1998 DODGE RAM 1500 Door

[x] Cancel search: Door

Page 2357 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual INTERIOR
TABLE OF CONTENTS
page page
INTERIOR
CAUTION.............................62
4WD FLOOR SHIFT BOOT
REMOVAL.............................62
INSTALLATION.........................62
A-PILLAR TRIM/G

Page 2358 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (2) Install the shifter knob and nut and tighten to
27 N´m (20 ft. lbs.).
(3) Position the insert and seat into the knob fully.
A-PILLAR TRIM/GRAB HANDLE
REMOVAL
(1) Open the trim plugs and remove th

Page 2359 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual (3) Pull seat belt out of the trim panel through the
slot provided. (Fig. 5)
INSTALLATION
QUAD CAB
(1) Route the shoulder belt through the slot in the
trim.
(2) Position the trim and seat the attachme

Page 2361 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual COAT HOOK
REMOVAL
(1) Using a trim stick C-4755 or equivalent, pry
down the release clip and remove the hook. (Fig. 9)
INSTALLATION
(1) Snap the coat hook into the sheet metal and
seat the base of the

Page 2363 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual HEADLINER
REMOVAL
(1) Remove the a-pillar trim. (Refer to 23 - BODY/
INTERIOR/A-PILLAR TRIM - REMOVAL)
(2) Remove the upper b-pillar trim. (Refer to 23 -
BODY/INTERIOR/B-PILLAR UPPER TRIM -
REMOVAL)
(

Page 2366 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual INSTALLATION
(1) Snap the visor support into the sheet metal
and seat the release clip fully.
BODY VENT
REMOVAL
(1) Remove the cab back panel trim. (Refer to 23 -
BODY/INTERIOR/REAR CAB BACK PANEL TRI

Page 2381 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual STATIONARY GLASS
TABLE OF CONTENTS
page page
BACKLITE
REMOVAL.............................86
INSTALLATION.........................86
BACKLITE VENT GLASS
REMOVAL.............................87
INSTALLA

Page 2383 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual WINDSHIELD
WARNING
WINDSHIELD SAFETY PRECAUTIONS
WARNING: DO NOT OPERATE THE VEHICLE
WITHIN 24 HOURS OF WINDSHIELD INSTALLATION.
IT TAKES AT LEAST 24 HOURS FOR URETHANE
ADHESIVE TO CURE. IF IT IS NOT