(1) Drain the engine cooling system (Refer to 7 -
COOLING - STANDARD PROCEDURE - COOLING
SYSTEM DRAIN).
(2) Remove the heater hose retaining brackets as
required (depending on engine application).
(3) Using spring tension clamp pliers, compress
and slide the clamps off of each end of the hose being
removed (Fig. 25).
CAUTION: DO NOT apply excessive pressure on
heater tubes or connections when removing heater
hoses. Excessive pressure may damage or deform
the tubes/heater core, causing an engine coolant
leak.
(4) Disconnect each hose end by carefully twisting
the hose back and forth on the tube, while gently
pulling it away from the end of the tube.
(5) If necessary, carefully cut the hose end and
peel the hose off of the tube.
NOTE: Replacement of the heater return hose will
be required if the hose ends are cut for removal.
(6) Remove the heater return hose from the engine
compartment.
(7) Separate the heater hoses from each other as
required (depending on engine application).INSTALLATION
(1) If separated, reconnect the heater hoses to each
other as required (depending on engine application).
(2) Position the heater return hose into the engine
compartment.
(3) Using spring tension clamp pliers, compress
and slide each clamp away from the end of the hose
being installed.
(4) Install each hose by carefully twisting the hose
back and forth while gently pushing it onto the tube
end.
(5) Using spring tension clamp pliers, compress
and slide the clamps onto each end of the hose being
installed.
(6) Install the heater hose retaining brackets as
required (depending on engine application).
(7) Refill the engine cooling system (Refer to 7 -
COOLING - STANDARD PROCEDURE).
LIQUID LINE
DESCRIPTION
The liquid line is the refrigerant line that carries
refrigerant from the A/C condenser to the evaporator.
The liquid line for this model consist of two separate
lines that connect to each other. The liquid lines are
made from light-weight aluminum or steel, and use
braze-less fittings.
The front half of the liquid line contains the fixed
orifice tube. The liquid lines are only serviced as an
assembly, except for the rubber O-ring seals used on
the end fittings. The liquid lines cannot be adjusted
or repaired and, if found to be leaking or damaged,
they must be replaced.
REMOVAL
WARNING: REVIEW THE WARNINGS AND CAU-
TIONS IN THE FRONT OF THIS SECTION BEFORE
PERFORMING THE FOLLOWING OPERATION (Refer
to 24 - HEATING & AIR CONDITIONING/PLUMBING -
WARNING) and (Refer to 24 - HEATING & AIR CON-
DITIONING/PLUMBING - CAUTION).
(1) Disconnect and isolate the battery negative
cable.
(2) If equipped with the diesel engine, remove the
passenger side battery (Refer to 8 - ELECTRICAL/
BATTERY SYSTEM/BATTERY - REMOVAL).
(3) If equipped with the diesel engine, remove the
passenger side battery tray (Refer to 8 - ELECTRI-
CAL/BATTERY SYSTEM/TRAY - REMOVAL).
(4) Recover the refrigerant from the refrigerant
system (Refer to 24 - HEATING & AIR CONDITION-
Fig. 25 Heater Hoses - Typical
1 - HEATER CORE TUBES
2 - HEATER INLET HOSE
3 - RETAINING BRACKET
4 - HOSE CONNECTOR
5 - SPRING CLAMP
6 - HEATER RETURN HOSE
DRPLUMBING 24 - 65
HEATER RETURN HOSE (Continued)
O2S is used to detect the amount of oxygen in the
exhaust gas before the gas enters the catalytic con-
verter. The PCM calculates the A/F mixture from the
output of the O2S. A low voltage indicates high oxy-
gen content (lean mixture). A high voltage indicates a
low content of oxygen (rich mixture).
When the upstream O2S detects a lean condition,
there is an abundance of oxygen in the exhaust gas.
A functioning converter would store this oxygen so it
can use it for the oxidation of HC and CO. As the
converter absorbs the oxygen, there will be a lack of
oxygen downstream of the converter. The output of
the downstream O2S will indicate limited activity in
this condition.
As the converter loses the ability to store oxygen,
the condition can be detected from the behavior of
the downstream O2S. When the efficiency drops, no
chemical reaction takes place. This means the con-
centration of oxygen will be the same downstream as
upstream. The output voltage of the downstream
O2S copies the voltage of the upstream sensor. The
only difference is a time lag (seen by the PCM)
between the switching of the O2S's.
To monitor the system, the number of lean-to-rich
switches of upstream and downstream O2S's is
counted. The ratio of downstream switches to
upstream switches is used to determine whether the
catalyst is operating properly. An effective catalyst
will have fewer downstream switches than it has
upstream switches i.e., a ratio closer to zero. For a
totally ineffective catalyst, this ratio will be one-to-
one, indicating that no oxidation occurs in the device.
The system must be monitored so that when cata-
lyst efficiency deteriorates and exhaust emissions
increase to over the legal limit, the MIL will be illu-
minated.
DESCRIPTION - TRIP DEFINITION
The term ªTripº has different meanings depending
on what the circumstances are. If the MIL (Malfunc-
tion Indicator Lamp) is OFF, a Trip is defined as
when the Oxygen Sensor Monitor and the Catalyst
Monitor have been completed in the same drive cycle.
When any Emission DTC is set, the MIL on the
dash is turned ON. When the MIL is ON, it takes 3
good trips to turn the MIL OFF. In this case, it
depends on what type of DTC is set to know what a
ªTripº is.
For the Fuel Monitor or Mis-Fire Monitor (contin-
uous monitor), the vehicle must be operated in the
ªSimilar Condition Windowº for a specified amount of
time to be considered a Good Trip.If a Non-Contiuous OBDII Monitor fails twice in a
row and turns ON the MIL, re-running that monitor
which previously failed, on the next start-up and
passing the monitor, is considered to be a Good Trip.
These will include the following:
²Oxygen Sensor
²Catalyst Monitor
²Purge Flow Monitor
²Leak Detection Pump Monitor (if equipped)
²EGR Monitor (if equipped)
²Oxygen Sensor Heater Monitor
If any other Emission DTC is set (not an OBDII
Monitor), a Good Trip is considered to be when the
Oxygen Sensor Monitor and Catalyst Monitor have
been completed; or 2 Minutes of engine run time if
the Oxygen Sensor Monitor or Catalyst Monitor have
been stopped from running.
It can take up to 2 Failures in a row to turn on the
MIL. After the MIL is ON, it takes 3 Good Trips to
turn the MIL OFF. After the MIL is OFF, the PCM
will self-erase the DTC after 40 Warm-up cycles. A
Warm-up cycle is counted when the ECT (Engine
Coolant Temperature Sensor) has crossed 160ÉF and
has risen by at least 40ÉF since the engine has been
started.
DESCRIPTION - COMPONENT MONITORS
There are several components that will affect vehi-
cle emissions if they malfunction. If one of these com-
ponents malfunctions the Malfunction Indicator
Lamp (MIL) will illuminate.
Some of the component monitors are checking for
proper operation of the part. Electrically operated
components now have input (rationality) and output
(functionality) checks. Previously, a component like
the Throttle Position sensor (TPS) was checked by
the PCM for an open or shorted circuit. If one of
these conditions occurred, a DTC was set. Now there
is a check to ensure that the component is working.
This is done by watching for a TPS indication of a
greater or lesser throttle opening than MAP and
engine rpm indicate. In the case of the TPS, if engine
vacuum is high and engine rpm is 1600 or greater,
and the TPS indicates a large throttle opening, a
DTC will be set. The same applies to low vacuum if
the TPS indicates a small throttle opening.
All open/short circuit checks, or any component
that has an associated limp-in, will set a fault after 1
trip with the malfunction present. Components with-
out an associated limp-in will take two trips to illu-
minate the MIL.
25 - 4 EMISSIONS CONTROLDR
EMISSIONS CONTROL (Continued)
Trip Indicator
TheTripis essential for running monitors and
extinguishing the MIL. In OBD II terms, a trip is a
set of vehicle operating conditions that must be met
for a specific monitor to run. All trips begin with a
key cycle.
Good Trip
The Good Trip counters are as follows:
²Specific Good Trip
²Fuel System Good Trip
²Misfire Good Trip
²Alternate Good Trip (appears as a Global Good
Trip on DRB III)
²Comprehensive Components
²Major Monitor
²Warm-Up Cycles
Specific Good Trip
The term Good Trip has different meanings
depending on the circumstances:
²If the MIL is OFF, a trip is defined as when the
Oxygen Sensor Monitor and the Catalyst Monitor
have been completed in the same drive cycle.
²If the MIL is ON and a DTC was set by the Fuel
Monitor or Misfire Monitor (both continuous moni-
tors), the vehicle must be operated in the Similar
Condition Window for a specified amount of time.
²If the MIL is ON and a DTC was set by a Task
Manager commanded once-per-trip monitor (such as
the Oxygen Sensor Monitor, Catalyst Monitor, Purge
Flow Monitor, Leak Detection Pump Monitor, EGR
Monitor or Oxygen Sensor Heater Monitor), a good
trip is when the monitor is passed on the next start-
up.
²If the MIL is ON and any other emissions DTC
was set (not an OBD II monitor), a good trip occurs
when the Oxygen Sensor Monitor and Catalyst Mon-
itor have been completed, or two minutes of engine
run time if the Oxygen Sensor Monitor and Catalyst
Monitor have been stopped from running.
Fuel System Good Trip
To count a good trip (three required) and turn off
the MIL, the following conditions must occur:
²Engine in closed loop
²Operating in Similar Conditions Window
²Short Term multiplied by Long Term less than
threshold
²Less than threshold for a predetermined time
If all of the previous criteria are met, the PCM will
count a good trip (three required) and turn off the
MIL.
