1992 MAZDA PROTEGE check engine

[x] Cancel search: check engine

Page 49 of 1164

MAZDA PROTEGE 1992  Workshop Manual . 
ON-VEHICLE MAINTENANCE 
Installation note 
Cylinder head bolt Bl 
1. Apply clean engine oil to the bolt threads and seat faces. 
2. Install the cylinder head bolts. 
3. Tighten the cylinder head bo

Page 54 of 1164

MAZDA PROTEGE 1992  Workshop Manual Bl ON-VEHICLE MAINTENANCE 
01 EOBX-056 
23UOBi -0: 
Steps After Installation 
1. Lower the vehicle. 
2. Connect the negative battery cable. 
3. Start the engine and check the ignition timing. 
(Refer

Page 99 of 1164

MAZDA PROTEGE 1992  Workshop Manual ASSEMBLY Bl 
I- 
r 
I 03UOBl-12 
A NO.1 
M 
9MUOB2-14 I ‘NDENTIFICATION MARK 
03UOBl-02 
I 
23UOBl-04 
05UOBX.179 
2. Set the stopper bolt (49 LO1 1 005) so that the depth L is 
as specified. 
Depth

Page 132 of 1164

MAZDA PROTEGE 1992  Workshop Manual INSTALLATION 
OWOBX-27! 
Resonance chamber 
1. Install the resonance chamber. 
Tightening torque: 
7.8-l 1 N-m (80-I 10 cm-kg, 69-95 in-lb) 
Undercover and side cover 
1. Install the undercover and si

Page 137 of 1164

MAZDA PROTEGE 1992  Workshop Manual ENGINE TUNE-UP PROCEDURE 82 
ENGINE TUNE-UP PROCEDURE 
PREPARATION 
SST 
49 BO19 9AO 
drive belt tension 
23UOB2-048 
OBUOBX-158 
I’ , 
OSJOBX-001 
V BELT 
V RIBBED BELT 
_ 
x 0 x 
3 
L 
03UOB2-005

Page 138 of 1164

MAZDA PROTEGE 1992  Workshop Manual B2 ENGINE TUNE-UP PROCEDURE 
ALTERNATOR DRIVE BELT 
2311082-00 
P/S OIL PUMP 
DRIVE BELT 
- 
A/C AND P/S OIL 
PUMP DRIVE BELT 
23UOB2-001 
1 
23UOB2-00 
23UOB2-OC 
3. Check the drive belt deflection b

Page 139 of 1164

MAZDA PROTEGE 1992  Workshop Manual ENGINE TUNE-UP PROCEDURE 92 
23UOB2-OC 
DRIVE PULLEY 
I I 
2311082.010 
HLA 
I Problem 
1. Noise when engine is started immedi- 
ately after oil is changed. 
2. Noise when engine is started after set-

Page 140 of 1164

MAZDA PROTEGE 1992  Workshop Manual 82 ENGINE TUNE-UP PROCEDURE 
03UOB2-013 
IGNITION TIMING, IDLE SPEED 
Preparation 
1. Warm up the engine to normal operating temperature. 
2. Turn all electric loads OFF. 
3. Connect the 
SST to the d
Page:   < prev 1-8 9-16 17-24 25-32 33-40 41-48 ... 152 next >