
LAMPS/LIGHTING - EXTERIOR -
DESCRIPTION........................8L-2
LAMPS/LIGHTING - EXTERIOR -
DIAGNOSIS AND TESTING..............8L-3
LAMPS/LIGHTING - EXTERIOR -
OPERATION..........................8L-2
LAMP/SWITCH - INSTALLATION, GLOVE
BOX ...............................8L-28
LAMP/SWITCH - REMOVAL, GLOVE BOX . . 8L-27
LASH ADJUSTER - DIAGNOSIS AND
TESTING, HYDRAULIC.............9-125,9-32
LASH ADJUSTMENT AND VERIFICATION
- STANDARD PROCEDURE, VALVE.......9-259
LATCH - INSTALLATION.....23-16,23-23,23-32,
23-47
LATCH - INSTALLATION, GLOVE BOX.....23-52
LATCH - INSTALLATION, UNDER SEAT
STORAGE BIN.......................23-80
LATCH - REMOVAL
....23-16,23-23,23-32,23-47
LATCH - REMOVAL, GLOVE BOX
.........23-52
LATCH - REMOVAL, UNDER SEAT
STORAGE BIN
.......................23-80
LATCH RELEASE CABLE/HANDLE
ASSEMBLY - INSTALLATION
............23-47
LATCH RELEASE CABLE/HANDLE
ASSEMBLY - REMOVAL
................23-47
18 INDEXDR
Description Group-Page Description Group-Page Description Group-Page
LATCH STRIKER - INSTALLATION . . 23-17,23-23,
23-33
LATCH STRIKER - REMOVAL . 23-16,23-23,23-33
LATCH STRIKER / SECONDARY CATCH -
INSTALLATION.......................23-48
LATCH STRIKER / SECONDARY CATCH -
REMOVAL..........................23-47
LD & HD EXCEPT 4X4 HD -
INSTALLATION, ALL..................19-14
LD & HD EXCEPT 4X4 HD - REMOVAL,
ALL ...............................19-14
LD FRONT - INSTALLATION, PROPELLER
SHAFT...............................3-7
LD FRONT - REMOVAL, PROPELLER
SHAFT...............................3-6
LEAD - DIAGNOSIS AND TESTING,
TIRE/VEHICLE........................22-8
LEAK - DIAGNOSIS AND TESTING,
CONVERTER HOUSING FLUID....21-144,21-318
LEAK - DIAGNOSIS AND TESTING,
ENGINE OIL................9-152,9-220,9-64
LEAK DETECTION ASSY - DESCRIPTION,
NATURAL VAC.......................25-23
LEAK DETECTION ASSY - INSTALLATION,
NATURAL VAC.......................25-25
LEAK DETECTION ASSY - OPERATION,
NATURAL VAC.......................25-23
LEAK DETECTION ASSY - REMOVAL,
NATURAL VAC.......................25-24
LEAK DETECTION PUMP - DESCRIPTION . . 25-13
LEAK DETECTION PUMP - INSTALLATION . 25-16
LEAK DETECTION PUMP - OPERATION....25-14
LEAK DETECTION PUMP - REMOVAL.....25-16
LEAKAGE - DIAGNOSIS AND TESTING,
CYLINDER COMBUSTION PRESSURE . 9-186,9-8,
9-93
LEAKAGE - DIAGNOSIS AND TESTING,
INTAKE MANIFOLD..............9-159,9-225
LEAKAGE - DIAGNOSIS AND TESTING,
PUMP.............................19-40
LEAKS - DIAGNOSIS AND TESTING,
CHARGE AIR COOLER SYSTEM.........11-16
LEAKS - DIAGNOSIS AND TESTING,
COOLING SYSTEM - TESTING.............7-5
LEAKS - DIAGNOSIS AND TESTING,
HIGH-PRESSURE FUEL LINE............14-58
LEAKS - DIAGNOSIS AND TESTING,
INTAKE MANIFOLD....................9-72
LEAKS - DIAGNOSIS AND TESTING,
REAR SEAL AREA...........9-137,9-209,9-65
LEAKS - DIAGNOSIS AND TESTING,
REFRIGERANT SYSTEM...............24-44
LEAKS - DIAGNOSIS AND TESTING,
WATER .............................23-1
