Page 279 of 1002

Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing Chain
- Connect electrical harness connectors to camshaft position
sensors and VANOS solenoid valves.
- Remove BMW special locking tools from rear of cylinder
head.
- Remove cranltshaft locking tool and replace sealing plug.
Install intake camshaft baffle and cylinder head cover.
Checlc for correct seating of half-moon seals (A) in back of
cylinder head cover.
Use a small amount of Three Bond 1209
O or equivalent
sealant at corners
(B) of half-moon cutouts.
Similarly, seat gasket and
seal corners in front of cylinder
head, at VANOS control unit.
Tightening torque
Cylinder head cover to cylinder head
(M6) 10 Nm (89 in-lb)
- Remainder of installation is reverse of removal.
Tightening torques
Radiator fan (viscous clutch) to
coolant pump 40
Nm (30 ft-lb)
Spark plug to cylinder head
25 Nrn (18 ft-lb)
VANOS timing, checking and adjusting
(M52 TU and M54 engines)
Use this procedure to check and, if necessary, adjust cam-
shaft timing. This procedure assumes that the cylinder head
cover and intake
camshaft plastic baffle have been removed.
Also, be sure the cooling fan and the spark plugs have been
removed.
Remove primary camshaft chain tensioner cylinder
(arrow).
~~ ~ ~~ ~--~
CA UTlOAC
Primary camshaft chain tensioning piston is under spring
pressure.
Page 281 of 1002

Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain1
< With compressed air line connected, turn engine at least
twice in direction of rotation until cylinder
1 intake and ex-
haust camshaft lobes (arrows) face each other.
Do not rotate engine counterclockwise to reach the top dead
center position. Instead, complete another two complete ro-
Remove sealing plug from bore at bellhousing. Secure crank-
shaft in
TDC position with BMW special tool 11 2 300 (ar-
row).
- Remove cylinder head cover studs at rear of cylinder head.
< Place BMW special tool 11 3 240 over camshafts ends and
measure clearance of tool to cylinder head surface.
NOTE-
If the exhaust side of the tool (A) is not flush with the head,
adjust camshaft timing as described below.
Due to flexible sprocket design and VANOS control unit tol-
erances and play, the
intake side of special tool 11 3 240
(B) may be up to 1 mm (0.04 in) above the surface of the
cylinder head. This is normal. Reassemble engine. Other-
wise, adjust camshaft timing as described below.
- Remove double VANOS control unit. See VANOS control
unit, removing
(M52 TU and M54 engines).
< Press down on secondary chain tensionerand lock into place
using BMW special tool
11 3 292 or equivalent pin or drift.
Page 283 of 1002
Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain]
4 Pull out exhaust camshaft splined shaft to stop.
- Make sure camshafts are secured in TDC position using
BMW soecial tools 11 3 240 and 11 3 244.
4 Preload primary chain tensioning rail:
Tighten adjusting screw on
BMW special tool 11 4 220.
Tightening torque
Primary chain tensioner preload
0.7 Nm (6 in-lb)
4 Preload exhaust camshaft spring plate by pressing on im-
pulse wheel. Tighten mounting nuts
(arrows) by hand. Do
not tighten fully.
Page 293 of 1002
Downloaded from www.Manualslib.com manuals search engine
... -.
rpp- --- Camshaft Timing Chain1
Timing chains, installing
(M52 TU and M54 engines)
CAUTIOI\C
The procedure outlined below assumes that the camshaits
are lockedin the
TDC installation position with speciallocling
tools as shown earliel:
- inspect timing chain sprockets. Inspect guide rail and ten-
sioner rail for damage. Replace any part that is worn
or dam-
aged.
NOTE-
If any sprockets are being replaced due to wear, the chain
should also be replaced.
4 Primary timing chain assembly
1. Primary chain tensioner
2. Chain tensioner rail
3. Cranltshaft sprocket
4. Exhaust camshaft sprocket
5. Primary chain
6. Anchor bolt
7. Guide rail
8. Anchor bolt
9. Woodruff key
- Install primary timing chain to crankshaft sprocltet and hang
upper end from exhaust camshaft.
- If necessary, replace crankshaft radial seal in cover. See
Crankshaft oil seal, replacing (M52 TU and M54 engines).
Page 294 of 1002

