Page 1 of 47
13-1
 
     
Engine, disassembling and 
assembling 
     
Lock carrier, moving into service 
position
 
     
Special tools and equipment  
    
Special tool 3369
Pa
ge 1 of 47 En
gine, disassemblin
g and assemblin
g
11/21/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.GE06.13.1 
         
        
        
     
        
        Page 20 of 47
13-20
      
Installing  
     
-  Attach ribbed belt to pulleys from crankshaft and 
vane pump and, if necessary, pull up with 
auxiliary tool. 
    
-  Swivel tensioner for ribbed belt in direction of arrow.
-  Install ribbed belt over Generator pulley last. Release tensioner.
-  Check that ribbed belt is properly seated.
-  Fit ribbed belt for A/C compressor.
 
Ribbed belt routing   Fig.   2
 ,   Page 13
-17
    
-  Attach torque wrench at "7 o'clock position" as illustrated to hex on 
tensioner and pretension to 30 Nm. 
-  While tensioning, tighten bolts -A- to 23 Nm.
-  Start engine and check belt running.
Pa
ge 20 of 47 En
gine, disassemblin
g and assemblin
g
11/21/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.GE06.13.1 
         
        
        
     
        
        Page 42 of 47
13-41
      
Removing  
     
Engine in vehicle. 
     Lock carrier must be in service position   
Page 13
-1 . 
    
-  Remove engine cover -arrows-.
-  Remove ribbed belt and tensioner for ribbed belt   Page 13
-18
 .
    
-  Secure pulley for viscous fan with pin punch -1- and remove using 
Allen key -2-. 
-  Remove viscous fan from mounting.
-  Remove upper toothed belt guard.
Pa
ge 42 of 47 En
gine, disassemblin
g and assemblin
g
11/21/2002 htt
p://127.0.0.1:8080/audi/servlet/Dis
play?action=Goto&t
yp
e=re
pair&id=AUDI.B5.GE06.13.1