LEAKS - STANDARD PROCEDURE,
REPAIRING.........................22-10
LEARN - STANDARD PROCEDURE,
DRIVE.............................8E-23
LEARN - STANDARD PROCEDURE, TCM
QUICK.............................8E-23
LEFT CYLINDER HEAD - INSTALLATION . . . 9-112
LEFT CYLINDER HEAD - REMOVAL.......9-108
LEFT REAR CABLE - INSTALLATION.......5-39
LEFT REAR CABLE - REMOVAL...........5-38
LENS REPLACEMENT - STANDARD
PROCEDURE, MODULE................8M-3
LEVEL - DIAGNOSIS AND TESTING,
EFFECTS OF INCORRECT FLUID . . 21-201,21-366
LEVEL - STANDARD PROCEDURE,
BRAKE FLUID........................5-23
LEVEL - STANDARD PROCEDURE,
ENGINE OIL.........................9-292
LEVEL - STANDARD PROCEDURE,
REFRIGERANT OIL...................24-69
LEVEL CHECK - STANDARD
PROCEDURE, COOLANT................7-17
LEVEL CHECK - STANDARD
PROCEDURE, FLUID...........21-202,21-366
LEVEL CHECKING - STANDARD
PROCEDURE, POWER STEERING FLUID
. . . 19-43
LEVEL SENDING UNIT / SENSOR -
DESCRIPTION, FUEL
..............14-57,14-6
LEVEL SENDING UNIT / SENSOR -
INSTALLATION, FUEL
..................14-7
LEVEL SENDING UNIT / SENSOR -
OPERATION, FUEL
................14-57,14-6
LEVEL SENDING UNIT / SENSOR -
REMOVAL, FUEL
......................14-7LEVEL SWITCH - DESCRIPTION,
WASHER FLUID......................8R-9
LEVEL SWITCH - INSTALLATION,
WASHER FLUID.....................8R-11
LEVEL SWITCH - OPERATION, WASHER
FLUID..............................8R-9
LEVEL SWITCH - REMOVAL, WASHER
FLUID.............................8R-10
LEVER - ADJUSTMENT, SHIFT . . . 21-446,21-481
LEVER - INSTALLATION, GEAR SHIFT.....19-12
LEVER - INSTALLATION, SHIFT . . . 21-445,21-480
LEVER - REMOVAL, GEAR SHIFT........19-12
LEVER - REMOVAL, SHIFT......21-444,21-479
LEVER KNOB RELEASE - INSTALLATION,
TILT ...............................19-16
LEVER KNOB RELEASE - REMOVAL, TILT . . 19-16
LICENSE PLATE LAMP - INSTALLATION . . . 8L-17
LICENSE PLATE LAMP - REMOVAL.......8L-17
LICENSE PLATE LAMP UNIT -
INSTALLATION.......................8L-17
LICENSE PLATE LAMP UNIT - REMOVAL . . 8L-17
LID - INSTALLATION, CENTER SEAT
BACK..............................23-79
LID - INSTALLATION, UNDER SEAT
STORAGE BIN.......................23-80
LID - REMOVAL, CENTER SEAT BACK....23-79
LID - REMOVAL, UNDER SEAT STORAGE
BIN ...............................23-80
LIFTERS/TAPPETS - CLEANING, SOLID....9-279
LIFTERS/TAPPETS - INSPECTION, SOLID . . . 9-279
LIFTERS/TAPPETS - INSTALLATION,
SOLID.............................9-280
LIFTERS/TAPPETS - REMOVAL, SOLID....9-279
LIGHT DUTY FRONT FRAME RAIL TIP
REPLACEMENT - STANDARD
PROCEDURE.........................13-4
LIGHTER OUTLET - DESCRIPTION,
CIGAR...........................8W-97-2
LIGHTER OUTLET - DIAGNOSIS AND
TESTING, CIGAR...................8W-97-2
LIGHTER OUTLET - OPERATION, CIGAR . 8W-97-2
LIMITING VALVE - DESCRIPTION, FUEL
PRESSURE.........................14-61
LIMITING VALVE - INSTALLATION, FUEL
PRESSURE.........................14-61