Misfire Good Trip
If the following conditions are met the PCM will
count one good trip (three required) in order to turn
off the MIL:
²Operating in Similar Condition Window
²1000 engine revolutions with no misfireWarm-Up Cycles
Once the MIL has been extinguished by the Good
Trip Counter, the PCM automatically switches to a
Warm-Up Cycle Counter that can be viewed on the
DRB III. Warm-Up Cycles are used to erase DTCs
and Freeze Frames. Forty Warm-Up cycles must
occur in order for the PCM to self-erase a DTC and
Freeze Frame. A Warm-Up Cycle is defined as fol-
lows:
²Engine coolant temperature must start below
and rise above 160É F
²Engine coolant temperature must rise by 40É F
²No further faults occur
Freeze Frame Data Storage
Once a failure occurs, the Task Manager records
several engine operating conditions and stores it in a
Freeze Frame. The Freeze Frame is considered one
frame of information taken by an on-board data
recorder. When a fault occurs, the PCM stores the
input data from various sensors so that technicians
can determine under what vehicle operating condi-
tions the failure occurred.
The data stored in Freeze Frame is usually
recorded when a system fails the first time for two
trip faults. Freeze Frame data will only be overwrit-
ten by a different fault with a higher priority.
CAUTION: Erasing DTCs, either with the DRB III or
by disconnecting the battery, also clears all Freeze
Frame data.
Similar Conditions Window
The Similar Conditions Window displays informa-
tion about engine operation during a monitor. Abso-
lute MAP (engine load) and Engine RPM are stored
in this window when a failure occurs. There are two
different Similar conditions Windows: Fuel System
and Misfire.
FUEL SYSTEM
²Fuel System Similar Conditions WindowÐ
An indicator that 'Absolute MAP When Fuel Sys Fail'
and 'RPM When Fuel Sys Failed' are all in the same
range when the failure occurred. Indicated by switch-
ing from 'NO' to 'YES'.
²Absolute MAP When Fuel Sys FailÐ The
stored MAP reading at the time of failure. Informs
the user at what engine load the failure occurred.
²Absolute MAPÐ A live reading of engine load
to aid the user in accessing the Similar Conditions
Window.
²RPM When Fuel Sys FailÐ The stored RPM
reading at the time of failure. Informs the user at
what engine RPM the failure occurred.
DREMISSIONS CONTROL 25 - 7
EMISSIONS CONTROL (Continued)
CASE - NV271 - DESCRIPTION,
TRANSFER.........................21-447
CASE - NV271 - DIAGNOSIS AND
TESTING, TRANSFER.................21-448
CASE - NV271 - DISASSEMBLY,
TRANSFER.........................21-450
CASE - NV271 - INSPECTION, TRANSFER . 21-459
CASE - NV271 - INSTALLATION,
TRANSFER.........................21-473
CASE - NV271 - OPERATION, TRANSFER . 21-448
CASE - NV271 - REMOVAL, TRANSFER . . 21-450
CASE - NV273 - ASSEMBLY, TRANSFER . . 21-556
CASE - NV273 - CLEANING, TRANSFER . . 21-554
CASE - NV273 - DESCRIPTION,
TRANSFER.........................21-542
CASE - NV273 - DIAGNOSIS AND
TESTING, TRANSFER.................21-543
CASE - NV273 - DISASSEMBLY,
TRANSFER.........................21-544
CASE - NV273 - INSPECTION, TRANSFER . 21-554
CASE - NV273 - INSTALLATION,
TRANSFER.........................21-568
CASE - NV273 - OPERATION, TRANSFER . 21-543
CASE - NV273 - REMOVAL, TRANSFER . . 21-544
CASE BEARINGS - INSTALLATION,
DIFFERENTIAL.....3-106,3-134,3-161,3-48,3-75
CASE BEARINGS - REMOVAL,
DIFFERENTIAL.....3-105,3-134,3-161,3-48,3-75
CASE CONTROL MODULE -
DESCRIPTION, TRANSFER.............8E-16
CASE CONTROL MODULE - OPERATION,
TRANSFER..........................8E-16
CASE, NV241 GENII - TRANSFER.......21-438
CASE, NV241/NV243 - TRANSFER......21-439
CASE, NV243 - TRANSFER......21-505,21-506
CASE, NV244 GENII - TRANSFER.......21-535
CASE, NV271 - TRANSFER............21-473
CASE NV271/NV273, SPECIAL TOOLS -
TRANSFER...................21-474,21-569
CASE, NV273 - TRANSFER............21-568
CASE SKID PLATE - INSTALLATION,
TRANSFER..........................13-26
CASE SKID PLATE - REMOVAL,
TRANSFER..........................13-26
CASTER ADJUSTMENT - STANDARD
PROCEDURE, CAMBER..................2-4
CASTER AND TOE ADJUSTMENT -
STANDARD PROCEDURE, CAMBER........2-4
CATALYTIC CONVERTER - DESCRIPTION . . . 11-6
CATALYTIC CONVERTER - OPERATION.....11-6
CATCH - INSTALLATION, LATCH STRIKER
/ SECONDARY.......................23-48
CATCH - REMOVAL, LATCH STRIKER /
SECONDARY........................23-47
CAUTION - A/C SYSTEM...............24-43
CAUTION, HALF SHAFT.................3-20
CAUTION, INTERIOR..................23-62
CENTER - DESCRIPTION, ELECTRONIC
VEHICLE INFO.......................8M-7
CENTER - DIAGNOSIS AND TESTING,
ELECTRONIC VEHICLE INFORMATION.....8M-8
CENTER - INSTALLATION, ELECTRONIC
VEHICLE INFO.......................8M-9
CENTER & LEFT OUTBOARD -
INSTALLATION......................8O-50
CENTER & LEFT OUTBOARD - REMOVAL
. . 8O-48
CENTER - OPERATION, ELECTRONIC
VEHICLE INFO
.......................8M-7
CENTER - REMOVAL, ELECTRONIC
VEHICLE INFO
.......................8M-9
CENTER ANCHOR & RIGHT OUTBOARD -
INSTALLATION
......................8O-50
CENTER ANCHOR & RIGHT OUTBOARD -
REMOVAL
..........................8O-49
CENTER ARMREST / SEAT BACK -
INSTALLATION
.......................23-77
CENTER ARMREST / SEAT BACK -
REMOVAL
..........................23-76
CENTER BEARING - ADJUSTMENTS
........3-9
CENTER BEARING - INSTALLATION
........3-9
CENTER BEARING - REMOVAL
............3-9
CENTER BEZEL - INSTALLATION,
INSTRUMENT PANEL
..................23-57
CENTER BEZEL - REMOVAL,
INSTRUMENT PANEL
..................23-57
CENTER HIGH MOUNTED STOP LAMP -
INSTALLATION
.......................8L-11CENTER HIGH MOUNTED STOP LAMP -
REMOVAL..........................8L-11
CENTER HIGH MOUNTED STOP LAMP
UNIT - INSTALLATION.................8L-11
CENTER HIGH MOUNTED STOP LAMP
UNIT - REMOVAL....................8L-11
CENTER PROGRAMMING - STANDARD
PROCEDURE, ELECTRONIC VEHICLE
INFORMATION.......................8M-8
CENTER SEAT - INSTALLATION..........23-76
CENTER SEAT - REMOVAL.............23-75
CENTER SEAT BACK HINGE -
INSTALLATION.......................23-79
CENTER SEAT BACK HINGE - REMOVAL . . . 23-78
CENTER SEAT BACK INERTIA HINGE
COVER - INSTALLATION...............23-77
CENTER SEAT BACK INERTIA HINGE
COVER - REMOVAL...................23-77
CENTER SEAT BACK LID - INSTALLATION . 23-79
CENTER SEAT BACK LID - REMOVAL.....23-79
CENTER SEAT BELT - INSTALLATION,
FRONT.............................8O-31
CENTER SEAT BELT - REMOVAL, FRONT . . 8O-30
CENTER SEAT BELT & RETRACTOR -
INSTALLATION, FRONT................8O-29
CENTER SEAT BELT & RETRACTOR -
INSTALLATION, REAR.................8O-45
CENTER SEAT BELT & RETRACTOR -
REMOVAL, FRONT....................8O-29
CENTER SEAT BELT & RETRACTOR -
REMOVAL, REAR....................8O-44
CENTER SEAT CUSHION - INSTALLATION . . . 23-79
CENTER SEAT CUSHION - REMOVAL.....23-79
CENTER SEAT CUSHION COVER -
INSTALLATION.......................23-79
CENTER SEAT CUSHION COVER -
REMOVAL..........................23-79
CENTERING - STANDARD PROCEDURE,
CLOCKSPRING......................8O-19
CERTIFICATION LABEL - DESCRIPTION,
VEHICLE.........................Intro.-11
CHAIN COVER(S) - INSTALLATION,
TIMING BELT....................9-171,9-81
CHAIN COVER(S) - REMOVAL, TIMING
