1998 DODGE RAM 1500 vin

[x] Cancel search: vin

Page 2518 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual REMOVAL
WARNING: ON VEHICLES EQUIPPED WITH AIR-
BAGS, DISABLE THE AIRBAG SYSTEM BEFORE
ATTEMPTING ANY STEERING WHEEL, STEERING
COLUMN, OR INSTRUMENT PANEL COMPONENT
DIAGNOSIS OR SERVICE. DISCONNECT AN

Page 2530 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual A/C SYSTEM
WARNING: THE AIR CONDITIONING SYSTEM CON-
TAINS REFRIGERANT UNDER HIGH PRESSURE.
SEVERE PERSONAL INJURY MAY RESULT FROM
IMPROPER SERVICE PROCEDURES. REPAIRS
SHOULD ONLY BE PERFORMED BY QUAL

Page 2551 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual HEATER INLET HOSE
REMOVAL
The heater inlet hose is constructed from rubber
hoses and plastic hose connectors. The ends are
secured to the heater core, engine and engine coolant
reservoir (depending on

Page 2552 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (1) Drain the engine cooling system (Refer to 7 -
COOLING - STANDARD PROCEDURE - COOLING
SYSTEM DRAIN).
(2) Remove the heater hose retaining brackets as
required (depending on engine application).
(3)

Page 2578 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual Check the vapor/vacuum lines at the LDP, LDP
filter and EVAP canister purge solenoid for
damage or leaks. If a leak is present, a Diagnos-
tic Trouble Code (DTC) may be set.
(4) Connect electrical con

Page 2581 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual DIAGNOSIS AND TESTING - PCV VALVE - 3.7L
V-6/ 4.7L V-8
(1) Disconnect PCV line/hose (Fig. 19) by discon-
necting rubber connecting hose at PCV valve fitting.
(2) Remove PCV valve at oil filler tube by
Page:   < prev 1-10 ... 289-296 297-304 305-312 313-320 321-328