LIMITING VALVE - OPERATION, FUEL
PRESSURE.........................14-61
LIMITING VALVE - REMOVAL, FUEL
PRESSURE.........................14-61
LINE - DESCRIPTION, A/C DISCHARGE....24-56
LINE - DESCRIPTION, LIQUID...........24-65
LINE - DESCRIPTION, REFRIGERANT.....24-42
LINE - DESCRIPTION, SUCTION.........24-70
LINE - INSTALLATION, LIQUID..........24-66
LINE - REMOVAL, LIQUID..............24-65
LINE AND TERMINAL REPAIR -
STANDARD PROCEDURE, GRID..........8G-4
LINE COUPLER - DESCRIPTION,
REFRIGERANT.......................24-67
LINE COUPLER - INSTALLATION,
REFRIGERANT.......................24-68
LINE COUPLER - OPERATION,
REFRIGERANT.......................24-67
LINE COUPLER - REMOVAL,
REFRIGERANT.......................24-68
LINE LEAKS - DIAGNOSIS AND TESTING,
HIGH-PRESSURE FUEL................14-58
LINE PRESSURE (LP) SENSOR -
DESCRIPTION......................21-382
LINE PRESSURE (LP) SENSOR -
INSTALLATION......................21-383
LINE PRESSURE (LP) SENSOR -
OPERATION........................21-383
LINE PRESSURE (LP) SENSOR -
REMOVAL.........................21-383
LINES - DESCRIPTION, FUEL.......14-57,14-7
LINES - DESCRIPTION, VACUUM........25-22
LINES - INSTALLATION, FUEL...........14-60
LINES - OPERATION, FUEL.............14-57
LINES - OPERATION, REFRIGERANT......24-42
LINES - REMOVAL, FUEL..............14-58
LINK - INSTALLATION, DRAG...........19-36
LINK - REMOVAL, DRAG...............19-36
LINK CONNECTOR - DESCRIPTION, DATA
. . 8E-3
LINK CONNECTOR - OPERATION, DATA
....8E-3
LINKAGE - INSTALLATION
...............6-12
LINKAGE - LINK/COIL - DESCRIPTION
....19-34
LINKAGE - REMOVAL
..................6-12LINKAGE, SPECIAL TOOLS - STEERING . . . 19-35
LINK/COIL - DESCRIPTION, GEAR........19-20
LINK/COIL - DESCRIPTION, LINKAGE.....19-34
LINK/COIL - INSTALLATION, GEAR.......19-21
LINK/COIL - OPERATION, GEAR.........19-20
LINK/COIL - REMOVAL, GEAR...........19-20
LINK/COIL SUSPENSION - STANDARD
PROCEDURE, ALIGNMENT...............2-5
LIQUID LINE - DESCRIPTION...........24-65
LIQUID LINE - INSTALLATION...........24-66
LIQUID LINE - REMOVAL..............24-65
LOAD FLOOR - INSTALLATION..........23-72
LOAD FLOOR - REMOVAL..............23-71
LOAD FLOOR SUPPORT CYLINDER -
INSTALLATION.......................23-72
LOAD FLOOR SUPPORT CYLINDER -
REMOVAL..........................23-72
LOCATION - DESCRIPTION, CONNECTOR/
GROUND/SPLICE...................8W-91-1
LOCATIONS - SPECIFICATIONS, SEALER . 23-102
LOCATIONS - SPECIFICATIONS,
STRUCTURAL ADHESIVE..............23-112
LOCATIONS - SPECIFICATIONS, WELD . . . 23-120
LOCK - STANDARD PROCEDURE,
HYDROSTATIC..................9-190,9-240
LOCK CYLINDER - DIAGNOSIS AND
TESTING, IGNITION SWITCH AND KEY....19-11
LOCK CYLINDER - INSTALLATION.......23-24
LOCK CYLINDER - REMOVAL.............23-24
LOCK MOTOR - DESCRIPTION, DOOR.....8N-4
LOCK MOTOR - DIAGNOSIS AND
TESTING, DOOR......................8N-4
LOCK MOTOR - OPERATION, DOOR.......8N-4
