1990 BMW 3 SERIES check engine light

[x] Cancel search: check engine light

Page 102 of 228

BMW 3 SERIES 1990 E30 Workshop Manual Throttle positioner (2BE)
24Special tools are required to carry out a
comprehensive adjustment on the 2BE
carburettor. This work should therefore be left
to a BMW dealer.
13 Fuel injection - 
general

Page 104 of 228

BMW 3 SERIES 1990 E30 Workshop Manual 17 Throttle body- check,
removal and refitting
2
Check
1Detach the air intake duct from the throttle
body (see Section 8) and move the duct out of
the way.
2Have an assistant depress the throttle
peda

Page 105 of 228

BMW 3 SERIES 1990 E30 Workshop Manual gauge to the pressure regulator vacuum hose,
and check for vacuum (engine idling).
11If there is vacuum present, renew the fuel
pressure regulator.
12If there isn’t any reading on the gauge,
check t

Page 106 of 228

BMW 3 SERIES 1990 E30 Workshop Manual 6If the voltage is correct, unplug the
electrical connector and, using an ohmmeter,
check for continuity between the terminals of
the thermotime switch (see illustration).
Continuity should exist.
7Re

Page 107 of 228

BMW 3 SERIES 1990 E30 Workshop Manual 2L-Jetronic systems are equipped with a
separate idle speed control unit (computer)
located under the facia. The idle air stabiliser
valve has an adjusting screw. Early models
are equipped with plasti

Page 112 of 228

BMW 3 SERIES 1990 E30 Workshop Manual 1 General information
The engine electrical systems include all
ignition, charging and starting components.
Because of their engine-related functions,
these components are discussed separately
from bo

Page 114 of 228

BMW 3 SERIES 1990 E30 Workshop Manual 7 Ignition timing (TCI system)-
check and adjustment
4
Warning: Keep hands, equipment
and wires well clear of the
viscous cooling fan during
adjustment of the ignition timing.
Note:This Section descri

Page 117 of 228

BMW 3 SERIES 1990 E30 Workshop Manual 8Use a digital voltmeter for the following
tests:
a) On Bosch systems, connect the positive
probe to connector terminal 5, and the
negative probe to terminal 6 (see
illustration).
b) On Siemens/Telefu