Downloaded from www.Manualslib.com manuals search engine
(camshaft Timing Chain
- To install lower timing case cover:
- Clean cover and cylinder block sealing surfaces
Use new
gaskets and coolant pipe O-ring.
Remove timing chain cover dowel pins from engine block.
Drive timing cover dowels in until they just protrude slightly
from sealing surface.
Apply a small bead of silicon sealer (Three Bond 1209
63
or equivalent) to corners of cylinder head where timing
cover meets cylinder head and engine block.
Tap cover into position until firmly seated.
lnstall all bolts hand tight, including two Torx bolts from
above.
Install secondary chain lower guide.
Tighten cover mounting bolts alternately and in stages.
Tightening torque
Lower timing cover to cylinder
bloclc (M6) 10 Nrn (89 in-lb)
- Install oil pan with new gasket. See 119 Lubrication Sys-
tem.
Tightening torque
Oil pan
to engine bloclc (M6)
8.8 grade
10.9 grade 10 Nrn (89 in-lb)
12 Nm
(9 ft-lb)
- Align damper assembly with lteyway and tap into place. In-
sert new center bolt with washer.
CAUTION-
Inspect woodruff key for damage before installing hub
assembly.
- Attach special tools 11 8 20011 1 8 190 to damper assembly.
Counterhold damper with
11 8 190 while tightening center
bolt.
CAUTION-
Do not use BMW special tool 1 I 2 300 to hold crankshaft
stationary to tighten cranl(shaft hub center bolt. Use only
the special tools specified, or equivalent hub holding tool.
Have a second person hold special tool
11 8 190 while
tightening center crankshaft bolt.
Tightening torque Crankshaft hub to crankshaft 410 Nrn
(300
ft-lb)
Page 295 of 1002
Downloaded from www.Manualslib.com manuals search engine
Camshaft Timing chain/
Fit top sprocltet to primary timing chain and install on exhaust
camshaft so that pointer (arrow) on sprocltet lines up with
cylinder head sealing surface.
Position sprocket so that chain slack is on tensioner rail side.
4 Insert BMW special tool 11 4 220 in cylinder head and screw
in adjustment screw
by hand just until it contacts tensioning
rail and chain slack is removed.
NOTE-
BMW special tool 71 4 220 is an adjustable primary chain
tensioner that simulates the function of the tensioner.
- Make sure arrow on top primary sprocket is still lined up with
upper edge of cylinder head. Reposition sprocket if neces-
sary.
Page 296 of 1002
Downloaded from www.Manualslib.com manuals search engine
11 7-60
Camshaft Timing Chain
< Install and tighten down threaded locating studs (arrows) in
end of exhaust camshaft.
Tightening torque Exhaust camshaft locating
stud 20 Nrn (15 ft-lb)
4 Install secondary chain tensioner on cylinder head.
- Make sure tensioner is locked in compressed position as
described earlier.
Fit exhaust camshaft splined sleeve, aligning gap in sleeve
splines with corresponding gap on
camshaft splines
(arrows).
Page 297 of 1002
Downloaded from www.Manualslib.com manuals search engine
- Camshaft Timing chain]
< Slide splined shaft onto exhaust camshaft, aligning larger
tooth with corresponding gap of splined sleeve (arrows).
Slide splined shaft in further until
3 small or elongated slots
in splined sleeve are centered to
3 threaded holes in
sprocket.
4 Place intake and exhaust sprocltets in BMW special tool 11 6
180. Position spline gap on intalte sprocket (arrow) as shown
and place secondary chain on sprocltets.
< Carefully remove chain and sprockets from tool and slide
onto camshafts. Align gap in
intalte sprocket splines with cor-
responding gap in camshaft splines (arrow).
CAUTION-
Do not alterposltion ofsprocl(ets with respect to chain when
removing from
specfa1 tool 1 1 6 180.
4 Slide splined shaft onto intake camshaft until approx. 1 mm
(0.04 in.) of splines can still be seen.