BELT ..........................9-170,9-81
CHAIN WEAR - STANDARD PROCEDURE,
MEASURING TIMING..................9-167
CHAIN WEAR, STANDARD PROCEDURE -
MEASURING TIMING...................9-77
CHAIN/TENSIONER - DESCRIPTION,
TIMING............................9-229
CHAIN/TENSIONER - OPERATION,
TIMING............................9-229
CHANNEL - INSTALLATION, GLASS RUN . . 23-22,
23-31
CHANNEL - REMOVAL, GLASS RUN . 23-21,23-30
CHARGE - STANDARD PROCEDURE,
REFRIGERANT SYSTEM...............24-47
CHARGE AIR COOLER AND PLUMBING -
CLEANING..........................11-17
CHARGE AIR COOLER AND PLUMBING -
DESCRIPTION.......................11-16
CHARGE AIR COOLER AND PLUMBING -
INSPECTION........................11-17
CHARGE AIR COOLER AND PLUMBING -
INSTALLATION.......................11-17
CHARGE AIR COOLER AND PLUMBING -
OPERATION
.........................11-16
CHARGE AIR COOLER AND PLUMBING -
REMOVAL
..........................11-17
CHARGE AIR COOLER SYSTEM - LEAKS
- DIAGNOSIS AND TESTING
............11-16
CHARGING - DESCRIPTION
.............8F-19
CHARGING - OPERATION
..............8F-19
CHARGING - STANDARD PROCEDURE,
BATTERY
............................8F-8
CHARGING SYSTEM - DIAGNOSIS AND
TESTING
...........................8F-19
CHARGING SYSTEM - SPECIFICATIONS,
TORQUE - GENERATOR
................8F-20
CHART - SPECIFICATIONS, TORQUE
........5-8
CHART, SPECIFICATIONS - TORQUE
.......5-46
CHART, SPECIFICATIONS - TORQUE
.....19-19,
19-23,19-35,19-42
CHART, SPECIFICATIONS - TORQUE
. . 2-10,2-29,
2-42
CHART, SPECIFICATIONS - TORQUE
......22-13CHARTS - DIAGNOSIS AND TESTING,
DIAGNOSIS........................21-145
CHARTS - DIAGNOSIS AND TESTING,
SMOKE DIAGNOSIS...................9-236
CHECK - STANDARD PROCEDURE,
COOLANT LEVEL......................7-17
CHECK - STANDARD PROCEDURE, FLUID
LEVEL......................21-202,21-366
CHECK - STANDARD PROCEDURE, OIL
PUMP VOLUME.....................21-387
CHECK CABLE - INSTALLATION.........23-15
CHECK CABLE - REMOVAL.............23-15
CHECK GAUGES INDICATOR -
DESCRIPTION.......................8J-21
CHECK GAUGES INDICATOR -
OPERATION.........................8J-21
CHECK VALVE - DESCRIPTION...........8R-7
CHECK VALVE - INSTALLATION..........8R-8
CHECK VALVE - OPERATION.............8R-8
CHECK VALVE - REMOVAL..............8R-8
CHILD RESTRAINT ANCHOR -
DESCRIPTION.......................8O-15
CHILD RESTRAINT ANCHOR -
INSTALLATION......................8O-18
CHILD RESTRAINT ANCHOR -
OPERATION.........................8O-17
CHILD RESTRAINT ANCHOR - REMOVAL . . 8O-17
CHIME WARNING SYSTEM -
DESCRIPTION........................8B-1
CHIME WARNING SYSTEM - DIAGNOSIS
AND TESTING........................8B-3
CHIME WARNING SYSTEM - OPERATION . . . 8B-1
CIGAR LIGHTER OUTLET -
DESCRIPTION.....................8W-97-2
CIGAR LIGHTER OUTLET - DIAGNOSIS
AND TESTING.....................8W-97-2
CIGAR LIGHTER OUTLET - OPERATION . 8W-97-2
CIRCUIT - DIAGNOSIS AND TESTING,
AMBIENT TEMPERATURE SENSOR......8M-10
CIRCUIT - OPERATION, FUEL DRAIN.....14-67
CIRCUIT ACTUATION TEST MODE -
DESCRIPTION........................25-1
CIRCUIT FUNCTIONS - DESCRIPTION . . 8W-01-6
CIRCUIT INFORMATION - DESCRIPTION . 8W-01-5
CIRCUIT SENSE - DESCRIPTION,
IGNITION...........................8E-10
CIRCUIT SENSE - OPERATION, IGNITION . . 8E-11
CIRCUITS - OPERATION, NON-
MONITORED.........................25-8
CLAMPS - DESCRIPTION, HOSE...........7-3
CLAMPS - OPERATION, HOSE.............7-5
CLEANING/REVERSE FLUSHING -
STANDARD PROCEDURE, COOLING
SYSTEM............................7-17
CLEARANCE - STANDARD PROCEDURE,
CONNECTING ROD BEARING AND
CRANKSHAFT JOURNAL...............9-272
CLEARANCE - STANDARD PROCEDURE,
MAIN BEARING......................9-274
CLEARANCE LAMP - INSTALLATION, CAB . 8L-12
CLEARANCE LAMP - REMOVAL, CAB.....8L-11
CLOCKSPRING - DESCRIPTION.........8O-18
CLOCKSPRING - INSTALLATION.........8O-21
CLOCKSPRING - OPERATION...........8O-19
CLOCKSPRING - REMOVAL............8O-20
CLOCKSPRING CENTERING - STANDARD
PROCEDURE........................8O-19
CLUSTER - ASSEMBLY, INSTRUMENT....8J-15
CLUSTER - DESCRIPTION, INSTRUMENT . . . 8J-2
CLUSTER - DIAGNOSIS AND TESTING,
INSTRUMENT........................8J-10
CLUSTER - DISASSEMBLY, INSTRUMENT . . 8J-14
CLUSTER - INSTALLATION, INSTRUMENT . 8J-16
CLUSTER - OPERATION, INSTRUMENT.....8J-6
CLUSTER - REMOVAL, INSTRUMENT.....8J-14
CLUSTER BEZEL - INSTALLATION........23-49
CLUSTER BEZEL - REMOVAL...........23-49
CLUTCH - 5.9L DIESEL - DESCRIPTION,
FAN DRIVE VISCOUS...................7-52
CLUTCH - 5.9L DIESEL - OPERATION,
FAN DRIVE VISCOUS...................7-52
CLUTCH - ASSEMBLY, FRONT..........21-207
CLUTCH - ASSEMBLY, LOW/REVERSE . . . 21-385
CLUTCH - ASSEMBLY, REAR
...........21-249
CLUTCH - CLEANING, LOW/REVERSE
....21-385
CLUTCH - CLEANING, REAR
...........21-248
CLUTCH - DESCRIPTION, FRONT
.......21-205
CLUTCH - DESCRIPTION, OVERDRIVE
. . . 21-217
6 INDEXDR
Description Group-Page Description Group-Page Description Group-Page
CLUTCH - DESCRIPTION, REAR........21-247
CLUTCH - DIAGNOSIS AND TESTING.......6-1
CLUTCH - DISASSEMBLY, FRONT.......21-205
CLUTCH - DISASSEMBLY, LOW/REVERSE . 21-384
CLUTCH - DISASSEMBLY, REAR........21-248
CLUTCH - INSPECTION, FRONT........21-206
CLUTCH - INSPECTION, LOW/REVERSE . . 21-385
CLUTCH - INSPECTION, REAR.........21-248
CLUTCH - OPERATION, FRONT.........21-205
CLUTCH - OPERATION, OVERDRIVE.....21-217
CLUTCH - OPERATION, REAR..........21-248
CLUTCH - SPECIFICATIONS...............6-5
CLUTCH - WARNING....................6-1
CLUTCH AND BAND OPERATION -
DIAGNOSIS AND TESTING, AIR
TESTING TRANSMISSION.............21-144
CLUTCH ASSEMBLY - ASSEMBLY, INPUT . 21-378
CLUTCH ASSEMBLY - DESCRIPTION,
INPUT............................21-373
CLUTCH ASSEMBLY - DISASSEMBLY,
INPUT............................21-374
CLUTCH ASSEMBLY - OPERATION,
INPUT............................21-373
CLUTCH BREAK-IN - STANDARD
PROCEDURE, A/C COMPRESSOR........24-10
CLUTCH CAM/OVERDRIVE PISTON
RETAINER - ASSEMBLY,
OVERRUNNING.....................21-237
CLUTCH CAM/OVERDRIVE PISTON
RETAINER - CLEANING, OVERRUNNING. . . 21-236
CLUTCH CAM/OVERDRIVE PISTON
RETAINER - DESCRIPTION,
OVERRUNNING.....................21-236
CLUTCH CAM/OVERDRIVE PISTON
RETAINER - DISASSEMBLY,
OVERRUNNING.....................21-236
CLUTCH CAM/OVERDRIVE PISTON
RETAINER - INSPECTION,
OVERRUNNING.....................21-237
CLUTCH CAM/OVERDRIVE PISTON
RETAINER - OPERATION,
OVERRUNNING.....................21-236
CLUTCH COIL - DIAGNOSIS AND
TESTING, A/C COMPRESSOR...........24-10
CLUTCH DISC - INSTALLATION............6-5
CLUTCH DISC - REMOVAL...............6-5
CLUTCH HOUSING - DIAGNOSIS AND
TESTING.............................6-7
CLUTCH HOUSING - INSTALLATION........6-9
CLUTCH HOUSING - REMOVAL............6-9
CLUTCH OPERATION - DIAGNOSIS AND
TESTING, AIR CHECKING
TRANSMISSION.....................21-317
CLUTCH PEDAL POSITION SWITCH -
DESCRIPTION........................6-13
CLUTCH PEDAL POSITION SWITCH -
DIAGNOSIS AND TESTING..............6-13
CLUTCH PEDAL POSITION SWITCH -
OPERATION..........................6-13
CLUTCH RELAY - DESCRIPTION, A/C
COMPRESSOR.......................24-13
CLUTCH RELAY - INSTALLATION, A/C
COMPRESSOR.......................24-14
CLUTCH RELAY - OPERATION, A/C
COMPRESSOR.......................24-13