LOCK SWITCH - DIAGNOSIS AND
TESTING, POWER.....................8N-4
LOCK SWITCH - INSTALLATION, POWER . . . 8N-4
LOCK SWITCH - REMOVAL, POWER......8N-4
LOCKING RETRACTOR - DESCRIPTION,
AUTOMATIC........................8O-14
LOCKING RETRACTOR - OPERATION,
AUTOMATIC........................8O-14
LOCKS - DESCRIPTION, POWER.........8N-1
LOCKS - DIAGNOSIS AND TESTING,
POWER.............................8N-3
LOCKS - OPERATION, POWER...........8N-2
LOOP ADJUSTER - INSTALLATION, SEAT
BELT TURNING......................8O-55
LOOP ADJUSTER - REMOVAL, SEAT
BELT TURNING......................8O-55
LOOP BRACKETS - INSTALLATION, SEAT
BACK REAR - FOOTMANS..............23-85
LOOP BRACKETS - REMOVAL, SEAT
BACK REAR - FOOTMANS..............23-85
LOW FUEL INDICATOR - DESCRIPTION . . . 8J-30
LOW FUEL INDICATOR - OPERATION.....8J-30
LOWER BALL JOINT - DIAGNOSIS AND
TESTING........................2-19,2-34
LOWER BALL JOINT - INSTALLATION . 2-20,2-35
LOWER BALL JOINT - REMOVAL.....2-19,2-35
LOWER CONTROL ARM BUSHINGS -
2WD (LD) - INSTALLATION..............2-15
LOWER CONTROL ARM BUSHINGS -
2WD (LD) - REMOVAL.................2-13
LOWER CONTROL ARM BUSHINGS -
4WD (LD) - INSTALLATION..............2-14
LOWER CONTROL ARM BUSHINGS -
4WD (LD) - REMOVAL.................2-13
LOWER SURROUND - INSTALLATION,
INSTRUMENT PANEL..................23-59
LOWER SURROUND - REMOVAL,
INSTRUMENT PANEL..................23-59
LOWER SUSPENSION ARM -
INSTALLATION........................2-38
LOWER SUSPENSION ARM - REMOVAL....2-38
LOWER TRIM - INSTALLATION,
B-PILLAR...........................23-64
LOWER TRIM - INSTALLATION,
C-PILLAR...........................23-67
LOWER TRIM - REMOVAL, B-PILLAR.....23-63
LOWER TRIM - REMOVAL, C-PILLAR.....23-66
LOW/REVERSE CLUTCH - ASSEMBLY....21-385
LOW/REVERSE CLUTCH - CLEANING
....21-385
LOW/REVERSE CLUTCH - DISASSEMBLY
. 21-384
LOW/REVERSE CLUTCH - INSPECTION
. . 21-385
LUBRICANTS - DESCRIPTION, ENGINE
OIL
.................................0-1
LUBRICATION - DESCRIPTION
.....9-150,9-220,
9-289,9-61
DRINDEX 19
Description Group-Page Description Group-Page Description Group-Page
OUTER TIE ROD END - REMOVAL.......19-32
OUTLET - DESCRIPTION, CIGAR
LIGHTER.........................8W-97-2
OUTLET - DESCRIPTION, POWER......8W-97-7
OUTLET - DIAGNOSIS AND TESTING,
CIGAR LIGHTER...................8W-97-2
OUTLET - DIAGNOSIS AND TESTING,
POWER..........................8W-97-7
OUTLET - INSTALLATION, POWER.....8W-97-8
OUTLET - OPERATION, CIGAR LIGHTER . 8W-97-2
OUTLET - OPERATION, POWER.......8W-97-7
OUTLET - REMOVAL, POWER.........8W-97-8
OUTLETS - DESCRIPTION, AIR..........24-26
OUTLETS - INSTALLATION, AIR.........24-27
OUTLETS - REMOVAL, AIR.............24-26
OUTPUT - DESCRIPTION, PCM...........8I-5
OUTPUT - OPERATION, PCM............14-27
OUTPUT - OPERATION, PCM.............8I-5
OUTPUT SHAFT FRONT BEARING -
INSTALLATION......................21-216
OUTPUT SHAFT FRONT BEARING -
