Bl INSTALLATION
93GOE 1-73;
03UOBX-84
. .
‘, .
L .G,
. . ‘?.
- -. _ .:
.L ‘.. :-.:
.-_: _. _, _-
.
-_
. :
Cl :- . .
: .._.
. . ._-
;: , ‘. ’
,.. .- -
. ‘L,
93GO3 l-73’
-DEFLECTiON CHfiCKIN:
g3GOBj-717
Bl-22
P/S oil pump and bracket
1. Install the P/S oil pump and bracket.
Tightening torque:
37-52 N-m (3.8-5.3 m-kg, 27-38 ft-lb)
Drive belt
I. fnstall the P/S and/or A/C drive belt.
2. Adjust the drive belt deflections. (Refer to page Bl-2.)
Radiator
and cooling fan assembly
f . Install the radiator and cooling fan assembly.
Tightening torque:
7.8-I 1 N-m (80-I 10 cm-kg, 69-95 in-lb)
2.. Connect the cooling fan connector.
3. Connect the radiator switch connector.
4. Connect the A/C cut switch connector.
5. Connect the oil cooler hose. (ATX)
6. Connect the coolant reservoir hose.
7. Connect the upper and lower radiator
@TX)
Pm
hoses.
Caution
l Position the hose clamp in the original location on
the hose, and squeeze it tightly with large pliers to
ensure a good fit.
Accelerator cable
I. Install the accelerator cable.
2. Adjust the cable deflection by turning nuts @
Deflection: I-3mm (0.04--0.12 in)
-
Battery duct, battery carrier, and battery
I_ install the battery duct.
2. Install the battery carrier.
Tightening torque:
7.8-I 1 N-m (80-110 cm-kg, 69-95 in-lb)
3. Install the battery, cover and the battery bracket.
Tightening torque:
2.9-5.9 N-m (30-60 cm-kg, 26-52 in-lb)
4. Connect the positive battery cable.
INSTALLATION
93G082-7ti
HERE
/+Ju 7
93GOB2-74!
Caution
l Position the hose clamp in the original location on
the hose, and squeeze it lightly with large pliers to
ensure a good fit.
Accelerator cable
1. Install the accelerator
cable.
Tightening torque
@): 7.8-l 1 N4m (80-l 10 cm-kg, 69-95 in-lb)
2. Adjust the cable deflection by turning nuts @ .
Deflection: I-3mm (U&4--0.12 in)
Battery carrier and battery
1 . Install the battery carrier.
Tightening torque:
7.8-l 1 N4m (80-I IO cm-kg, 69-95 in-lb)
2. Install the battery and the battery cover.
3. Install the battery bracket.
Tightening torque:
2.9-5.9 N.m (30-60 cm-kg, 26-52 in-lb)
4. Connect the positive battery cable.
Air cleaner assembly
1. Install the air cleaner assembly.
Tightening torque:
19-25 N-m (1.9-2.6 m-kg, 14-19 ft-lb)
2. Connect the airflow sensor connector.
3. Connect the hoses shown in the figure.
Strut tower bar
I. Instail the strut tower bar.
Tightening torque:
88-108 Narn (9.0-11 .U m-kg, 65-80 ft-lb)
Undercover and side cover
1. Install the undercovers and side covers.
93GOB2-746
82-33