CLUTCH RELAY - REMOVAL, A/C
COMPRESSOR.......................24-14
CLUTCH RELEASE BEARING -
INSTALLATION........................6-10
CLUTCH RELEASE BEARING - REMOVAL....6-9
CLUTCH/COIL - DESCRIPTION, A/C
COMPRESSOR........................24-9
CLUTCH/COIL - INSPECTION, A/C
COMPRESSOR.......................24-11
CLUTCH/COIL - INSTALLATION, A/C
COMPRESSOR.......................24-12
CLUTCH/COIL - OPERATION, A/C
COMPRESSOR........................24-9
CLUTCH/COIL - REMOVAL, A/C
COMPRESSOR.......................24-10
CLUTCHES - DESCRIPTION, HOLDING . . . 21-371
CLUTCHES - OPERATION, HOLDING
.....21-372
CLUTCH-GAS ENGINES - DESCRIPTION,
FAN DRIVE VISCOUS
...................7-50
CLUTCH-GAS ENGINES - OPERATION,
FAN DRIVE VISCOUS
...................7-50
COAT HOOK - INSTALLATION
...........23-66
COAT HOOK - REMOVAL
...............23-66CODE - DESCRIPTION, PAINT...........23-73
CODE PLATE - DESCRIPTION, BODY....Intro.-3
CODES - DESCRIPTION, DIAGNOSTIC
TROUBLE............................25-1
CODES - SPECIFICATIONS, PAINT........23-73
CODES - STANDARD PROCEDURE,
ERASING TRANSMITTER..............8M-12
CODES - STANDARD PROCEDURE,
SETTING TRANSMITTER..............8M-12
COIL - DESCRIPTION, IGNITION.........8I-11
COIL - DIAGNOSIS AND TESTING, A/C
COMPRESSOR CLUTCH...............24-10
COIL - INSTALLATION, IGNITION.........8I-14
COIL - OPERATION, IGNITION...........8I-12
COIL - REMOVAL, IGNITION............8I-13
COIL CAPACITOR - DESCRIPTION,
IGNITION...........................8I-21
COIL CAPACITOR - INSTALLATION,
IGNITION...........................8I-21
COIL CAPACITOR - OPERATION,
IGNITION...........................8I-21
COIL CAPACITOR - REMOVAL, IGNITION . . . 8I-21
COIL RESISTANCE, 3.7L V-6 - IGNITION....8I-5
COIL RESISTANCE, 4.7L V-8 - IGNITION....8I-5
COIL RESISTANCE, 5.7L V-8 - IGNITION....8I-5
COLUMN - DESCRIPTION...............19-6
COLUMN - DIAGNOSIS AND TESTING,
STEERING...........................19-7
COLUMN - INSTALLATION...............19-9
COLUMN - REMOVAL..................19-7
COLUMN OPENING COVER -
INSTALLATION, STEERING.............23-60
COLUMN OPENING COVER - REMOVAL,
STEERING..........................23-60
COLUMN OPENING SUPPORT BRACKET
- INSTALLATION, STEERING............23-60
COLUMN OPENING SUPPORT BRACKET
- REMOVAL, STEERING................23-60
COMBUSTION PRESSURE LEAKAGE -
DIAGNOSIS AND TESTING, CYLINDER....9-186,
9-8,9-93
COMMUNICATION - DESCRIPTION........8E-1
COMMUNICATION - OPERATION..........8E-2
COMPASS CALIBRATION - STANDARD
PROCEDURE.........................8M-3
COMPASS DEMAGNETIZING -
STANDARD PROCEDURE...............8M-4
COMPASS MINI-TRIP COMPUTER -
DIAGNOSIS AND TESTING..............8M-6
COMPASS VARIATION ADJUSTMENT -
STANDARD PROCEDURE...............8M-5
COMPASS/MINI-TRIP COMPUTER -
DESCRIPTION........................8M-6
COMPASS/MINI-TRIP COMPUTER -
INSTALLATION.......................8M-6
COMPASS/MINI-TRIP COMPUTER -
OPERATION.........................8M-6
COMPASS/MINI-TRIP COMPUTER -
REMOVAL...........................8M-6
COMPRESSION PRESSURE - DIAGNOSIS
AND TESTING, CYLINDER.......9-186,9-8,9-93
COMPRESSION/LEAKAGE TESTS -
DIAGNOSIS AND TESTING, CYLINDER....9-239
COMPRESSOR - DESCRIPTION, A/C
......24-48
COMPRESSOR - DIAGNOSIS AND
TESTING, A/C
.......................24-49
COMPRESSOR - OPERATION, A/C
........24-48
COMPRESSOR CLUTCH BREAK-IN -
STANDARD PROCEDURE, A/C
...........24-10
COMPRESSOR CLUTCH COIL -
DIAGNOSIS AND TESTING, A/C
..........24-10
COMPRESSOR CLUTCH RELAY -
DESCRIPTION, A/C
...................24-13
COMPRESSOR CLUTCH RELAY -
INSTALLATION, A/C
...................24-14
COMPRESSOR CLUTCH RELAY -
OPERATION, A/C
.....................24-13
COMPRESSOR CLUTCH RELAY -
REMOVAL, A/C
......................24-14
COMPRESSOR CLUTCH/COIL -
DESCRIPTION, A/C
....................24-9
COMPRESSOR CLUTCH/COIL -
INSPECTION, A/C
.....................24-11
COMPRESSOR CLUTCH/COIL -
INSTALLATION, A/C
...................24-12
COMPRESSOR CLUTCH/COIL -
OPERATION, A/C
......................24-9COMPRESSOR CLUTCH/COIL -
REMOVAL, A/C......................24-10
COMPUTER - DESCRIPTION, COMPASS/
MINI-TRIP..........................8M-6
COMPUTER - DIAGNOSIS AND TESTING,
COMPASS MINI-TRIP..................8M-6
COMPUTER - INSTALLATION, COMPASS/
MINI-TRIP..........................8M-6
COMPUTER - OPERATION, COMPASS/
MINI-TRIP..........................8M-6
COMPUTER - REMOVAL, COMPASS/
MINI-TRIP..........................8M-6
CONDENSER - DESCRIPTION, A/C.......24-52
CONDENSER - OPERATION, A/C.........24-52
CONDITIONER - DESCRIPTION, HEATER
AND AIR ............................24-1
CONDITIONER - OPERATION, HEATER
AND AIR ............................24-1
CONNECTING ROD - CLEANING, PISTON . . 9-282
CONNECTING ROD - CLEANING, PISTON . . 9-140,
9-212
CONNECTING ROD - DESCRIPTION,
PISTON..............9-139,9-211,9-281,9-48
CONNECTING ROD - INSPECTION........9-283
CONNECTING ROD - INSPECTION,
PISTON.......................9-140,9-213
CONNECTING ROD - INSTALLATION,
PISTON.......................9-140,9-213
CONNECTING ROD - REMOVAL, PISTON . . 9-139,
9-212,9-281
CONNECTING ROD BEARING AND
CRANKSHAFT JOURNAL CLEARANCE -
STANDARD PROCEDURE................9-272
CONNECTING ROD BEARING FITTING -
STANDARD PROCEDURE...............9-129
CONNECTING ROD BEARING FITTING,
STANDARD PROCEDURE................9-49
CONNECTOR - DESCRIPTION, DATA LINK . . 8E-3
CONNECTOR - INSTALLATION.......8W-01-11
CONNECTOR - OPERATION, DATA LINK....8E-3
CONNECTOR - REMOVAL...........8W-01-11
CONNECTOR, GROUND AND SPLICE
INFORMATION - DESCRIPTION........8W-01-7
CONNECTOR/GROUND/SPLICE LOCATION
- DESCRIPTION....................8W-91-1
CONSOLE - DESCRIPTION, OVERHEAD....8M-1
CONSOLE - DIAGNOSIS AND TESTING,
OVERHEAD..........................8M-2
CONSOLE - INSTALLATION, FLOOR......23-67
CONSOLE - OPERATION, OVERHEAD......8M-2
CONSOLE - REMOVAL, FLOOR..........23-67
CONSOLE REMOVAL, REMOVAL -
OVERHEAD..........................8M-6
CONTAINER- GAS ENGINES -
DESCRIPTION, COOLANT RECOVERY......7-33
CONTAINER- GAS ENGINES -
INSTALLATION, COOLANT RECOVERY.....7-33
CONTAINER- GAS ENGINES -
OPERATION, COOLANT RECOVERY........7-33
CONTAINER- GAS ENGINES - REMOVAL,
COOLANT RECOVERY..................7-33
CONTAMINATION - DIAGNOSIS AND
TESTING, BRAKE FLUID................5-23
CONTAMINATION - DIAGNOSIS AND
TESTING, FLUID..............21-202,21-366
CONTINUITY - STANDARD PROCEDURE,
TESTING.........................8W-01-9
CONTROL ACTUATOR - DESCRIPTION,
FUEL..............................14-74
CONTROL ACTUATOR - OPERATION,
FUEL..............................14-74
CONTROL ACTUATOR - REMOVAL, FUEL . . 14-74
CONTROL ARM - INSTALLATION, UPPER . . . 2-28
CONTROL ARM - REMOVAL, UPPER......2-28
CONTROL ARM BUSHINGS - 2WD (LD) -
INSTALLATION, LOWER.................2-15
CONTROL ARM BUSHINGS - 2WD (LD) -
REMOVAL, LOWER....................2-13
CONTROL ARM BUSHINGS - 4WD (LD) -
INSTALLATION, LOWER
.................2-14
CONTROL ARM BUSHINGS - 4WD (LD) -
REMOVAL, LOWER
....................2-13
CONTROL CABLE - INSTALLATION,
THROTTLE
.....................14-40,14-84
CONTROL CABLE - REMOVAL,
THROTTLE
.....................14-38,14-83
CONTROL INFORMATION (VECI) -
DESCRIPTION, VEHICLE EMISSION
.....Intro.-2
DRINDEX 7
Description Group-Page Description Group-Page Description Group-Page