REMOVAL.........................21-216
OUTPUT SHAFT REAR BEARING -
INSTALLATION......................21-217
OUTPUT SHAFT REAR BEARING -
REMOVAL.........................21-216
OUTPUT SHAFT SEAL - INSTALLATION,
FRONT....21-442,21-477,21-508,21-538,21-572
OUTPUT SHAFT SEAL - REMOVAL,
FRONT.....21-441,21-477,21-507,21-537,21-572
OUTPUT SPEED SENSOR - DESCRIPTION . 21-391
OUTPUT SPEED SENSOR -
INSTALLATION......................21-392
OUTPUT SPEED SENSOR - OPERATION . . 21-391
OUTPUT SPEED SENSOR - REMOVAL . . . 21-391
OVERDRIVE CLUTCH - DESCRIPTION....21-217
OVERDRIVE CLUTCH - OPERATION.....21-217
OVERDRIVE ELECTRICAL CONTROLS -
DIAGNOSIS AND TESTING............21-262
OVERDRIVE SWITCH - DESCRIPTION,
TOW/HAUL..................21-261,21-392
OVERDRIVE SWITCH - INSTALLATION,
TOW/HAUL..................21-262,21-393
OVERDRIVE SWITCH - OPERATION,
TOW/HAUL..................21-262,21-392
OVERDRIVE SWITCH - REMOVAL,
TOW/HAUL..................21-262,21-392
OVERDRIVE UNIT - ASSEMBLY.........21-226
OVERDRIVE UNIT - CLEANING.........21-225
OVERDRIVE UNIT - DISASSEMBLY......21-218
OVERDRIVE UNIT - INSPECTION.......21-225
OVERDRIVE UNIT - INSTALLATION......21-235
OVERDRIVE UNIT - REMOVAL.........21-218
OVERFLOW VALVE - DESCRIPTION,
CASCADE...........................14-66
OVERFLOW VALVE - OPERATION,
CASCADE...........................14-66
OVERHEAD CONSOLE - DESCRIPTION....8M-1
OVERHEAD CONSOLE - DIAGNOSIS AND
TESTING............................8M-2
OVERHEAD CONSOLE - OPERATION......8M-2
OVERHEAD CONSOLE REMOVAL,
REMOVAL
...........................8M-6
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
ASSEMBLY
.........................21-237
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
CLEANING
.........................21-236
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
DESCRIPTION
......................21-236
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
DISASSEMBLY
......................21-236
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
INSPECTION
.......................21-237
OVERRUNNING CLUTCH CAM/
OVERDRIVE PISTON RETAINER -
OPERATION
........................21-236
OXYGEN SENSOR - DESCRIPTION
.......14-35
OXYGEN SENSOR - INSTALLATION
.......14-36
OXYGEN SENSOR - REMOVAL
..........14-35
PAINT CODE - DESCRIPTION
...........23-73
PAINT CODES - SPECIFICATIONS
........23-73
PAINT TOUCH-UP - DESCRIPTION
.......23-74PAINT TOUCH-UP - STANDARD
PROCEDURE........................23-74
PAN - CLEANING, OIL.............9-293,9-66
PAN - DESCRIPTION, OIL...............9-66
PAN - INSPECTION, OIL...........9-293,9-66
PAN - INSTALLATION, OIL . . . 9-155,9-224,9-293,
9-66
PAN - REMOVAL, OIL . . . 9-155,9-224,9-293,9-66
PANEL - INSTALLATION, TRIM.....23-24,23-33
PANEL - REMOVAL, TRIM.........23-24,23-33
PANEL ANTENNA CABLE -
INSTALLATION, INSTRUMENT............8A-7
PANEL ANTENNA CABLE - REMOVAL,
INSTRUMENT........................8A-7
PANEL ASSEMBLY - INSTALLATION,
INSTRUMENT.......................23-55
