1998 DODGE RAM 1500 Schematics

[x] Cancel search: Schematics

Page 1975 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual OPERATION
NOTE: Refer to the Hydraulic Schematics for a
visual aid in determining valve location, operation
and design.
CHECK BALLS
CHECK BALL NUMBER DESCRIPTION
1 Allows either the manual valve to pu

Page 2014 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual AUTOMATIC TRANSMISSION - 45RFE/545RFE
TABLE OF CONTENTS
page page
AUTOMATIC TRANSMISSION - 45RFE/545RFE
DESCRIPTION........................312
OPERATION..........................313
DIAGNOSIS AND TEST

Page 2019 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual DIAGNOSIS AND TESTING - HYDRAULIC
PRESSURE TEST
An accurate tachometer and pressure test gauges
are required. Test Gauge C-3293-SP has a 300 psi
range and is used at all locations where pressures
exce

Page 2040 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual SCHEMATICS AND DIAGRAMS
HYDRAULIC SCHEMATICS
HYDRAULIC FLOW IN PARK/NEUTRAL
DRAUTOMATIC TRANSMISSION - 45RFE/545RFE 21 - 337
AUTOMATIC TRANSMISSION - 45RFE/545RFE (Continued)

Page 2111 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual INSTALLATION
(1) Place TRS selector plate in the PARK position.
(2) Position the transmission solenoid/TRS assem-
bly onto the valve body. Be sure that both alignment
dowels are fully seated in the va

Page 2597 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual DEPLOYMENT - STANDARD
PROCEDURE, SERVICE AFTER A
SUPPLEMENTAL RESTRAINT............8O-7
DETECTION ASSY - DESCRIPTION,
NATURAL VAC LEAK..................25-23
DETECTION ASSY - INSTALLATION,
NATURAL VAC

Page 2603 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual HEATED SEAT MODULE - INSTALLATION . . . 8E-7
HEATED SEAT MODULE - INSTALLATION . . 8G-15
HEATED SEAT MODULE - OPERATION.....8E-6
HEATED SEAT MODULE - OPERATION....8G-14
HEATED SEAT MODULE - REMOVAL...

Page 2615 of 2627

DODGE RAM 1500 1998 2.G Workshop Manual RKE TRANSMITTER CUSTOMER
PREFERENCES - STANDARD
PROCEDURE.........................8N-8
RKE TRANSMITTER PROGRAMING -
STANDARD PROCEDURE...............8N-9
ROCKER ARM / ADJUSTER ASSEMBLY -
DESCRIPTION..
Page:   < prev 1-8 9-16