CONTROL MODULE - DESCRIPTION,
AIRBAG............................8O-11
CONTROL MODULE - DESCRIPTION,
FRONT...........................8W-97-5
CONTROL MODULE - DESCRIPTION,
FRONT..............................8E-5
CONTROL MODULE - DESCRIPTION,
TRANSFER CASE.....................8E-16
CONTROL MODULE - DESCRIPTION,
TRANSMISSION......................8E-20
CONTROL MODULE - DIAGNOSIS AND
TESTING, FRONT...................8W-97-5
CONTROL MODULE - DIAGNOSIS AND
TESTING, FRONT......................8E-5
CONTROL MODULE - INSTALLATION,
AIRBAG............................8O-13
CONTROL MODULE - INSTALLATION,
ENGINE.............................8E-4
CONTROL MODULE - INSTALLATION,
FRONT...........................8W-97-6
CONTROL MODULE - INSTALLATION,
FRONT..............................8E-5
CONTROL MODULE - OPERATION,
AIRBAG............................8O-11
CONTROL MODULE - OPERATION,
FRONT...........................8W-97-5
CONTROL MODULE - OPERATION,
FRONT..............................8E-5
CONTROL MODULE - OPERATION,
TRANSFER CASE.....................8E-16
CONTROL MODULE - OPERATION,
TRANSMISSION......................8E-20
CONTROL MODULE - REMOVAL, AIRBAG . 8O-12
CONTROL MODULE - REMOVAL, ENGINE . . . 8E-4
CONTROL MODULE - REMOVAL, FRONT . 8W-97-6
CONTROL MODULE - REMOVAL, FRONT . . . 8E-5
CONTROL MOTOR - DESCRIPTION, IDLE
AIR ...............................14-28
CONTROL MOTOR - INSTALLATION, IDLE
AIR ...............................14-29
CONTROL MOTOR - OPERATION, IDLE
AIR ...............................14-28
CONTROL MOTOR - REMOVAL, IDLE AIR . . 14-29
CONTROL RELAY - DESCRIPTION,
TRANSMISSION.....................21-405
CONTROL RELAY - OPERATION,
TRANSMISSION.....................21-405
CONTROL SWITCH - DESCRIPTION,
LUMBAR...........................8N-17
CONTROL SWITCH - OPERATION,
LUMBAR...........................8N-18
CONTROL SWITCH - REMOVAL,
LUMBAR...........................8N-18
CONTROLLED VISCOUS FAN DRIVE -
DIAGNOSIS AND TESTING,
ELECTRONICALLY.....................7-52
CONTROLLER ANTILOCK BRAKE -
DESCRIPTION........................8E-3
CONTROLLER ANTILOCK BRAKE -
INSTALLATION........................8E-3
CONTROLLER ANTILOCK BRAKE -
OPERATION..........................8E-3
CONTROLLER ANTILOCK BRAKE -
REMOVAL...........................8E-3
CONTROLS - DIAGNOSIS AND TESTING,
OVERDRIVE ELECTRICAL.............21-262
CONVERTER - DESCRIPTION, CATALYTIC
. . . 11-6
CONVERTER - DESCRIPTION, TORQUE
. . 21-255,
21-399
CONVERTER - INSTALLATION, TORQUE
. . 21-260,
21-404
CONVERTER - OPERATION, CATALYTIC
....11-6
CONVERTER - OPERATION, TORQUE
....21-259,
21-403
CONVERTER - REMOVAL, TORQUE
.....21-260,
21-404
CONVERTER DRAINBACK VALVE -
DESCRIPTION, TORQUE
..............21-261
CONVERTER DRAINBACK VALVE -
OPERATION, TORQUE
................21-261
CONVERTER DRAINBACK VALVE -
STANDARD PROCEDURE, TORQUE
......21-261
CONVERTER HOUSING FLUID LEAK -
DIAGNOSIS AND TESTING
......21-144,21-318
COOLANT - DESCRIPTION, ENGINE
.......7-31
COOLANT - DESCRIPTION, ENGINE
........0-3
COOLANT - DESCRIPTION, HOAT
.........7-32COOLANT - STANDARD PROCEDURE,
ADDING ADDITIONAL..................7-19
COOLANT FLOW - DIAGNOSIS AND
TESTING, RADIATOR...............7-54,7-56
COOLANT LEVEL CHECK - STANDARD
PROCEDURE.........................7-17
COOLANT RECOVERY CONTAINER- GAS
ENGINES - DESCRIPTION...............7-33
COOLANT RECOVERY CONTAINER- GAS
ENGINES - INSTALLATION...............7-33
COOLANT RECOVERY CONTAINER- GAS
ENGINES - OPERATION.................7-33
COOLANT RECOVERY CONTAINER- GAS
ENGINES - REMOVAL..................7-33
COOLANT TEMPERATURE SENSOR -
DESCRIPTION, ENGINE.................7-38
COOLANT TEMPERATURE SENSOR -
INSTALLATION, ENGINE................7-41
COOLANT TEMPERATURE SENSOR -
OPERATION, ENGINE...................7-38
COOLANT TEMPERATURE SENSOR -
REMOVAL, ENGINE....................7-39
COOLANT THERMOSTAT - 3.7L/4.7L -
DESCRIPTION, ENGINE.................7-44
COOLANT THERMOSTAT - 3.7L/4.7L -
INSTALLATION, ENGINE................7-45
COOLANT THERMOSTAT - 3.7L/4.7L -
OPERATION, ENGINE...................7-44
COOLANT THERMOSTAT - 3.7L/4.7L -
REMOVAL, ENGINE....................7-45
COOLANT THERMOSTAT - 5.9L DIESEL -
DESCRIPTION, ENGINE.................7-46
COOLANT THERMOSTAT - 5.9L DIESEL -
INSTALLATION, ENGINE..................7-47
COOLANT THERMOSTAT - 5.9L DIESEL -
OPERATION, ENGINE...................7-46
COOLANT THERMOSTAT - 5.9L DIESEL -
REMOVAL, ENGINE....................7-47
COOLANT THERMOSTAT - 8.0L -
DESCRIPTION, ENGINE.................7-48
COOLANT THERMOSTAT - 8.0L -
INSTALLATION, ENGINE................7-49
COOLANT THERMOSTAT - 8.0L -
OPERATION, ENGINE...................7-48
COOLANT THERMOSTAT - 8.0L -
REMOVAL, ENGINE....................7-49
COOLANT THERMOSTAT-5.7L -
DESCRIPTION, ENGINE.................7-41
COOLANT THERMOSTAT-5.7L -
INSTALLATION, ENGINE................7-43
COOLANT THERMOSTAT-5.7L -
OPERATION, ENGINE...................7-41
COOLANT THERMOSTAT-5.7L -
REMOVAL, ENGINE....................7-42
COOLER - 5.9L DIESEL - DESCRIPTION,
TRANS..............................7-68
COOLER - 5.9L DIESEL - OPERATION,
TRANS..............................7-69
COOLER - DESCRIPTION, TRANS.........7-67
COOLER - INSTALLATION, AIR TO OIL.....7-70
COOLER - INSTALLATION, FLUID........19-43
COOLER - INSTALLATION, RETURN
HOSE - GEAR TO................19-44,19-45
COOLER - INSTALLATION, RETURN
HOSE - RESERVOIR TO...........19-44,19-45
COOLER - INSTALLATION, TRANS........7-68
COOLER - INSTALLATION, WATER-TO-
AIR
................................7-70
COOLER - OPERATION, TRANS
...........7-67
COOLER - REMOVAL, AIR TO OIL
.........7-69
COOLER - REMOVAL, FLUID
............19-43
COOLER - REMOVAL, RETURN HOSE -
GEAR TO
......................19-44,19-45
COOLER - REMOVAL, RETURN HOSE -
RESERVOIR TO
.................19-44,19-45
COOLER - REMOVAL, TRANS
............7-68
COOLER - REMOVAL, WATER TO OIL
......7-69
COOLER AND PLUMBING - CLEANING,
CHARGE AIR
........................11-17
COOLER AND PLUMBING -
DESCRIPTION, CHARGE AIR
............11-16
COOLER AND PLUMBING - INSPECTION,
CHARGE AIR
........................11-17
COOLER AND PLUMBING -
INSTALLATION, CHARGE AIR
...........11-17
COOLER AND PLUMBING - OPERATION,
CHARGE AIR
........................11-16COOLER AND PLUMBING - REMOVAL,
CHARGE AIR........................11-17
COOLER SYSTEM - LEAKS - DIAGNOSIS
AND TESTING, CHARGE AIR............11-16
COOLING, SPECIAL TOOLS..............7-20
COOLING SYSTEM - ALL GAS ENGINES -
STANDARD PROCEDURE, DRAINING......7-17
COOLING SYSTEM - ALL GAS ENGINES -
STANDARD PROCEDURE, REFILLING......7-18
COOLING SYSTEM - OPERATION..........7-5
COOLING SYSTEM - TESTING FOR
LEAKS - DIAGNOSIS AND TESTING........7-5
COOLING SYSTEM 5.9L DIESEL ENGINE
- STANDARD PROCEDURE, DRAINING.....7-18
COOLING SYSTEM 5.9L DIESEL ENGINE
- STANDARD PROCEDURE, REFILLING.....7-19
COOLING SYSTEM CLEANING/REVERSE
FLUSHING - STANDARD PROCEDURE.....7-17
COOLING SYSTEM DIESEL ENGINE -
DIAGNOSIS AND TESTING...............7-7
COOLING SYSTEM FLOW - 5.9L DIESEL
- DESCRIPTION........................7-3
COOLING SYSTEM FLOW 3.7L/4.7L/5.7L
ENGINE - DESCRIPTION.................7-1
COOLING SYSTEM REQUIREMENTS -
DESCRIPTION, ENGINE.................24-1
COOLING SYSTEM, WARNING - ENGINE . . 24-42
CORE - DESCRIPTION, HEATER.........24-63
