1991 FORD SIERRA distributor

[x] Cancel search: distributor

Page 3 of 18

FORD SIERRA 1991 2.G DOHC Engine Workshop Manual Torque wrench settingsNmlbf ft
Main bearing cap bolts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .90 to 10466 to 77
Connecting rod (big-end bearing cap) bolts:
Stage 1 .

Page 8 of 18

FORD SIERRA 1991 2.G DOHC Engine Workshop Manual Dismantling 
1Refer to Chapter 2, PartA, Section 18,
paragraphs 1 to 8 inclusive.
2A suitable selection of splined and Torx
sockets will be required to remove many of
the bolts when dismantling the en

Page 10 of 18

FORD SIERRA 1991 2.G DOHC Engine Workshop Manual should be fitted dry. Drive in the new seal
using a suitable metal tube, making sure that
the seal lip faces into the engine, and taking
care not to damage the timing chain cover
(see illustration).
3

Page 11 of 18

FORD SIERRA 1991 2.G DOHC Engine Workshop Manual Note: New cylinder head bolts, a new cylinder
head gasket, a new timing chain tensioner
plunger assembly, a new upper timing chain
cover gasket, and a new camshaft cover
gasket and reinforcing sleeve

Page 13 of 18

FORD SIERRA 1991 2.G DOHC Engine Workshop Manual 26Insert the three smaller M8 cylinder head
bolts through the top of the timing case and
tighten them to the specified torque. Note that
new bolts must be used, and that they should
be of the latest t

Page 14 of 18

FORD SIERRA 1991 2.G DOHC Engine Workshop Manual 42Fit a new upper timing chain guide to the
plate at the front of the cylinder head.
43Turn the crankshaft clockwise until the
inlet camshaft begins to turn.
44If the chain tensioner plunger piston
pr