24-73
Note:
Socket 3 on the connector is the Ground (GND) connection from the
engine control module.
If the specification is not attained: - Connect hand-held multimeter (voltage measurement range) between
sockets 2 and 3 of connector.
- Operate starter briefly.
Specification: approx. battery voltage
- Check wiring Page 24
-74
.
If the specification is not attained: - Connect hand-held multimeter (voltage measurement range) between
sockets 3 and 4 of connector.
- Switch ignition on.
Specification: approx. 5 V
- Check wiring Page 24
-74
.
Pa
ge 84 of 90 Motronic Multi
port Fuel In
jection
(MFI
) system, servicin
g
11/22/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.FU04.24.1