CORE - DESCRIPTION, SERVICE PORT
VALVE .............................24-70
CORE - INSTALLATION, HEATER.........24-63
CORE - INSTALLATION, SERVICE PORT
VALVE .............................24-70
CORE - OPERATION, HEATER...........24-63
CORE - REMOVAL, HEATER............24-63
CORE HOLE PLUG - INSTALLATION,
CAMSHAFT.........................9-206
CORE HOLE PLUG - REMOVAL,
CAMSHAFT.........................9-205
CORE PLUGS - INSTALLATION..........9-131
CORE PLUGS - REMOVAL..............9-131
CORES - REMOVAL, SERVICE PORT
VALVE .............................24-70
COUPLER - DESCRIPTION,
REFRIGERANT LINE...................24-67
COUPLER - INSTALLATION,
REFRIGERANT LINE...................24-68
COUPLER - OPERATION, REFRIGERANT
LINE...............................24-67
COUPLER - REMOVAL, REFRIGERANT
LINE...............................24-68
COUPLING - INSTALLATION, UPPER
STEERING..........................19-13
COUPLING - REMOVAL, UPPER
STEERING..........................19-13
COVER - DESCRIPTION, STRUCTURAL . . . 9-145,
9-216,9-57
COVER - FRONT - INSTALLATION, SEAT
BACK CUSHION......................23-82
COVER - FRONT - INSTALLATION, SEAT
CUSHION...........................23-83
COVER - FRONT - REMOVAL, SEAT BACK
CUSHION...........................23-82
COVER - FRONT - REMOVAL, SEAT
CUSHION...........................23-83
COVER - INSTALLATION...............23-16
COVER - INSTALLATION, ACM
..........8O-10
COVER - INSTALLATION, CENTER SEAT
BACK INERTIA HINGE
.................23-77
COVER - INSTALLATION, CENTER SEAT
CUSHION
...........................23-79
COVER - INSTALLATION, CYLINDER
HEAD
..............................9-255
COVER - INSTALLATION, DIFFERENTIAL
....3-97
COVER - INSTALLATION, GEAR HOUSING
. 9-301
COVER - INSTALLATION, INSTRUMENT
PANEL TOP
.........................23-59
COVER - INSTALLATION, REAR DOOR
SILL TRIM
..........................23-71
COVER - INSTALLATION, SHIFT
. . . 21-129,21-87
COVER - INSTALLATION, STEERING
COLUMN OPENING
...................23-60
COVER - INSTALLATION, STRUCTURAL
. . . 9-145,
9-216,9-57
COVER - INSTALLATION, TIMING/CHAIN
. . 9-227
COVER - OPERATION, STRUCTURAL
.....9-145,
9-216,9-57
8 INDEXDR
Description Group-Page Description Group-Page Description Group-Page
DEPLOYMENT - STANDARD
PROCEDURE, SERVICE AFTER A
SUPPLEMENTAL RESTRAINT............8O-7
DETECTION ASSY - DESCRIPTION,
NATURAL VAC LEAK..................25-23
DETECTION ASSY - INSTALLATION,
NATURAL VAC LEAK..................25-25
DETECTION ASSY - OPERATION,
NATURAL VAC LEAK..................25-23
DETECTION ASSY - REMOVAL, NATURAL
VAC LEAK..........................25-24
DETECTION PUMP - DESCRIPTION, LEAK . 25-13
DETECTION PUMP - INSTALLATION,
LEAK..............................25-16
DETECTION PUMP - OPERATION, LEAK . . . 25-14
DETECTION PUMP - REMOVAL, LEAK....25-16
DEVICES - STANDARD PROCEDURE,
ELECTROSTATIC DISCHARGE (ESD)
SENSITIVE........................8W-01-8
DIAGNOSTIC TROUBLE CODES -
DESCRIPTION........................25-1
DIAGNOSTICS (OBD) - DIAGNOSIS AND
TESTING, ON-BOARD...................7-5
DIAGRAMS - DESCRIPTION, HOW TO
USE WIRING......................8W-01-1
DIAGRAMS - HYDRAULIC SCHEMATICS,
SCHEMATICS.................21-176,21-337
DIESEL - CLEANING, RADIATOR - 5.9L....7-56
DIESEL - CLEANING, RADIATOR FAN -
5.9L................................7-35
DIESEL - CLEANING, WATER PUMP -
5.9L................................7-62
DIESEL - DESCRIPTION.................14-62
DIESEL - DESCRIPTION, 5.9L............11-3
DIESEL - DESCRIPTION, BELT
TENSIONER - 5.9L.....................7-23
DIESEL - DESCRIPTION, COOLING
SYSTEM FLOW - 5.9L...................7-3
DIESEL - DESCRIPTION, ENGINE 5.9L....9-232
DIESEL - DESCRIPTION, ENGINE BLOCK
HEATER - 5.9L........................7-37
DIESEL - DESCRIPTION, ENGINE
COOLANT THERMOSTAT - 5.9L...........7-46
DIESEL - DESCRIPTION, FAN DRIVE
VISCOUS CLUTCH - 5.9L...............7-52
DIESEL - DESCRIPTION, RADIATOR -
5.9L................................7-56
DIESEL - DESCRIPTION, TRANS COOLER
- 5.9L..............................7-68
DIESEL - DESCRIPTION, WATER PUMP -
5.9L................................7-62
DIESEL - FUEL INJECTOR FIRING ORDER . 14-48
DIESEL - INSPECTION, RADIATOR - 5.9L . . . 7-56
DIESEL - INSPECTION, RADIATOR FAN -
5.9L................................7-35
DIESEL - INSPECTION, TAILPIPE - 5.9L . . . 11-10
DIESEL - INSPECTION, WATER PUMP -
5.9L................................7-62
DIESEL - INSTALLATION................11-8
DIESEL - INSTALLATION...............14-62
DIESEL - INSTALLATION.....19-26,19-31,19-42
DIESEL - INSTALLATION, BELT
TENSIONER - 5.9L.....................7-24
DIESEL - INSTALLATION, DRIVE BELT -
5.9L
................................7-29
DIESEL - INSTALLATION, ENGINE BLOCK
HEATER - 5.9L
........................7-38
DIESEL - INSTALLATION, ENGINE
COOLANT THERMOSTAT - 5.9L
...........7-47
DIESEL - INSTALLATION, EXCEPT
........14-19
DIESEL - INSTALLATION, MUFFLER -
5.9L
...............................11-10
DIESEL - INSTALLATION, RADIATOR -
5.9L
................................7-57
DIESEL - INSTALLATION, RADIATOR FAN
- 5.9L
..............................7-36
DIESEL - INSTALLATION, TAILPIPE - 5.9L
. 11-11
DIESEL - INSTALLATION, WATER PUMP -
5.9L
................................7-62
DIESEL - MAINTENANCE SCHEDULES,
24-VALVE CUMMINS TURBO
.............0-12
DIESEL - OPERATION, BELT TENSIONER
- 5.9L
..............................7-23
DIESEL - OPERATION, ENGINE BLOCK
HEATER - 5.9L
........................7-38
DIESEL - OPERATION, ENGINE COOLANT
THERMOSTAT - 5.9L
...................7-46DIESEL - OPERATION, FAN DRIVE
VISCOUS CLUTCH - 5.9L...............7-52
DIESEL - OPERATION, RADIATOR - 5.9L . . . 7-56
DIESEL - OPERATION, TRANS COOLER -
5.9L................................7-69
DIESEL - OPERATION, WATER PUMP -
5.9L................................7-62
DIESEL - REMOVAL....................11-7
DIESEL - REMOVAL...................14-62
DIESEL - REMOVAL.........19-25,19-30,19-41
DIESEL - REMOVAL, BELT TENSIONER -
5.9L................................7-23
DIESEL - REMOVAL, DRIVE BELT - 5.9L....7-29
DIESEL - REMOVAL, ENGINE BLOCK
HEATER - 5.9L........................7-38
DIESEL - REMOVAL, ENGINE COOLANT
THERMOSTAT - 5.9L...................7-47
DIESEL - REMOVAL, EXCEPT...........14-17
DIESEL - REMOVAL, MUFFLER - 5.9L.....11-10
DIESEL - REMOVAL, RADIATOR - 5.9L.....7-56
DIESEL - REMOVAL, RADIATOR FAN -
5.9L................................7-35
DIESEL - REMOVAL, TAILPIPE - 5.9L.....11-10
DIESEL - REMOVAL, WATER PUMP -
5.9L................................7-62
DIESEL - SPECIFICATIONS, 5.9L.........9-244
DIESEL - TORQUE, FUEL SYSTEM -
EXCEPT.............................14-3
DIESEL ENGINE - DESCRIPTION, FUEL
REQUIREMENTS.......................0-1
DIESEL ENGINE - DIAGNOSIS AND
TESTING............................11-5
DIESEL ENGINE - DIAGNOSIS AND
TESTING, COOLING SYSTEM.............7-7
DIESEL ENGINE - INSTALLATION........8R-17
DIESEL ENGINE - INSTALLATION, 5.9L . . . 24-54,
24-58,24-72
DIESEL ENGINE - INSTALLATION,
EXCEPT............................8R-17
DIESEL ENGINE - REMOVAL............8R-16
DIESEL ENGINE - REMOVAL, 5.9L . . 24-53,24-56,
24-70
DIESEL ENGINE - REMOVAL, EXCEPT....8R-15
DIESEL ENGINE - STANDARD
PROCEDURE, DRAINING COOLING
SYSTEM 5.9L........................7-18
DIESEL ENGINE - STANDARD