PANEL ASSEMBLY - REMOVAL,
INSTRUMENT.......................23-52
PANEL CENTER BEZEL - INSTALLATION,
INSTRUMENT.......................23-57
PANEL CENTER BEZEL - REMOVAL,
INSTRUMENT.......................23-57
PANEL DEMISTER DUCTS -
INSTALLATION, INSTRUMENT...........24-37
PANEL DEMISTER DUCTS - REMOVAL,
INSTRUMENT.......................24-36
PANEL DRIVER SIDE BEZEL -
INSTALLATION, INSTRUMENT...........23-58
PANEL DRIVER SIDE BEZEL - REMOVAL,
INSTRUMENT.......................23-58
PANEL DUCTS - INSTALLATION,
INSTRUMENT.........................24-37
PANEL DUCTS - REMOVAL,
INSTRUMENT.......................24-37
PANEL HEADLAMP SWITCH BEZEL -
INSTALLATION, INSTRUMENT...........23-56
PANEL HEADLAMP SWITCH BEZEL -
REMOVAL, INSTRUMENT..............23-56
PANEL LOWER SURROUND -
INSTALLATION, INSTRUMENT...........23-59
PANEL LOWER SURROUND - REMOVAL,
INSTRUMENT.......................23-59
PANEL REPAIR - STANDARD
PROCEDURE, PLASTIC BODY............23-3
PANEL TOP COVER - INSTALLATION,
INSTRUMENT.......................23-59
PANEL TOP COVER - REMOVAL,
INSTRUMENT.......................23-58
PANEL TRIM - INSTALLATION, REAR
CAB BACK..........................23-69
PANEL TRIM - REMOVAL, REAR CAB
BACK..............................23-68
PARK BRAKE CABLE - INSTALLATION,
REAR...............................5-38
PARK BRAKE CABLE - REMOVAL, REAR . . . 5-37
PARK LAMP RELAY - DESCRIPTION......8L-20
PARK LAMP RELAY - DIAGNOSIS AND
TESTING...........................8L-20
PARK LAMP RELAY - INSTALLATION.....8L-21
PARK LAMP RELAY - OPERATION.......8L-20
PARK LAMP RELAY - REMOVAL.........8L-21
PARKING BRAKE - DESCRIPTION.........5-36
PARKING BRAKE - OPERATION...........5-36
PARKING BRAKE CABLE -
INSTALLATION, FRONT.................5-38
PARKING BRAKE CABLE - REMOVAL,
FRONT..............................5-36
PARKING BRAKE SHOES - ADJUSTMENT
. . . 5-41
PARK/TURN SIGNAL LAMP -
INSTALLATION
.......................8L-21
PARK/TURN SIGNAL LAMP - REMOVAL
. . . 8L-21
PARTS - STANDARD PROCEDURES,
CLEANING FUEL SYSTEM
..............14-47
PASSENGER AIRBAG - DESCRIPTION
....8O-39
PASSENGER AIRBAG - INSTALLATION
....8O-41
PASSENGER AIRBAG - OPERATION
......8O-40
PASSENGER AIRBAG - REMOVAL
........8O-40
PASSENGER AIRBAG ON/OFF SWITCH -
DESCRIPTION
.......................8O-42
PASSENGER AIRBAG ON/OFF SWITCH -
INSTALLATION
......................8O-44
PASSENGER AIRBAG ON/OFF SWITCH -
OPERATION
.........................8O-43
PASSENGER AIRBAG ON/OFF SWITCH -
REMOVAL
..........................8O-43
PASSENGER SEAT SWITCH -
DESCRIPTION
.......................8N-15PASSENGER SEAT SWITCH - DIAGNOSIS
AND TESTING.......................8N-16
PASSENGER SEAT SWITCH -
INSTALLATION......................8N-16
PASSENGER SEAT SWITCH - OPERATION . 8N-15
PASSENGER SEAT SWITCH - REMOVAL . . . 8N-16
PATTERNS - DIAGNOSIS AND TESTING,
TIRE WEAR..........................22-8
PCM - DESCRIPTION...................8E-7