PROCEDURE, REFILLING COOLING
SYSTEM 5.9L........................7-19
DIESEL ENGINE - TORQUE, FUEL
SYSTEM............................14-48
DIESEL ENGINE, SPECIAL TOOLS - 5.9L . . 9-246
DIESEL ENGINES - DESCRIPTION,
ENGINE OIL...........................0-2
DIESEL FUEL SYSTEM - DESCRIPTION . . . 14-45
DIESEL FUEL SYSTEM, SPECIAL TOOLS . . 14-49
DIESEL ONLY - ASSEMBLY, 5.9L..........7-70
DIESEL ONLY - DISASSEMBLY, 5.9L.......7-70
DIFFERENTIAL - ASSEMBLY . . . 3-129,3-156,3-47,
3-73,3-99
DIFFERENTIAL - DISASSEMBLY....3-128,3-155,
3-47,3-72,3-98
DIFFERENTIAL - INSTALLATION....3-130,3-157,
3-48,3-74,3-99
DIFFERENTIAL - REMOVAL
. . . 3-127,3-155,3-46,
3-72,3-97
DIFFERENTIAL CASE BEARINGS -
INSTALLATION
....3-106,3-134,3-161,3-48,3-75
DIFFERENTIAL CASE BEARINGS -
REMOVAL
........3-105,3-134,3-161,3-48,3-75
DIFFERENTIAL COVER - INSTALLATION
....3-97
DIFFERENTIAL COVER - REMOVAL
........3-97
DIFFERENTIAL TRAC-RITE - ASSEMBLY
. . 3-133,
3-161
DIFFERENTIAL TRAC-RITE - CLEANING
. . . 3-132,
3-160
DIFFERENTIAL TRAC-RITE -
DESCRIPTION
..................3-131,3-158
DIFFERENTIAL TRAC-RITE -
DISASSEMBLY
..................3-131,3-158
DIFFERENTIAL TRAC-RITE - INSPECTION
. 3-132,
3-160
DIFFERENTIAL TRAC-RITE - OPERATION
. . 3-131,
3-158
DIFFERENTIAL-TRAC-LOK - ASSEMBLY
. . . 3-103
DIFFERENTIAL-TRAC-LOK -
DESCRIPTION
.......................3-100DIFFERENTIAL-TRAC-LOK - DIAGNOSIS
AND TESTING.......................3-100
DIFFERENTIAL-TRAC-LOK -
DISASSEMBLY.......................3-101
DIFFERENTIAL-TRAC-LOK - OPERATION . . . 3-100
DIMENSIONS - SPECIFICATIONS, BODY
OPENING...........................23-99
DIMENSIONS - SPECIFICATIONS, FRAME . . 13-16
DIODE - INSTALLATION............8W-01-14
DIODE - REMOVAL................8W-01-14
DIODE REPLACEMENT - STANDARD
PROCEDURE........................24-45
DISC - INSTALLATION, CLUTCH...........6-5
DISC - REMOVAL, CLUTCH...............6-5
DISC BRAKE CALIPER ADAPTER MOUNT
- INSTALLATION......................5-22
DISC BRAKE CALIPERS - DESCRIPTION....5-16
DISC BRAKE CALIPERS - OPERATION.....5-16
DISC BRAKE ROTOR, DIAGNOSIS AND
TESTING............................5-32
DISCHARGE (ESD) SENSITIVE DEVICES -
STANDARD PROCEDURE,
ELECTROSTATIC...................8W-01-8
DISCHARGE LINE - DESCRIPTION, A/C....24-56
DISPLAY TEST MODE - DESCRIPTION,
STATE ..............................25-1
DISTRIBUTION - DESCRIPTION, POWER . 8W-97-1
DISTRIBUTION - OPERATION, POWER . . 8W-97-1
DISTRIBUTION DUCT - INSTALLATION,
FLOOR.............................24-34
DISTRIBUTION DUCT - REMOVAL,
FLOOR.............................24-33
DISTRIBUTION SYSTEMS, SPECIAL
TOOLS - POWER...................8W-97-2
DOME LAMP - DESCRIPTION...........8L-26
DOME LAMP - INSTALLATION..........8L-26
DOME LAMP - OPERATION.............8L-26
DOME LAMP - REMOVAL..............8L-26
DOOR - INSTALLATION...........23-18,23-28
DOOR - INSTALLATION, BLEND.........24-27
DOOR - INSTALLATION, DEFROST.......24-31
DOOR - INSTALLATION, FUEL FILL.......23-39
DOOR - INSTALLATION, MODE..........24-38
DOOR - INSTALLATION, RECIRCULATION . . 24-40
DOOR - REMOVAL...............23-18,23-28
DOOR - REMOVAL, BLEND.............24-27
DOOR - REMOVAL, DEFROST...........24-31
DOOR - REMOVAL, FUEL FILL..........23-39
DOOR - REMOVAL, MODE..............24-38
DOOR - REMOVAL, RECIRCULATION.....24-39
DOOR ACTUATOR - DESCRIPTION,
BLEND.............................24-17
DOOR ACTUATOR - DESCRIPTION,
DEFROST...........................24-20
DOOR ACTUATOR - DESCRIPTION,
MODE.............................24-23
DOOR ACTUATOR - DESCRIPTION,
RECIRCULATION.....................24-24
DOOR ACTUATOR - INSTALLATION,
BLEND.............................24-18
DOOR ACTUATOR - INSTALLATION,
DEFROST...........................24-21
DOOR ACTUATOR - INSTALLATION,
MODE.............................24-23
DOOR ACTUATOR - INSTALLATION,
RECIRCULATION.....................24-25
DOOR ACTUATOR - OPERATION, BLEND . . 24-17
DOOR ACTUATOR - OPERATION,
DEFROST...........................24-21
DOOR ACTUATOR - OPERATION, MODE . . . 24-23
DOOR ACTUATOR - OPERATION,
RECIRCULATION
.....................24-24
DOOR ACTUATOR - REMOVAL, BLEND
....24-17
DOOR ACTUATOR - REMOVAL, DEFROST
. . 24-21
DOOR ACTUATOR - REMOVAL, MODE
....24-23
DOOR ACTUATOR - REMOVAL,
RECIRCULATION
.....................24-24
DOOR AJAR INDICATOR - DESCRIPTION
. . 8J-23
DOOR AJAR INDICATOR - OPERATION
....8J-23
DOOR AJAR SWITCH - DESCRIPTION
....8L-27
DOOR AJAR SWITCH - OPERATION
......8L-27
DOOR GLASS - INSTALLATION
.....23-20,23-30
DOOR GLASS - REMOVAL
........23-20,23-30
DOOR GLASS RUN WEATHERSTRIP -
INSTALLATION, FRONT
................23-92
DOOR GLASS RUN WEATHERSTRIP -
INSTALLATION, REAR
.................23-93
10 INDEXDR
Description Group-Page Description Group-Page Description Group-Page
DOOR GLASS RUN WEATHERSTRIP -
REMOVAL, FRONT....................23-92
DOOR GLASS RUN WEATHERSTRIP -
REMOVAL, REAR.....................23-93
DOOR INNER BELT MOLDING -
INSTALLATION, FRONT................23-93
DOOR INNER BELT MOLDING -
INSTALLATION, REAR.................23-94
DOOR INNER BELT MOLDING -
REMOVAL, FRONT....................23-93
DOOR INNER BELT MOLDING -
REMOVAL, REAR.....................23-94
DOOR LOCK MOTOR - DESCRIPTION......8N-4
DOOR LOCK MOTOR - DIAGNOSIS AND
TESTING............................8N-4
DOOR LOCK MOTOR - OPERATION.......8N-4
DOOR MODULE - DESCRIPTION, DRIVER . . 8N-5
DOOR MODULE - DIAGNOSIS AND
TESTING, DRIVER.....................8N-6
DOOR MODULE - INSTALLATION,
DRIVER.............................8N-7
DOOR MODULE - OPERATION, DRIVER....8N-5
DOOR MODULE - REMOVAL, DRIVER.....8N-7
DOOR OPENING SEAL - INSTALLATION . . . 23-92
DOOR OPENING SEAL - REMOVAL.......23-92
DOOR OUTER BELT MOLDING -
INSTALLATION, FRONT................23-93
DOOR OUTER BELT MOLDING -
INSTALLATION, REAR.................23-94
DOOR OUTER BELT MOLDING -
REMOVAL, FRONT....................23-92
DOOR OUTER BELT MOLDING -
REMOVAL, REAR.....................23-93
DOOR SILL TRIM COVER -
INSTALLATION, REAR.................23-71
DOOR SILL TRIM COVER - REMOVAL,
REAR..............................23-71
DOUBLE CARDAN UNIVERSAL JOINTS -
ASSEMBLY..........................3-17
DOUBLE CARDAN UNIVERSAL JOINTS -
DISASSEMBLY........................3-16
DOUBLE INVERTED FLARING -
STANDARD PROCEDURE................5-10
DRAG LINK - INSTALLATION............19-36
DRAG LINK - REMOVAL...............19-36
DRAIN AND REFILL - STANDARD
PROCEDURE, FLUID.....21-441,21-476,21-507,
21-537,21-571
DRAIN CIRCUIT - OPERATION, FUEL.....14-67
DRAINBACK VALVE - DESCRIPTION,
TORQUE CONVERTER................21-261
DRAINBACK VALVE - OPERATION,
TORQUE CONVERTER................21-261
DRAINBACK VALVE - STANDARD
PROCEDURE, TORQUE CONVERTER.....21-261
DRAINING AT FUEL FILTER - STANDARD
PROCEDURES, WATER................14-47
DRAW TEST - STANDARD PROCEDURE,
IGNITION-OFF.......................8F-11
DRIP RAIL WEATHERSTRIP -
INSTALLATION.......................23-91
DRIP RAIL WEATHERSTRIP - REMOVAL . . 23-91
DRIP RAIL WEATHERSTRIP RETAINER -
INSTALLATION.......................23-92
DRIP RAIL WEATHERSTRIP RETAINER -
REMOVAL..........................23-92
DRIVE - DIAGNOSIS AND TESTING,
ELECTRONICALLY CONTROLLED
VISCOUS FAN........................7-52
DRIVE - DIAGNOSIS AND TESTING,
VISCOUS FAN........................7-50