PCM - OPERATION...................8E-10
PCM INPUT - OPERATION, ASD SENSE.....8I-5
PCM OUTPUT - DESCRIPTION............8I-5
PCM OUTPUT - OPERATION............14-27
PCM OUTPUT - OPERATION.............8I-5
PCM/SKIM PROGRAMMING - STANDARD
PROCEDURE........................8E-14
PCV VALVE - 3.7L V-6/ 4.7L V-8 -
DIAGNOSIS AND TESTING.............25-20
PCV VALVE - DESCRIPTION............25-17
PCV VALVE - INSTALLATION............25-21
PCV VALVE - OPERATION..............25-19
PCV VALVE - REMOVAL...............25-21
PEDAL - DESCRIPTION.................5-28
PEDAL - INSTALLATION............5-28,5-42
PEDAL - INSTALLATION, ACCELERATOR . . . 14-21
PEDAL - OPERATION...................5-28
PEDAL - REMOVAL................5-28,5-42
PEDAL - REMOVAL, ACCELERATOR........14-21
PEDAL MOTOR - DESCRIPTION,
ADJUSTABLE..........................5-6
PEDAL MOTOR - INSTALLATION,
ADJUSTABLE..........................5-7
PEDAL MOTOR - REMOVAL,
ADJUSTABLE..........................5-7
PEDAL POSITION SENSOR -
DESCRIPTION, ACCELERATOR.....14-22,14-68
PEDAL POSITION SENSOR -
INSTALLATION, ACCELERATOR.....14-22,14-71
PEDAL POSITION SENSOR - OPERATION,
ACCELERATOR.................14-22,14-68
PEDAL POSITION SENSOR - REMOVAL,
ACCELERATOR.................14-22,14-68
PEDAL POSITION SWITCH -
DESCRIPTION, CLUTCH.................6-13
PEDAL POSITION SWITCH - DIAGNOSIS
AND TESTING, CLUTCH.................6-13
PEDAL POSITION SWITCH - OPERATION,
CLUTCH.............................6-13
PEDAL SWITCH - INSTALLATION,
ADJUSTABLE..........................5-6
PEDAL SWITCH - REMOVAL,
ADJUSTABLE..........................5-6
PER MILE, SPECIFICATIONS - TIRE
REVOLUTIONS.......................22-10
PERFORMANCE - DIAGNOSIS AND
TESTING, A/C........................24-3
PERFORMANCE - DIAGNOSIS AND
TESTING, ENGINE DIAGNOSIS . . . 9-183,9-4,9-90
PERFORMANCE TEST - DIAGNOSIS AND
TESTING, HEATER.....................24-6
PILOT BEARING - INSTALLATION.........6-12
PILOT BEARING - REMOVAL.............6-11
PINION GEAR/RING GEAR -
INSTALLATION....................3-51,3-77
PINION GEAR/RING GEAR - REMOVAL . 3-49,3-75
PINION GEAR/RING GEAR/TONE RING -
INSTALLATION.............3-108,3-137,3-164
PINION GEAR/RING GEAR/TONE RING -
REMOVAL................3-106,3-134,3-162
PINION SEAL - INSTALLATION . 3-126,3-154,3-45,
3-71,3-96
PINION SEAL - REMOVAL....3-126,3-153,3-44,
3-70,3-95
PIPE - INSPECTION, EXHAUST.......11-7,11-8
PISTON & CONNECTING ROD -
CLEANING.....................9-140,9-212
PISTON & CONNECTING ROD -
DESCRIPTION.........9-139,9-211,9-281,9-48
PISTON & CONNECTING ROD -
INSPECTION
...................9-140,9-213
PISTON & CONNECTING ROD -
INSTALLATION
..................9-140,9-213
PISTON & CONNECTING ROD -
REMOVAL
................9-139,9-212,9-281
PISTON AND CONNECTING ROD -
CLEANING
..........................9-282
PISTON FITTING - STANDARD
PROCEDURE
...............9-139,9-211,9-51
DRINDEX 23
Description Group-Page Description Group-Page Description Group-Page