DRIVE BELT - 3.7L / 4.7L -
INSTALLATION........................7-26
DRIVE BELT - 3.7L / 4.7L - REMOVAL.....7-26
DRIVE BELT - 5.9L DIESEL -
INSTALLATION........................7-29
DRIVE BELT - 5.9L DIESEL - REMOVAL....7-29
DRIVE BELT - DIAGNOSIS AND TESTING,
ACCESSORY.....................7-24,7-27
DRIVE LEARN - STANDARD PROCEDURE . . 8E-23
DRIVE SYSTEM - DESCRIPTION, TIMING
. . 9-166
DRIVE SYSTEM - OPERATION, TIMING
....9-166
DRIVE VISCOUS CLUTCH - 5.9L DIESEL
- DESCRIPTION, FAN
...................7-52
DRIVE VISCOUS CLUTCH - 5.9L DIESEL
- OPERATION, FAN
....................7-52
DRIVE VISCOUS CLUTCH-GAS ENGINES
- DESCRIPTION, FAN
...................7-50DRIVE VISCOUS CLUTCH-GAS ENGINES
- OPERATION, FAN....................7-50
DRIVER AIRBAG - ASSEMBLY..........8O-26
DRIVER AIRBAG - DESCRIPTION........8O-23
DRIVER AIRBAG - DISASSEMBLY........8O-25
DRIVER AIRBAG - INSTALLATION.......8O-28
DRIVER AIRBAG - OPERATION..........8O-23
DRIVER AIRBAG - REMOVAL...........8O-24
DRIVER DOOR MODULE - DESCRIPTION . . . 8N-5
DRIVER DOOR MODULE - DIAGNOSIS
AND TESTING........................8N-6
DRIVER DOOR MODULE - INSTALLATION . . 8N-7
DRIVER DOOR MODULE - OPERATION....8N-5
DRIVER DOOR MODULE - REMOVAL......8N-7
DRIVER SEAT SWITCH - DESCRIPTION . . . 8N-14
DRIVER SEAT SWITCH - DIAGNOSIS
AND TESTING.......................8N-14
DRIVER SEAT SWITCH - INSTALLATION . . 8N-15
DRIVER SEAT SWITCH - OPERATION.....8N-14
DRIVER SEAT SWITCH - REMOVAL......8N-15
DRIVER SIDE BEZEL - INSTALLATION,
INSTRUMENT PANEL..................23-58
DRIVER SIDE BEZEL - REMOVAL,
INSTRUMENT PANEL..................23-58
DROP - STANDARD PROCEDURE,
TESTING FOR A VOLTAGE...........8W-01-10
DRUM IN HAT BRAKE - CLEANING,
REAR...............................5-39
DRUM IN HAT BRAKE - INSPECTION,
REAR...............................5-39
DUAL REAR WHEEL INSTALLATION -
STANDARD PROCEDURE...............22-12
DUAL WHEELS - INSTALLATION, REAR....5-35
DUAL WHEELS - REMOVAL, REAR........5-34
DUCT - INSTALLATION, DEFROSTER.....24-32
DUCT - INSTALLATION, FLOOR
DISTRIBUTION.......................24-34
DUCT - REMOVAL, DEFROSTER.........24-32
DUCT - REMOVAL, FLOOR
DISTRIBUTION.......................24-33
DUCTS - INSTALLATION, INSTRUMENT
PANEL.............................24-37
DUCTS - INSTALLATION, INSTRUMENT
PANEL DEMISTER....................24-37
DUCTS - REMOVAL, INSTRUMENT
PANEL.............................24-37
DUCTS - REMOVAL, INSTRUMENT
PANEL DEMISTER....................24-36
DUST BOOT - INSTALLATION,
EXTENSION HOUSING SEAL.....21-476,21-571
DUST BOOT - REMOVAL, EXTENSION
HOUSING SEAL...............21-476,21-571
ECM - DESCRIPTION...................8E-3
ECM - OPERATION....................8E-3
EFFECTS OF INCORRECT FLUID LEVEL -
DIAGNOSIS AND TESTING......21-201,21-366
ELECTRICAL CONTROLS - DIAGNOSIS
AND TESTING, OVERDRIVE............21-262
ELECTRONIC GOVERNOR -
DESCRIPTION......................21-197
ELECTRONIC GOVERNOR -
INSTALLATION......................21-200
ELECTRONIC GOVERNOR - OPERATION . . 21-198
ELECTRONIC GOVERNOR - REMOVAL . . . 21-199
ELECTRONIC VARIABLE BRAKE
PROPORTIONING - DESCRIPTION........5-49
ELECTRONIC VARIABLE BRAKE
PROPORTIONING - OPERATION..........5-49
ELECTRONIC VEHICLE INFO CENTER -
DESCRIPTION........................8M-7
ELECTRONIC VEHICLE INFO CENTER -
INSTALLATION.......................8M-9
ELECTRONIC VEHICLE INFO CENTER -
OPERATION.........................8M-7
ELECTRONIC VEHICLE INFO CENTER -
REMOVAL...........................8M-9
ELECTRONIC VEHICLE INFORMATION
CENTER - DIAGNOSIS AND TESTING
......8M-8
ELECTRONIC VEHICLE INFORMATION
CENTER PROGRAMMING - STANDARD
PROCEDURE
.........................8M-8
ELECTRONICALLY CONTROLLED
VISCOUS FAN DRIVE - DIAGNOSIS
AND TESTING
........................7-52
ELECTROSTATIC DISCHARGE (ESD)
SENSITIVE DEVICES - STANDARD
PROCEDURE
......................8W-01-8
ELEMENT - DESCRIPTION, HEATED SEAT
. . 8G-9ELEMENT - DIAGNOSIS AND TESTING,
HEATED SEAT .......................8G-10
ELEMENT - INSTALLATION, AIR
CLEANER..................9-107,9-21,9-249
ELEMENT - INSTALLATION, HEATED
SEAT ..............................8G-10
ELEMENT - OPERATION, HEATED SEAT . . . 8G-10
ELEMENT - REMOVAL, AIR CLEANER....9-107,
9-21,9-248
ELEMENT - REMOVAL, HEATED SEAT....8G-10
EMISSION CONTROL INFORMATION
(VECI) - DESCRIPTION, VEHICLE.......Intro.-2
END - DIAGNOSIS AND TESTING, OUTER
TIE ROD............................19-32
END - INSTALLATION, OUTER TIE ROD . . . 19-33
END - INSTALLATION, TIE ROD.........19-37
END - REMOVAL, OUTER TIE ROD.......19-32
END - REMOVAL, TIE ROD.............19-37
ENGINE - 3.7L - DESCRIPTION............9-3
ENGINE - 5.7L - DESCRIPTION..........9-182
ENGINE - DESCRIPTION, COOLING
SYSTEM FLOW 3.7L/4.7L/5.7L............7-1
ENGINE - DESCRIPTION, FUEL
REQUIREMENTS - DIESEL...............0-1
ENGINE - DIAGNOSIS AND TESTING,
COOLING SYSTEM DIESEL...............7-7
ENGINE - DIAGNOSIS AND TESTING,
DIESEL.............................11-5
ENGINE - DIAGNOSIS AND TESTING,
GAS................................11-4
ENGINE - FIRING ORDER / CABLE
ROUTING, 5.7L V-8....................8I-4
ENGINE - INSTALLATION...............9-242
ENGINE - INSTALLATION, 3.7L/4.7L AND
5.7L HEMI.....................24-59,24-73
ENGINE - INSTALLATION, 5.9L DIESEL . . . 24-54,
24-58,24-72
ENGINE - INSTALLATION, DIESEL........8R-17
ENGINE - INSTALLATION, EXCEPT
DIESEL............................8R-17
ENGINE - INSTALLATION, GAS..........19-26
ENGINE - REMOVAL..................9-241
ENGINE - REMOVAL, 3.7L/4.7L AND 5.7L
HEMI.........................24-57,24-71
ENGINE - REMOVAL, 5.9L DIESEL . . 24-53,24-56,
24-70
ENGINE - REMOVAL, DIESEL...........8R-16
ENGINE - REMOVAL, EXCEPT DIESEL....8R-15
ENGINE - REMOVAL, GAS..............19-25
ENGINE - SPECIFICATIONS, 3.7L.........9-12
ENGINE - SPECIFICATIONS, 4.7L.........9-99
ENGINE - STANDARD PROCEDURE,
DRAINING COOLING SYSTEM 5.9L
DIESEL.............................7-18
ENGINE - STANDARD PROCEDURE,
REFILLING COOLING SYSTEM 5.9L
DIESEL.............................7-19
ENGINE - TORQUE, FUEL SYSTEM -
DIESEL............................14-48
ENGINE 5.9L DIESEL - DESCRIPTION.....9-232
ENGINE BLOCK - CLEANING . . . 9-128,9-205,9-39
ENGINE BLOCK - DESCRIPTION.....9-128,9-38
ENGINE BLOCK - INSPECTION . 9-128,9-205,9-39
ENGINE BLOCK HEATER - 5.9L DIESEL -
DESCRIPTION........................7-37
ENGINE BLOCK HEATER - 5.9L DIESEL -
INSTALLATION........................7-38
ENGINE BLOCK HEATER - 5.9L DIESEL -
OPERATION..........................7-38
ENGINE BLOCK HEATER - 5.9L DIESEL -
REMOVAL...........................7-38
ENGINE BLOCK HEATER - DESCRIPTION . . . 7-36
ENGINE BLOCK HEATER - DIAGNOSIS
AND TESTING........................7-36
ENGINE BLOCK HEATER - INSTALLATION . . . 7-37
ENGINE BLOCK HEATER - OPERATION.....7-36
ENGINE BLOCK HEATER - REMOVAL......7-37
ENGINE CONTROL MODULE -
INSTALLATION........................8E-4
ENGINE CONTROL MODULE - REMOVAL . . . 8E-4
ENGINE COOLANT - DESCRIPTION
........7-31
ENGINE COOLANT - DESCRIPTION
.........0-3
ENGINE COOLANT TEMPERATURE
SENSOR - DESCRIPTION
...............7-38
ENGINE COOLANT TEMPERATURE
SENSOR - INSTALLATION
...............7-41
ENGINE COOLANT TEMPERATURE
SENSOR - OPERATION
.................7-38
DRINDEX 11
Description Group-Page Description Group-Page Description Group-Page